AMERICAN ENERGY - PERMIAN BASIN, LLC Daily Completion Report UNIVERSITY SR HS AEPB WELL NO. 115

Size: px
Start display at page:

Download "AMERICAN ENERGY - PERMIAN BASIN, LLC Daily Completion Report UNIVERSITY SR HS AEPB WELL NO. 115"

Transcription

1 AMERICAN ENERGY - PERMIAN BASIN, LLC AEPB WELL NO /10/16 Number of s (ft) Primary Job - ORIGINAL 57 Ground Elevation (ft) RKB (ft) Secondary Job 10,000 4/8/16 27,948 CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, AEPB 0 NPT, 0 EHS ISSUES ; MIRU C&J SERV. RIG FOR CLEAN OUT AND TCP, RIH WITH 4 5/8 VERRAL SEALED BEARING BIT, 5-1/2" CASING SCRAPER,2-7/8" PH-6 STRING FLOAT, 2 7/8" 7,9# P110 TUBING, LOAD TUBING EVERY 50 JOINTS WITH FRESHWATER TREATED WITH BIOCIDE,STARTED FIGHTING FRICTION AT 11,776 FT (JOINT 381) AT FT ( JOINT 385) PUMPED 10 BBL HIGH VISC SWEEP FOLLOWED WITH FR CIRCULATED TO SURFACE, CONTINUING TO TIH ; CURRENT DEPTH AT TIME OF REPORT IS 12,002 FT CONTINUE CLEAN OUT AND TCP WITH SERVICE RIG Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd Typ NPT 05:00 10: INACTIVE WAITING ON SERV. RIG 10: 10: SAFETY MEETING PJSM 10:45 17: RIG UP/DOWN MIRU SERV. RIG AND ALL RELATED EQUIPMENT 17:45 19: RUN TUBING RIH WITH 4 5/8 VERRAL SEALED BEARING BIT, 5-1/2" CASING SCRAPER, X-OVER SUB 1 JOINT OF TUBING THAN A 2-7/8" STRING FLOAT, 2 7/8" 7,9# PH6 TUBING, LOAD TUBING EVERY 50 JOINTS WITH FRESHWATER TREATED WITH BIOCIDE 19:00 19: SAFETY MEETING PJSM WITH NIGHT SHIFT 19:15 03: RUN TUBING CONTINUE RIH 03:15 04: CLEAN OUT AT 11,776 FT (381 JOINTS IN ) STARTED FIGHTING FRICTION, PUMPED 10 BBL HIGH VISC SWEEP, FOLLOWED BY FR PUMPING AT 4 BPM, RETURNED SWEEP TO SURFACE 04: 05: RUN TUBING CONTINUE TO RIH Time Inspected By Description 10: SAFETY MEETING JASON COLLINSWORTH PJSM 19:00 SAFETY MEETING JUSTIN STRINGER PJSM Workover Rig Contractor C & J Bit Information Size (in) 4 5/8 Rig Number Make Model Length (ft) 0.56 Perforation Intervals Bit ROCK BIT Serial Number Rig SERVICE Time Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 472,353 Depth In (ft Depth Out

2 AMERICAN ENERGY - PERMIAN BASIN, LLC AEPB WELL NO /11/16 Number of s (ft) Primary Job - ORIGINAL 57 Ground Elevation (ft) RKB (ft) Secondary Job 10,000 4/8/16 26,598 CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, AEPB 0 NPT, 0 EHS ISSUES; CONTINUE TO TIH W/BHA AND WORKSTRING,DUE TO FRICTION AT 458 JTS., (14163') RU TO PUMP BOTTOMS UP W/ FR;AFTER BOTTOMS UP W/FR PIPE WAS STILL STICKY; PUMP A SLUG OF POP AT.25/10 FOR ANOTHER BOTTOMS UP;POP DID NOT WORK; RU SWIVEL; TIH WITH POWER SWIVEL AND BHA WORKSTRING ;DUE TO FRICTION AT JOINT 524 (16,222') CIRCULATE 10/10/10 BBL HIGH VISC SWEEP BOTTOMS UP, GETTING CEMENT TAILINGS IN THE RETURNS CONTINUE TO TIH WITH POWER SWIVEL AND BHA WORKSTRING.TIH W/SWIVEL BHA AND WORKSTRING, STILL GETTING LIGHT CEMENT IN RETURNS, STARTED GETTING HEAVY CEMENT IN RETURNS AT JOINT 5 (16,312 FT ) AT JOINT 538 (16,575 FT) ONLY AVERAGING 41.6 FT PER HOUR SEEING HEAVY CEMENT IN THE RETURNS, DECISON WAS MADE TO PUMP A SWEEP FOLLOWED WITH FRESH WATER AND BECCA LUBE AT.50 GAL/10BBLS AND POOH STANDING BACK IN THE DERRICK, ORDER NEW BHA,, LAYING DOWN POWER SWIVEL START PULLING STANDS AT TIME OF REPORT POOH STANDING BACK IN THE DERRICK, RUN NEW BHA TO MILL CEMENT Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd Typ NPT 05:00 06: TRIPPING TIH W/ BHA AND WORKSTRING 06:15 07: CLEAN OUT DUE TO FRICTION AT 458 JTS., (14163') RU TO PUMP BOTTOMS UP W/ FR 07:45 09: CLEAN OUT AFTER BOTTOMS UP W/FR PIPE WAS STILL STICKY; PUMP A SLUG OF POP AND.25/10 FOR ANOTHER BOTTOMS UP 09:15 10: RIG UP/DOWN POP DID NOT WORK; RU SWIVEL 10:15 18: TRIPPING TIH W/SWIVEL BHA AND WORKSTRING 18:00 19: CLEAN OUT DUE TO FRICTION AT JOINT 524 (16,222') CIRCULATE 10/10/10 BBL HIGH VISC SWEEP BOTTOMS UP, GETTING CEMENT TAILINGS IN THE RETURNS. 19: 03: TRIPPING TIH W/SWIVEL BHA AND WORKSTRING, STILL GETTING LIGHT CEMENT IN RETURNS, STARTED GETTING HEAVY CEMENT IN RETURNS AT JOINT 5 (16,312 FT ) AT JOINT 538 (16,575 FT) ONLY AVERAGING 41.6 FT PER HOUR SEEING HEAVY CEMENT IN THE RETURNS, DECISON WAS MADE TO PUMP A SWEEP FOLLOWED WITH FRESH WATER AND BECCA LUBE AT.50 GAL/10BBLS AND POOH STANDING BACK IN THE DERRICK, ORDER NEW BHA 03:15 04: CLEAN OUT PUMP HIGH VISC SWEEP AND FRESH WATER WITH BECCA LUBE.50GAL/10BBL 04:45 05: GENERAL OPERATIONS LAY DOWN POWER SWIVEL TO START PULLING STANDS NPT Problem OTHER SubTyp OTHER Description TRICAN BPS FAILED TO OPEN 4/8/16 Failed Item Accountable Party TRICAN WELL SERVICE Time Inspected By Description 05:01 SAFETY MEETING JASON COLLINSWORTH PJSM 17:00 SAFETY MEETING JUSTIN STRINGER PJSM Workover Rig Contractor C & J Bit Information Size (in) 4 5/8 Rig Number Make Model Length (ft) 0.56 Perforation Intervals Bit ROCK BIT Serial Number Rig SERVICE Time Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 498,540 Dur Depth In (ft Depth Out

3 AMERICAN ENERGY - PERMIAN BASIN, LLC AEPB WELL NO /12/16 Number of s (ft) Primary Job - ORIGINAL 57 Ground Elevation (ft) RKB (ft) Secondary Job 10,000 4/8/16 28,875 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, AEPB; COMP SUPER, WES WILSON, NEW TECH; COMP SUP, DAN CURTIS, NEW TECH 0 NPT, 0 EHS ISSUES; FINISH PULLING OUT WITH BIT AND SCRAPPER, RIG UP NEW BHA TO DRILL CEMENT. MU 4 5/8 DRAG BIT, MOTOR, AGITATOR, AV SUB, JARS, BPV, FLOAT SUB, 1 JT, FLOAT SUB, 1 JT, RN NIPPLE. RUNNING IN WITH BHA ; WASH WITH SWIVEL FROM JT 537 (16644) TO JT 551 (17079), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 2800 PSI; RETURNS LIGHT CEMENT; CHEMS PIPE ON PIPE.25 /10, PUMP 10 BBL.25/10 SLUG OF BECCA LUBE EVERY 4 JTS TO HELP WITH FRICTION; CIRCULATE 10 BBL 80 VIS SWEEP TO SURFACE LIGHT CEMENT IN RETURNS; CONTINUE WASHING WITH SWIVEL JT 551 (17079) TO JT 556 (17254), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS TRACE OF CEMENT; CHEMS PIPE ON PIPE.25 /10, PUMP 10 BBL SLUG OF BECCA LUBE EVERY 4 JTS; FIGHTING FRICTION SEVERAL STALLS ON SWIVEL; NOT SEEING ANY DIFF PRESSURE SHOWING INDICATIONS OF CEMENT. DRILL OUT CEMENT Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd Typ NPT 05:00 07: TRIPPING TOH STANDING BACK 07:00 07: SAFETY MEETING DISCUSSED TODAY'S ACTIVITIES, PINCHPOINTS, TRIP HAZARDS, EMERGENCY PROCEDURES, RANCH RULES, SPEED LIMIT, HOUSE KEEPING. 07:15 12: TRIPPING FINISH OUT OF WITH BHA. SCRAPPER AND 4 5/8 JZ BIT IN GOOD SHAPE. CLOSE BOP'S. PREPARE TO INSTALL NEW BHA MOTOR TO DRILL CEMENT. 12:45 13: RIG UP/DOWN RIG UP TOP NOTCH BHA: ITEM LENGTH DRAG BIT 4.625' MOTOR 13.81' AGITATOR 4.' AV SUB 0.56' JARS 4.60' BPV 1.40' X-OVER 0.64' FLOAT SUB 1.85' FLOAT SUB 1.82' RN NIPPLE 1.00' TOTAL LENGTH =.28 FEET TEST MOTOR AND ALL COMPONENTS, GOOD TEST (3.5 BPM AT 1,800 PSI) 13:45 14: TRIPPING START TRIPPING IN WITH BHA 14: 15: GENERAL OPERATIONS STOP ON JT 100, LOAD TUBING WITH FRESH WATER TREATED WITH BIOCIDE. PUMP BBLS. 15:00 18: TRIPPING CONTINUE TRIPPING IN WITH BHA, JT 537 (16644) 18:00 18: RIG UP/DOWN PU POWER SWIVEL AND TIE BACK FAST LINE. 18:45 19: SAFETY MEETING TALKED ABOUT TODAY'S ACTIVITIES, GOOD HOUSE KEEPING, PINCH POINTS AND PROPER PPE 19:00 01: CLEAN OUT WASH WITH SWIVEL FROM JT 537 (16644) TO JT 551 (17079), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 2800 PSI; RETURNS LIGHT CEMENT; CHEMS PIPE ON PIPE.25 /10, PUMP 10 BBL.25/10 SLUG OF BECCA LUBE EVERY 4 JTS TO HELP WITH FRICTION. 01:00 02: CLEAN OUT TO SURFACE FOLLOWED BY 5 BBL SLUG OF BECCA LUBE 02:00 05: CLEAN OUT WASH WITH SWIVEL JT 551 (17079) TO JT 556 (17254), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS TRACE OF CEMENT; CHEMS PIPE ON PIPE.25 /10, PUMP 10 BBL SLUG OF BECCA LUBE EVERY 4 JTS. NPT Problem OTHER SubTyp OTHER Description TRICAN BPS FAILED TO OPEN 4/8/16 Failed Item Accountable Party TRICAN WELL SERVICE Time Inspected By Description 05:01 SAFETY MEETING JASON COLLINSWORTH / DAN CURTIS PJSM 17:00 SAFETY MEETING JUSTIN STRINGER/ WES WILSON PJSM Workover Rig Contractor C & J Bit Information Size (in) 4 5/8 Rig Number 778 Make Model Length (ft) 0. Bit MILL Serial Number NN Rig SERVICE 532,067 Dur Depth In (ft Depth Out Drillout Parameters te Drilling Time (hr) Start Depth (ftkb) End Depth (ftkb) SPP (psi) P Surf Annulus (psi) WOB (1000lbf) RPM (rpm) Drilling Torque PU Str Wt (1000lbf) SO Str Wt (1000lbf) Current BHA Components BHA Item Description 1 DRILL PIPE Perforation Intervals Make Model OD (in) 2 7/8 Joints Length (ft) Top Thread Fishing Neck OD (in) FN Len (ft) , Time Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com

4 AMERICAN ENERGY - PERMIAN BASIN, LLC AEPB WELL NO /13/16 Number of s (ft) Primary Job - ORIGINAL 57 Ground Elevation (ft) RKB (ft) Secondary Job 10,000 4/8/16 34,469 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, AEPB; COMP SUPER, WES WILSON, NEW TECH; COMP SUP, DAN CURTIS, NEW TECH 0 NPT, 0 EHS ISSUES; CONTINUE WASHING TO BOTTOM, FROM JT 557 (17266) TAG I-SEAT WITH JT 572 (17757), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS CEMENT, PUMP 10/10/10 80 VIS SWEEP; MIRU OTEX PUMP TRUCK, PRESSURE TEST LINES TO 4500 PSI, PUMP 500 GAL OF 15% HCL AND DISPLACE WITH 95 BBL OF WATER, SPOTTED AT 17757', RDMO OTEX PUMP TRUCK; TOH WITH SWIVEL 3 JTS PULLED OFF 85 KLBS BOTTOM, LD SWIVEL; TOH LAYING DOWN 40 JTS AND STANDING BACK IN DERRICK 578,377 DRILL OUT CEMENT Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd Typ NPT 05:00 07: CLEAN OUT WASH WITH SWIVEL FROM JT 557 (17266), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS TRACE OF CEMENT; CHEMS PIPE ON PIPE.25 /10, PUMP 10 BBL SLUG OF BECCA LUBE EVERY 4 JTS. 07:00 07: SAFETY MEETING DISCUSSED TODAY'S ACTIVITIES, PINCHPOINTS, TRIP HAZARDS, EMERGENCY PROCEDURES, RANCH RULES, SPEED LIMIT, HOUSE KEEPING. 07:15 12: CLEAN OUT CONTINUE WASHING TO BOTTOM. ON JT 559 (17328' ), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS TRACE OF CEMENT; PUMP 10 BBL SLUG OF BECCA LUBE EVERY 4 JTS. 12:00 13: GENERAL OPERATIONS SENT 5 BBL 100 VISC GEL SWEEP. CEMENT SHAVINGS IN RETURNS. RATE 4.5 BPM, CIRC PRESSURE 3500 PSI. DIFFERENTIAL ON BIT WAS PSI. 45' PER HOUR. 13: 14: INACTIVE SHUT DOWN FOR WEATHER AND LIGHTNING. 14: 16: CLEAN OUT CONTINUE WASHING TO BOTTOM. ON JT 563 (17452' ), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS TRACE OF CEMENT; PUMP.75/10 BECCA LUBE 16: 18: CLEAN OUT CONTINUE WASHING TO BOTTOM. ON JT 568 (17606' ), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS CEMENT. CHEMICALS,.75/10 BECCA LUBE 18:45 19: SAFETY MEETING TALKED ABOUT TODAY'S ACTIVITIES, WORKING IN WET CONDITIONS, SLIPS, TRIPS AND FALLS. 19:00 19: CLEAN OUT CONTINUE WASHING TO BOTTOM TAG ISEAT WITH JT 572 (17757), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS CEMENT. CHEMICALS, PUMP 10/10/10 80 VIS SWEEP. 19:15 : CLEAN OUT CIRCULATE 10/10/10 80 VIS SWEEP TO SURFACE, 150 BBL SPACER 10 BBL SLUG OF BECCA LUBE. :45 23: RIG UP/DOWN MIRU OTEX PUMP TRUCK, PRESSURE TEST LINES TO 4500 PSI, PUMP 500 GAL OF 15% HCL AND DISPLACE WITH 95 BBL OF WATER, SPOTTED AT 17757', RDMO OTEX PUMP TRUCK. 23:15 23: TRIPPING TOH WITH SWIVEL 3 JTS PULLED OFF 85 KLBS BOTTOM, LD SWIVEL 23:45 05: TRIPPING TOH LAYING DOWN 40 JTS AND STANDING BACK IN DERRICK NPT Problem OTHER SubTyp OTHER Description TRICAN BPS FAILED TO OPEN 4/8/16 Failed Item Accountable Party TRICAN WELL SERVICE Time Inspected By Description 07:00 SAFETY MEETING DAN CURTIS PJSM 19:00 SAFETY MEETING WES WILSON PJSM Workover Rig Contractor C & J Bit Information Size (in) 4 5/8 Rig Number 778 Make Model Length (ft) 0. Bit MILL Serial Number NN Rig SERVICE Dur Depth In (ft Depth Out Drillout Parameters te Drilling Time (hr) Start Depth (ftkb) End Depth (ftkb) SPP (psi) P Surf Annulus (psi) WOB (1000lbf) RPM (rpm) Drilling Torque PU Str Wt (1000lbf) SO Str Wt (1000lbf) Current BHA Components BHA Item Description 1 DRILL PIPE Perforation Intervals Make Model OD (in) 2 7/8 Joints Length (ft) Top Thread Fishing Neck OD (in) FN Len (ft) , Time Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com

5 AMERICAN ENERGY - PERMIAN BASIN, LLC AEPB WELL NO /14/16 Number of s (ft) Primary Job - ORIGINAL 57 Ground Elevation (ft) RKB (ft) Secondary Job 10,000 4/8/16 44,311 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, AEPB; COMP SUPER, WES WILSON, NEW TECH; COMP SUP, DAN CURTIS, NEW TECH 0 NPT, 0 EHS ISSUES; FINISHED OUT OF WITH TOP NOTCH BHA. RIG UP O-TEX PUMPS AND IRON. TEST IRON TO 9000 PSI, GOOD TEST. START RATE AT 3 BPM, IT TOOK 24 BBLS TO CATCH PRESSURE. CONTINUED WALKING PRESSURE UP TO 9000 PSI, HELD FOR 5 MIN. BLED WELL TO 0 PSI THROUGH CHOKE MANIFOLD. ATTEMPT SAME, PRESSURED OUT AGAIN WITH NO LEAK OFF. ATTEMPT 3RD TIME WITH SAME RESULT. RIG DOWN O-TEX AND BEGIN TO MAKE UP TCP GUNS;TIH TO 17,733 TO BOTTOM PERF. TIE IN TO BACK SIDE BROUGHT PRESSURE UP TO 3700 PSI SAW FIRST SHOT FIRE AND PRESSURE DROPPED TO 00 PSI SAW ALL SHOTS FIRE, PERFS 17,627, 17,653, 17,680, 17,707, 17,733, BLED WELL DOWN TO 0 PSI; POOH LAYING DOWN SINGLES, PREPARING TO LAY DOWN GUNS AT REPOT TIME. STRING FLOAT ' GUNS ' SUBS 4 3- X OVERS ' RAN 3 JOINTS ( 10000' ) 2 7/8 PH06 PIPE DRILL COLLAR.25 DRILL COLLAR DRILL COLLAR DRILL COLLAR.23 DRILL COLLAR ' PERFORATE WITH TCP Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd Typ NPT 05:00 05: TRIPPING CONTINUE TOH STANDING BACK 266 STANDS 05:45 07: TRIPPING LD TOP NOTCH BHA. 07:00 07: SAFETY MEETING DISCUSSED TODAY'S ACTIVITIES. PRESSURE TESTING, PUMPING, PPE, EMERGENCY PROCEDURES, PINCHPOINTS, TRIP HAZARDS, SPEED LIMITS, HOUSE KEEPING. 07:15 07: PUMP TEST PRESSURE SURFACE CASING TO 500 PSI. SHUT IN SURFACE CASING. PRESSURE TEST O-TEX LINES TO 9000 PSI, AND CHART ALL EVENTS. GOOD TEST. 07:45 10: GENERAL OPERATIONS PRESSURE UP ON 5 1/2 CASING TO OPEN BPS. PRESSURE TO 9000 PSI, HOLD FOR 5 MIN, NO LEAK OFF. 2ND ATTEMPT WITH SAME RESULT. ATTEMPT 3RD TIME TO 9000 PSI AND HOLD FOR 5 MIN. NO LEAK OFF. 10:15 11: RIG UP/DOWN RIG DOWN O-TEX AND RELATED EQUIPMENT 11:45 13: RIG UP/DOWN RIG UP NINE AND INSTALL TCP GUNS TO PERF STAGE 2. FROM 17,627, 17,653, 17,680, 17,707, 17,733 13:45 15: TRIPPING START IN WITH TCP GUNS: STRING FLOAT ' GUNS " SUBS 4 3- X OVERS ' DRILL COLLAR.25 DRILL COLLAR DRILL COLLAR DRILL COLLAR.23 DRILL COLLAR ' 626,517 15:15 15: TRIPPING INSTALL 5 DRILL COLLARS ON JOINT 3 15:45 18: TRIPPING TIH TO 17,733 TO BOTTOM PERF. 18:00 18: PERFORATING TIE IN TO BACK SIDE BROUGHT PRESSURE UP TO 3700 PSI SAW FIRT SHOT FIRE AND PRESSURE DROPED TO 00 PSI SAW ALL SHOTS FIRE, PERFS 17,627, 17,653, 17,680, 17,707, 17,733, BLED WELL DOWN TO 0 PSI. 18: 18: SAFETY MEETING TALKED ABOUT TODAY'S ACTIVITIES, PRESSURE ON LINES, WELL CONTROL AND PINCH POINTS. 18:45 05: TRIPPING POOH LAYINNG DOWN SINGLES. NPT Problem OTHER SubTyp OTHER Description TRICAN BPS FAILED TO OPEN 4/8/16 Failed Item Accountable Party TRICAN WELL SERVICE Time Inspected By Description 07:00 SAFETY MEETING DAN CURTIS PJSM 19:00 SAFETY MEETING WES WILSON PJSM Workover Rig Contractor C & J Perforation Intervals Rig Number 778 Rig SERVICE Time Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 19:00 <zonename>, 17, , /8 19:00 <zonename>, 17, , /8 19:00 <zonename>, 17, , /8 19:00 <zonename>, 17, , /8 19:00 <zonename>, 17, , /8 Dur

6 AMERICAN ENERGY - PERMIAN BASIN, LLC AEPB WELL NO /15/16 Number of s (ft) Primary Job - ORIGINAL 57 Ground Elevation (ft) RKB (ft) Secondary Job 10,000 4/8/16 32,482 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, AEPB; COMP SUPER, WES WILSON, NEW TECH; COMP SUP, DAN CURTIS, NEW TECH 0 NPT, 0 EHS ISSUES. LAYOUT GUNS. PERFORM INJECTION TEST. PUMPED IN BPM 40 PSI. ISIP, 5 MIN 00, 10 MIN 29, 15 MIN FG RIG DOWN ALL SERVICE COMPANIES, SECURE WELL, ALL VALVES CLOSED, REMOVE FLOWCROSS, INSTALL NIGHT CAP, TORQUE FLANGE TO SPECS. CLEAN LOCATION. WELL READY FOR FRAC. WELL READY FOR FRAC Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd Typ NPT 05:00 06: RIG UP/DOWN LADY DOWN TCP GUNS ALL SHOT FIRED 06:00 07: GENERAL OPERATIONS PREFORM INJECTION TEST. PUMPED 4 BBLS IN AT PSI. ISIP, 5 MIN 00, 10 MIN 29, 15 MIN 2800 FG :00 07: SAFETY MEETING DISCUSSED TODAY'S ACTIVITIES, PINCHPOINTS, TRIP HAZARDS, RIG DOWN, LAND GUIDES FOR BACKING, FORKLIFT SAFETY, MANLIFT SAFETY. PPE, HOUSE KEEPING. 07:15 12: RIG UP/DOWN RIG DOWN MOVE OFF ALL SERVICE COMPAINES. WELL SHUT IN AND SECURE SICP AT REPORT TIME. WELL READY FOR FRAC. 12:00 05: INACTIVE WELL SHUT IN. WAITING ON FRAC NPT Typ SubTyp Des Failed Item Accountable Party Dur (hr) OTHER OTHER TRICAN BPS FAILED TO OPEN 4/8/16 16:15 4/14/16 12:00 TRICAN WELL SERVICE Workover Rig Contractor C & J Time Inspected By Description Rig Number 778 Bit Information Size (in) Make Model Length (ft) Bit Serial Number Depth In (ft Depth Out Rig SERVICE Drillout Parameters te Drilling Time (hr) Start Depth (ftkb) End Depth (ftkb) SPP (psi) P Surf Annulus (psi) WOB (1000lbf) RPM (rpm) Drilling Torque PU Str Wt (1000lbf) SO Str Wt (1000lbf) Perforation Intervals Time Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 658,999

7 5/8/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 14,0 4/8/16 711,786 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 0 NPT, 0 EHS ISSUES; MOVE IN RIG UP AND TEST FRAC STACKS AND FLOWBACK SPOTTED FRAC AND FLOWBACK TANKS; SET UP FRAC OFFICE AND SUNBELT RENTAL EQUIPMENT. WAITING ON FRAC CREW Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 05: RIG UP/DOWN MOVE IN RIG UP AND TEST FRAC STACKS AND FLOWBACK SPOTTED FRAC AND FLOWBACK TANKS; SET UP FRAC OFFICE AND SUNBELT RENTAL EQUIPMENT. Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER PJSM 17:00 SAFETY MEETING CLAYTON BRUNTZ/JANSON COLLINSWEORTH PJSM Workover Rig Contractor Rig # Rig RR Date C & J 778 SERVICE 4/8/16 5/14/16 Stimulations Summary Proppant Total (lb)

8 5/9/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 8,913 4/8/16 7,533 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 0 NPT, 0 EHS ISSUES; WAITING ON FRAC CREW WAITING ON FRAC CREW Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 05: INACTIVE WAITING FOR FRAC CREW Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER SITE HANDOVER 17:00 SAFETY MEETING CLAYTON BRUNTZ/JANSON COLLINSWEORTH SITE HANDOVER Workover Rig Contractor Rig # Rig RR Date C & J 778 SERVICE 4/8/16 5/14/16 Stimulations Summary Proppant Total (lb)

9 5/10/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 8,328 4/8/16 7,279 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 0 NPT, 0 EHS ISSUES; SPOT WIRELINE TRUCK AND AUXILLARY EQUIPMENT, FUNCTION TEST BOPS AND TOOL TRAP, SPOT SAND KINGS AND PRE-FILL SAND. WELL SHUT IN AND SECURE WAITING ON FRAC CREW MIRU FRAC EQUIPMENT Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 10: INACTIVE WAITING ON FRAC CREW 10:00 13: RIG UP/DOWN MIRU WIRELINE EQUIPMENT AND AUXILLARY SERVICES 13:00 19: INACTIVE WAITING ON FRAC CREW 19:00 00: RIG UP/DOWN SPOT SAND KINGS AND PRE-FILL SAND 00:00 05: INACTIVE WAITING ON FRAC CREW Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER SITE HANDOVER 17:00 SAFETY MEETING CLAYTON BRUNTZ/JANSON COLLINSWEORTH SITE HANDOVER Workover Rig Contractor Rig # Rig RR Date C & J 778 SERVICE 4/8/16 5/14/16 Stimulations Summary Proppant Total (lb)

10 5/11/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 9,318 4/8/16 740,541 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 0 NPT, 0 EHS ISSUES; MIRU FRAC EQUIPMENT, LOAD ACID AND START PRE FRAC QA/QC START FRAC Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 10: INACTIVE WAITING ON FRAC CREW TO ARRIVE 10:00 05: RIG UP/DOWN MIRU FRAC PUMPS AND START RIGGING UP IRON, MIX ACID, COMPLETE PRE JOB QA/QC Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER PJSM 17:00 SAFETY MEETING CLAYTON BRUNTZ/JANSON COLLINSWEORTH PJSM Stimulations Summary Proppant Total (lb)

11 5/12/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 192,075 4/8/16 932,616 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 7.25 NPT, 0 EHS ISSUES FRAC STAGE 2-5 OF 55, PLUG AND PERFORATE STAGE 3-6 OF 55; 4 STAGES FRAC'D ON THE PAD; 5.75 HRS NPT ON FOR NOT STARTING ON TIME, HAVING TO MOVE THE DENSO. AND FIXING A LEAK; 1.5 HRS NPT ON DYNASTY FOR CHANGING OUT GREASE TUBES; FRAC'ING STAGE 6 OF 55 AT REPORT TIME. FRAC MULTIPLE STAGES Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 09: DOWNTIME WAITING ON TO FINISH RIGGING UP IRON, RESTRAINTS AND SPOT DATA VAN AND RIG UP ALL THE CABLES, ALSO WAITING ON TO RETREIVE PRELOAD SAND TICKETS FROM NIGHT SHIFT SUPERVISOR THAT TOOK THEM TO THEIR MANCAMP IN BARNHART TO CONFIRM SAND AMOUNT AND BIN ALLOCATION PRIOR TO STARTING STAGE 1 OF 44 09: 12: FRAC. JOB FRAC STAGE 2 OF 55 12:15 15: PERFORATING PLUG AND PERF STAGE 3 OF 55; LOGGING POOH 15:15 17: FRAC. JOB FRAC STAGE 3 OF 55 17:15 19: PERFORATING PLUG AND PERF STAGE 4 OF 55 19:00 : DOWNTIME MOVING INLINE DENSO. AND FIXING LEAK :15 22: FRAC. JOB FRAC STAGE 4 OF 55 22:15 00: PERFORATING PLUG AND PERF STAGE 5 OF 55 00:15 02: FRAC. JOB FRAC STAGE 5 OF 55 02:00 03: DOWNTIME WIRELINE PRESSURE CONTROL WON'T HOLD GREASE SEAL, CHANGE OUT FLOW TUBES. 03: 04: PERFORATING PLUG AND PERF STAGE 6 OF 55 04:45 05: FRAC. JOB FRAC STAGE 6 OF 55 NPT Subtype Des Failed Item Accountable Party SURFACE EQUIPMENT FRAC FINISH RIGGING UP IRON AND RESTRAINTS, 5/11/16 05:00 5/11/16 09: FRACTURING INITIAL QA/QC TECHNOLOGIES SURFACE EQUIPMENT SURFACE EQUIPMENT FRAC AUXILIARY EQUP PRESSURE CONTROL MOVING DENSO AND FIXING LEAK 5/11/16 19:00 5/11/16 :15 FRACTURING TECHNOLOGIES CHANGE OUT FLOW TUBES 5/12/16 02:00 5/12/16 03: DYNASTY WIRELINE SERVICES 1.50 Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER PJSM 17:00 SAFETY MEETING CLAYTON BRUNTZ/JANSON COLLINSWEORTH PJSM Plug Details Des Top (ftkb) Btm (ftkb) OD (in) ID (in) Run Date Pull Date Com FRAC PLUG 17, , / /11/16 STAGE 3 PLUG ( BPM) FRAC PLUG 17, , / /11/16 STAGE 4 PLUG (6 BPM) FRAC PLUG 17, , / /11/16 STAGE 5 PLUG (6 BPM) FRAC PLUG 17, , / /12/16 STAGE 6 PLUG (610 BPM) Perforation Intervals Time Linked Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 04:15 17, , /8 STAGE 6 04:15 17, , /8 STAGE 6 04:15 17, , /8 STAGE 6 04:15 17, , /8 STAGE 6 04:15 17, , /8 STAGE 6 23: 17, , /8 STAGE 5 23: 17, , /8 STAGE 5 23: 17, , /8 STAGE 5 23: 17, , /8 STAGE 5 23: 17,0.0 17, /8 STAGE 5 18:00 17, , /8 STAGE 4 18:00 17, , /8 STAGE 4 18:00 17, , /8 STAGE 4 18:00 17,4.0 17, /8 STAGE 4 18:00 17, , /8 STAGE 4 13:45 17, , /8 STAGE 3 13:45 17,5.0 17, /8 STAGE 3 13:45 17, , /8 STAGE 3 13:45 17, , /8 STAGE 3 13:45 17, , /8 STAGE 3 Stimulations Summary HYDRAULIC FRAC Stimulation Details STAGE 2 - on 5/11/16 5/11/16 1, ,3.0 8,101.0, P Post SI ( 5 min SI (psi) , /11/16 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 7,989.0, Treat Rate Max (gpm) Treat Rate Avg (gpm) 9, Proppant Total (lb) 0.0 Dur (Net) (hr) Proppant D Prop Place , ,905 Add Add Subtype Add Purpose Design Amount Amount Units Com Friction Reducer WFR-54LA 60.0 GAL/T Surfactant ROCK ON 33.0 GAL/T Surfactant.0 GAL/T Friction Reducer WFR-54LA GAL/T Surfactant GAL/T Surfactant ROCK ON GAL/T Tracer OST KG Acid 7 1/2% HCL 7 1/2% HCL 2,000.0 GAL Acid Inhibitor/retarder INHIBITOR WAI-251LC 6.0 GAL

12 5/12/16 Add Add Subtype Add Purpose Design Amount Amount Units Com Friction Reducer WFR-54LA 14.4 GAL/T Surfactant.0 GAL/T Surfactant ROCK ON 40.0 GAL/T Friction Reducer WFR-54LA GAL/T Surfactant 50.0 GAL/T Surfactant ROCK ON GAL/T STAGE 3 - on 5/11/16 5/11/16 2, , ,108.0, P Post SI ( 5 min SI (psi) 35 7, min SI (psi) 15 min SI (psi) P Breakdown (psi) 5,900.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 6, Proppant D Prop Place , ,049 Add Add Subtype Add Purpose Design Amount Amount Units Com Friction Reducer WFR-54LA 46.0 GAL/T Surfactant 45.0 GAL/T Surfactant ROCK ON 86.0 GAL/T Friction Reducer WFR-54LA GAL/T Surfactant ROCK ON 3.0 GAL/T Surfactant 15.0 GAL/T Tracer OST KG Acid 7 1/2% HCL 7 1/2% HCL 2,000.0 GAL Acid Inhibitor/retarder INHIBITOR WAI-251LC 6.0 GAL Friction Reducer WFR-54LA 16.0 GAL/T Surfactant ROCK ON 26.0 GAL/T Surfactant 15.0 GAL/T Friction Reducer WFR-54LA 44.0 GAL/T Surfactant 43.0 GAL/T Surfactant ROCK ON 82.0 GAL/T STAGE 4 - on 5/11/16 5/11/16 2, , ,177.0, P Post SI ( 5 min SI (psi) , min SI (psi) 15 min SI (psi) P Breakdown (psi) 5, Treat Rate Max (gpm) Treat Rate Avg (gpm) 7, Proppant D Prop Place , ,332 Add Add Subtype Add Purpose Design Amount Amount Units Com Friction Reducer WFR-54LA 53.0 GAL/T Surfactant 40.0 GAL/T Surfactant ROCK ON 90.0 GAL/T Friction Reducer WFR-54LA GAL/T Surfactant ROCK ON GAL/T Surfactant 3.0 GAL/T Tracer OST KG Acid 7 1/2% HCL 7 1/2% HCL 2,000.0 GAL Acid Inhibitor/retarder INHIBITOR WAI-251LC 6.0 GAL Friction Reducer WFR-54LA 22.0 GAL/T Surfactant 9.0 GAL/T Surfactant ROCK ON 28.0 GAL/T Friction Reducer WFR-54LA.0 GAL/T Surfactant ROCK ON 44.0 GAL/T Surfactant STAGE 5 - on 5/12/16 5/12/16 2, , ,903.0, P Post SI ( 5 min SI (psi) , min SI (psi) 15 min SI (psi) P Breakdown (psi) 5, GAL/T Treat Rate Max (gpm) Treat Rate Avg (gpm) 6, Proppant D Prop Place , ,227 Add Add Subtype Add Purpose Design Amount Amount Units Com Friction Reducer WFR-54LA 40.0 GAL/T Surfactant ROCK ON 89.0 GAL/T Surfactant 51.0 GAL/T Friction Reducer WFR-54LA GAL/T Gels Friction Reducers WGA-15L KG Surfactant GAL/T Surfactant ROCK ON GAL/T Tracer OST KG Acid 7 1/2% HCL 7 1/2% HCL 2,000.0 GAL Acid Inhibitor/retarder INHIBITOR WAI-251LC 6.0 GAL Friction Reducer WFR-54LA 10.0 GAL/T Surfactant ROCK ON 31.0 GAL/T Surfactant 19.0 GAL/T Friction Reducer WFR-54LA 26.0 GAL/T Surfactant ROCK ON 45.0 GAL/T Surfactant 29.0 GAL/T

13 5/13/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 258,550 4/8/16 1,185,592 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 1.5 HRS NPT, 0 EHS ISSUES FRAC STAGE 6-11 OF 55, PLUG AND PERFORATE STAGE 7-12 OF 55; 6 STAGES FRAC'D ON THE PAD; NPT TO PURELINE FOR REPAIRS AND DYNASTY WIRELINE TO SWAP O-RINGS IN LUBRICATOR. FRAC'ING STAGE 12 OF 55 AT REPORT TIME. FRAC MULTIPLE STAGES Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 07: FRAC. JOB FRAC STAGE 6 OF 55 07:15 09: PERFORATING PLUG AND PERF STAGE 7 OF 55 09:00 11: FRAC. JOB FRAC STAGE 7 OF 55 11:15 12: PERFORATING PLUG AND PERF STAGE 8 OF 55 12: 13: GENERAL OPERATIONS GREASE FRAC STACK 13:15 15: FRAC. JOB FRAC STAGE 8 OF 55 15: 17: PERFORATING PLUG AND PERF STAGE 9 OF 55 17:00 18: FRAC. JOB FRAC STAGE 9 OF 55 18:45 : PERFORATING PLUG AND PERF STAGE 10 OF 55 : 21: FRAC. JOB FRAC STAGE 10 OF 55 21: 22: DOWNTIME PURELINE EQUIPMENT FAILURE, FLUSHED WELL AND SHUTDOWN FOR REPAIRS 22:00 23: FRAC. JOB FRAC STAGE 10 OF 55 23:00 00: DOWNTIME LUBRICATOR LEAK, SWAPPED OUT O-RING 00:00 01: PERFORATING PLUG AND PERF STAGE 11 OF 55 01:15 03: FRAC. JOB FRAC STAGE 11 OF 55 03:00 04: PERFORATING PLUG AND PERF STAGE 12 OF 55 04: 05: FRAC. JOB FRAC STAGE 12 OF 55 NPT Subtype Des Failed Item Accountable Party MATERIALS CHEMICALS PURELINE EQUIPMENT FAILURE 5/12/16 21: 5/12/16 22:00 PURELINE TREATMENT SYSTEMS, LLC SURFACE EQUIPMENT WIRELINE LUBRICATOR LEAK DURING PRESSURE TEST, SWAPPED OUT O-RING Dur (Net) (hr) /12/16 23:00 5/13/16 00:00 DYNASTY WIRELINE SERVICES 1.00 Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER PJSM 17:00 SAFETY MEETING CLAYTON BRUNTZ/JANSON COLLINSWEORTH PJSM Plug Details Des Top (ftkb) Btm (ftkb) OD (in) ID (in) Run Date Pull Date Com FRAC PLUG 17, , / /12/16 STAGE 7 PLUG (610 BPM) FRAC PLUG 16, , / /12/16 STAGE 8 PLUG (595 BPM) FRAC PLUG 16, , / /12/16 STAGE 9 PLUG (610 BPM) FRAC PLUG 16, , / /12/16 STAGE 10 PLUG (610 BPM) FRAC PLUG 16, , / /13/16 STAGE 11 PLUG (6 BPM) FRAC PLUG 16, , / /13/16 STAGE 12 PLUG (660 BPM) Perforation Intervals Time Linked Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 03:45 15, , /8 STAGE 12 03:45 15, , /8 STAGE 12 03:45 15, , /8 STAGE 12 03:45 15, , /8 STAGE 12 03:45 15, , /8 STAGE 12 00:45 16, , /8 STAGE 11 00:45 16, , /8 STAGE 11 00:45 16, , /8 STAGE 11 00:45 16, , /8 STAGE 11 00:45 16, , /8 STAGE 11 19:15 16, , /8 STAGE 10 19:15 16, , /8 STAGE 10 19:15 16,4.0 16, /8 STAGE 10 19:15 16, , /8 STAGE 10 19:15 16, , /8 STAGE 10 16:15 16,4.0 16, /8 STAGE 9 16:15 16, , /8 STAGE 9 16:15 16, , /8 STAGE 9 16:15 16, , /8 STAGE 9 16:15 16, , /8 STAGE 9 12:15 16, , /8 STAGE 8 12:15 16, , /8 STAGE 8 12:15 16, , /8 STAGE 8 12:15 16, , /8 STAGE 8 12:15 16, , /8 STAGE 8 08:00 16, , /8 STAGE 7 08:00 16, , /8 STAGE 7 08:00 16, , /8 STAGE 7 08:00 16, , /8 STAGE 7 08:00 16, , /8 STAGE 7 Stimulations Summary HYDRAULIC FRAC 5/11/16 75, Proppant Total (lb) 0.0

14 5/13/16 Stimulation Details STAGE 6 - on 5/12/16 5/12/16 2, , , , P Post SI ( 5 min SI (psi) , min SI (psi) 15 min SI (psi) P Breakdown (psi) 6, Treat Rate Max (gpm) Treat Rate Avg (gpm) 7, FRAC STAGE 6 OF 55 OST 4110 CUT STAGE 110,000 LBS 40/70 SHORT TO AVOID SCREENOUT, COULD NOT RUN GEL DUE TO NOT HAVING ANY BREAKER ON LOCATION FOR THE GEL Proppant D Prop Place , ,937 7, Add Add Subtype Add Purpose Design Amount Amount Units Com Acid 7 1/2% HCL 7 1/2% HCL 2,000.0 GAL Friction Reducer WFR-54LA GAL/T Surfactant ROCK ON GAL/T Surfactant ASCEND ADDITIVE GAL/T Tracer OST KG STAGE 7 - on 5/12/16 5/12/16 2, , ,7.0 75, P Post SI ( 5 min SI (psi) , min SI (psi) 15 min SI (psi) P Breakdown (psi) 4, Treat Rate Max (gpm) Treat Rate Avg (gpm) 7, FRAC STAGE 7 OF 55 OST 4110 CUT STAGE 9,152 LBS 40/70 SHORT TO AVOID SCREENOUT, COULD NOT RUN GEL DUE TO NOT HAVING ANY BREAKER ON LOCATION FOR THE GEL Proppant D Prop Place ,000 3,848 7, Add Add Subtype Add Purpose Design Amount Amount Units Com Friction Reducer WFR-54LA GAL/T Surfactant ASCEND ADDITIVE GAL/T Surfactant ROCK ON GAL/T Tracer OST KG STAGE 8 - on 5/12/16 5/12/16 2, , , , P Post SI ( 5 min SI (psi) , min SI (psi) 15 min SI (psi) P Breakdown (psi) 4, Treat Rate Max (gpm) Treat Rate Avg (gpm) 8, FRAC STAGE 8 OF 55 OST 4110 Proppant D Prop Place 83 6,738 3, ,225 9, Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers INSTANT WBK-133 INSTANT BREAKER.0 Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM 65.0 Gels Friction Reducers WGA-15L Friction Reducer WFR-54LA GAL/T Surfactant ASCEND ADDITIVE GAL/T Surfactant ROCK ON GAL/T Tracer OST KG STAGE 9 - on 5/12/16 5/12/16 2, , , , P Post SI ( 5 min SI (psi) , min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,472.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 6, FRAC STAGE 9 OF 55 OST 4110 Proppant D Prop Place , ,856 7,0 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM 40.0 Breakers INSTANT WBK-133 INSTANT BREAKER 10.0 Gels Friction Reducers WGA-15L Friction Reducer WFR-54LA GAL/T Surfactant ROCK ON GAL/T Surfactant ASCEND ADDITIVE GAL/T Tracer OST KG STAGE 10 - on 5/12/16 5/12/16 2, , , , P Post SI ( 5 min SI (psi) , min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,281.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 7, FRAC STAGE 10 OF 55 OST 4110 Proppant D Prop Place , ,8 7,897.00

15 5/13/16 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM.0 Breakers INSTANT WBK-133 INSTANT BREAKER 10.0 Gels Friction Reducers WGA-15L Friction Reducer WFR-54LA GAL/T Surfactant ASCEND ADDITIVE GAL/T Surfactant ROCK ON GAL/T Tracer OST KG STAGE 11 - on 5/13/16 5/13/16 2, , , , P Post SI ( 5 min SI (psi) , min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,123.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 6, FRAC STAGE 11 OF 55 OST 4110 Proppant D Prop Place , ,109 6, Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM.0 Breakers INSTANT WBK-133 INSTANT BREAKER 10.0 Gels Friction Reducers WGA-15L Friction Reducer WFR-54LA GAL/T Surfactant ROCK ON GAL/T Surfactant ASCEND ADDITIVE 3.0 GAL/T Tracer OST KG

16 5/14/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 336,829 4/8/16 1,522,4 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 0 HRS NPT, 0 EHS ISSUES FRAC STAGE OF 55, PLUG AND PERFORATE STAGE OF 55; 8 STAGES FRAC'D ON THE PAD; PERF STAGE AT TOR FRAC MULTIPLE STAGES Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 06: FRAC. JOB FRAC STAGE 12 OF 55 06:15 07: PERFORATING PLUG AND PERF STAGE 13 OF 55 07:45 09: FRAC. JOB FRAC STAGE 13 OF 55 09: 11: PERFORATING PLUG AND PERF STAGE 14 OF 55 11:00 12: GENERAL OPERATIONS GREASE FRAC STACK 12:00 13: FRAC. JOB FRAC STAGE 14 OF 55 13:15 15: PERFORATING PLUG AND PERF STAGE 15 OF 55 15:00 16: FRAC. JOB FRAC STAGE 15 OF 55 16: 17: PERFORATING PLUG AND PERF STAGE 16 OF 55 17:45 19: FRAC. JOB FRAC STAGE 16 OF 55 19: : PERFORATING PLUG AND PERF STAGE 17 OF 55 :45 22: FRAC. JOB FRAC STAGE 17 OF 55 22: 23: PERFORATING PLUG AND PERF STAGE 18 OF 55 23:45 01: FRAC. JOB FRAC STAGE 18 OF 55 01: 02: PERFORATING PLUG AND PERF STAGE 19 OF 55 02: 04: FRAC. JOB FRAC STAGE 19 OF 55 04:00 05: PERFORATING PLUG AND PERF STAGE OF 55 Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER PJSM 17:00 SAFETY MEETING CLAYTON BRUNTZ/JASON COLLINSWORTH PJSM Plug Details Des Top (ftkb) Btm (ftkb) OD (in) ID (in) Run Date Pull Date Com FRAC PLUG 15, , / /13/16 STAGE 13 PLUG (6 BPM) FRAC PLUG 15, , / /13/16 STAGE 14 PLUG (6 BPM) FRAC PLUG 15, , / /13/16 STAGE 15 PLUG (6 BPM) FRAC PLUG 15, , / /13/16 STAGE 16 PLUG (640 BPM) FRAC PLUG 15, , / /13/16 STAGE 17 PLUG (6 BPM) FRAC PLUG 14, , / /13/16 STAGE 18 PLUG (640 BPM) FRAC PLUG 14, , / /14/16 STAGE 19 PLUG (640 BPM) Perforation Intervals Time Linked Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 02:00 14, , /8 STAGE 19 02:00 14, , /8 STAGE 19 02:00 14, , /8 STAGE 19 02:00 14, , /8 STAGE 19 02:00 14, , /8 STAGE 19 23:00 14, , /8 STAGE 18 23:00 14, , /8 STAGE 18 23:00 14, , /8 STAGE 18 23:00 14, , /8 STAGE 18 23:00 14, , /8 STAGE 18 :00 14, , /8 STAGE 17 :00 14, , /8 STAGE 17 :00 14, , /8 STAGE 17 :00 14, , /8 STAGE 17 :00 15, , /8 STAGE 17 17:15 15, , /8 STAGE 16 17:15 15, , /8 STAGE 16 17:15 15, , /8 STAGE 16 17:15 15, , /8 STAGE 16 17:15 15, , /8 STAGE 16 14:15 15,2.0 15, /8 STAGE 15 14:15 15, , /8 STAGE 15 14:15 15,6.0 15, /8 STAGE 15 14:15 15, , /8 STAGE 15 14:15 15, , /8 STAGE 15 10: 15, , /8 STAGE 14 10: 15, , /8 STAGE 14 10: 15, , /8 STAGE 14 10: 15, , /8 STAGE 14 10: 15, , /8 STAGE 14 07:00 15, , /8 STAGE 13 07:00 15, , /8 STAGE 13 07:00 15, , /8 STAGE 13 07:00 15, , /8 STAGE 13 07:00 15, , /8 STAGE 13 Stimulations Summary HYDRAULIC FRAC Stimulation Details STAGE 12 - on 5/13/16 5/13/16 2, , , , P Post SI ( 5 min SI (psi) 10 5, /11/16 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 4, , Treat Rate Max (gpm) Treat Rate Avg (gpm) 6, FRAC STAGE 12 OF 55 OST 4110 Proppant Total (lb) 0.0 Proppant D Prop Place , ,314 6, Add Add Subtype Add Purpose Design Amount Amount Units Com

17 5/14/16 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM 34.0 LBS Breakers INSTANT WBK-133 INSTANT BREAKER.0 LBS Gels Friction Reducers WGA-15L GAL Friction Reducer WFR-54LA GAL Surfactant ROCK ON GAL Surfactant ASCEND ADDITIVE GAL Tracer OST KG STAGE 13 - on 5/13/16 5/13/16 2, , , , P Post SI ( 5 min SI (psi) , min SI (psi) 15 min SI (psi) P Breakdown (psi) 4, Treat Rate Max (gpm) Treat Rate Avg (gpm) 5, FRAC STAGE 13 OF 55 OST 4110 Proppant D Prop Place , ,780 6, Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers INSTANT WBK-133 INSTANT BREAKER.0 LBS Gels Friction Reducers WGA-15L 8.0 GAL Friction Reducer WFR-54LA GAL Surfactant ASCEND ADDITIVE GAL Surfactant ROCK ON GAL Tracer OST KG STAGE 14 - on 5/13/16 5/13/16 2, , , , P Post SI ( 5 min SI (psi) 6, min SI (psi) 15 min SI (psi) P Breakdown (psi) 4, Treat Rate Max (gpm) Treat Rate Avg (gpm) 5, FRAC STAGE 14 OF 55 OST 3500 Proppant D Prop Place , ,593 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM 18.0 LBS Breakers INSTANT WBK-133 INSTANT BREAKER.0 LBS Gels Friction Reducers WGA-15L GAL Friction Reducer WFR-54LA GAL Surfactant ASCEND ADDITIVE 4.0 GAL Surfactant ROCK ON GAL Tracer OST KG STAGE 15 - on 5/13/16 5/13/16 2, , , , P Post SI ( 5 min SI (psi) 68 6, min SI (psi) 15 min SI (psi) P Breakdown (psi) 4, Treat Rate Max (gpm) Treat Rate Avg (gpm) 7,19 FRAC STAGE 15 OF 55 OST 3500 Proppant D Prop Place , ,814 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers INSTANT WBK-133 INSTANT BREAKER.0 LBS Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM 35.0 LBS Gels Friction Reducers WGA-15L GAL Friction Reducer WFR-54LA GAL Surfactant ROCK ON GAL Surfactant ASCEND ADDITIVE GAL Tracer OST KG STAGE 16 - on 5/13/16 5/13/16 2, , , , P Post SI ( 5 min SI (psi) , min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,429.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 6, FRAC STAGE 16 OF 55 OST 3500 Proppant D Prop Place , ,272 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM.0 LBS Gels Friction Reducers WGA-15L GAL Friction Reducer WFR-54LA GAL Surfactant ROCK ON GAL

18 5/14/16 Add Add Subtype Add Purpose Design Amount Amount Units Com Surfactant ASCEND ADDITIVE 0.0 GAL Tracer OST KG STAGE 17 - on 5/13/16 5/13/16 2, , , , P Post SI ( 5 min SI (psi) , min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,533.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 6,37 FRAC STAGE 17 OF 55 OST 3500 Proppant D Prop Place , ,840 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM.0 LBS Gels Friction Reducers WGA-15L GAL Friction Reducer WFR-54LA GAL Surfactant ASCEND ADDITIVE 2.0 GAL Surfactant ROCK ON GAL Tracer OST KG STAGE 18 - on 5/13/16 5/13/16 2, , , , P Post SI ( 5 min SI (psi) , min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,558.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 5, FRAC STAGE 18 OF 55 OST 3500 Proppant D Prop Place , ,652 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM.0 LBS Gels Friction Reducers WGA-15L GAL Friction Reducer WFR-54LA GAL Surfactant ASCEND ADDITIVE GAL Surfactant ROCK ON GAL Tracer OST KG STAGE 19 - on 5/14/16 5/14/16 2, , , , P Post SI ( 5 min SI (psi) 57 6, min SI (psi) 15 min SI (psi) P Breakdown (psi) 5,196.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 5, FRAC STAGE 19 OF 55 OST 3500 Proppant D Prop Place , ,409 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM.0 LBS Gels Friction Reducers WGA-15L GAL Friction Reducer WFR-54LA GAL Surfactant ASCEND ADDITIVE GAL Surfactant ROCK ON GAL Tracer OST KG

19 5/15/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 298,4 4/8/16 1,848,570 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 2.5 HRS NPT, 0 EHS ISSUES; FRAC STAGES - 26 OF 55, PLUG AND PERFORATE STAGES OF 55; 7 STAGES FRAC'D ON THE PAD; NPT TO TO REPLACE BAD SEAL ON CHECK VALVE AND TO SWAP CHEM TRAILER, NPT TO DYNASTY WIRELINE TO SWAP O-RINGS IN LUBRICATOR. FRAC'ING STAGE 27 AT REPORT TIME. FRAC MULTIPLE STAGES Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 05: PERFORATING PLUG AND PERF STAGE OF 55 05:15 06: GENERAL OPERATIONS GREASE FRAC STACK 06:00 07: FRAC. JOB FRAC STAGE OF 55 07:15 08: PERFORATING PLUG AND PERF STAGE 21 OF 55 08: 09: DOWNTIME WAIT ON TO FIX LEAK ON IRON 09:00 10: FRAC. JOB FRAC STAGE 21 OF 55 10:15 11: FLOWBACK WELL FLOWBACK WELL AFTER SCREENOUT STAGE 21 FRAC, RETURNED BALL TO SURFACE, ESTIMATE,000 LBS 40/70 RETURNED TO SURFACE WITH 390 BBLS OF FLUID 11:00 11: FRAC. JOB FLUSH FRAC STAGE 21 11:15 12: PERFORATING PLUG AND PERF STAGE 22 OF 55 12:45 14: FRAC. JOB FRAC STAGE 22 OF 55 14:00 15: PERFORATING PLUG AND PERF STAGE 23 OF 55 15:15 16: FRAC. JOB FRAC STAGE 23 OF 55 16: 18: PERFORATING PLUG AND PERF STAGE 24 OF 55 18:15 19: FRAC. JOB FRAC STAGE 24 OF 55 19: : PERFORATING PLUG AND PERF STAGE 25 OF 55 : 21: DOWNTIME SWAPPING CHEM. UNITS 21:45 23: FRAC. JOB FRAC STAGE 25 OF 55 (CUT PROPPANT EARLY DUE TO PRESSURE) 23:00 00: PERFORATING PLUG AND PERF STAGE 26 OF 55 00:15 01: GENERAL OPERATIONS GREASE WELLHEAD 01:00 02: FRAC. JOB FRAC STAGE 26 OF 55 02:00 02: DOWNTIME LEAK IN LUBRICATOR, SWAP O-RINGS 02:45 04: PERFORATING PLUG AND PERF STAGE 27 OF 55 04:00 05: FRAC. JOB FRAC STAGE 27 OF 55 NPT Subtype Des Failed Item Accountable Party SURFACE EQUIPMENT FRAC IRON LEAKING SEAL ON CHECK VALVE 5/14/16 08: 5/14/16 09:00 FRACTURING TECHNOLOGIES MATERIALS CHEMICALS SWAPPING CHEM. UNITS 5/14/16 : 5/14/16 21:45 FRACTURING TECHNOLOGIES SURFACE EQUIPMENT WIRELINE LUBRICATOR LEAK DURING PRESSURE TEST, SWAPPED OUT O-RINGS Dur (Net) (hr) /15/16 02:00 5/15/16 02:45 DYNASTY WIRELINE SERVICES 0.75 Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER PJSM 17:00 SAFETY MEETING CLAYTON BRUNTZ/JASON COLLINSWORTH PJSM Plug Details Des Top (ftkb) Btm (ftkb) OD (in) ID (in) Run Date Pull Date Com FRAC PLUG 14, , / /14/16 STAGE PLUG (6 BPM) FRAC PLUG 14,8.0 14, / /14/16 STAGE 21 PLUG (6 BPM) FRAC PLUG 14, , / /14/16 STAGE 22 PLUG (6 BPM) FRAC PLUG 13, , / /14/16 STAGE 23 PLUG (6 BPM) FRAC PLUG 13, , / /14/16 STAGE 24 PLUG (6 BPM) FRAC PLUG 13, , / /14/16 STAGE 25 PLUG (610 BPM) FRAC PLUG 13, , / /14/16 STAGE 26 PLUG (610 BPM) FRAC PLUG 13, , / /15/16 STAGE 27 PLUG (6 BPM) Perforation Intervals Time Linked Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 03:15 13, , /8 STAGE 27 03:15 13, , /8 STAGE 27 03:15 13, , /8 STAGE 27 03:15 13, , /8 STAGE 27 03:15 13, , /8 STAGE 27 23:45 13, , /8 STAGE 26 23:45 13, , /8 STAGE 26 23:45 13,2.0 13, /8 STAGE 26 23:45 13, , /8 STAGE 26 23:45 13, , /8 STAGE 26 :00 13, , /8 STAGE 25 :00 13, , /8 STAGE 25 :00 13, , /8 STAGE 25 :00 13, , /8 STAGE 25 :00 13, , /8 STAGE 25 17: 13, , /8 STAGE 24 17: 13, , /8 STAGE 24 17: 13, , /8 STAGE 24 17: 13, , /8 STAGE 24 17: 13, , /8 STAGE 24 15:00 13, , /8 STAGE 23 15:00 13, , /8 STAGE 23 15:00 13, , /8 STAGE 23 15:00 13, , /8 STAGE 23 15:00 13, , /8 STAGE 23 12:15 13, , /8 STAGE 22 12:15 13, , /8 STAGE 22 12:15 14, , /8 STAGE 22 12:15 14, , /8 STAGE 22 12:15 14, , /8 STAGE 22 07:45 14, , /8 STAGE 21 07:45 14, , /8 STAGE

1, Total Depth (All) (ftkb) Original Hole - 20, ,929, Wind Temperature ( F) Road Condition

1, Total Depth (All) (ftkb) Original Hole - 20, ,929, Wind Temperature ( F) Road Condition NU B-SECTION & FRAC STACK, SET 2 TANKS & FILL W/ 2% KCL AND BIOCIDE. OPEN TOE SLEEVE, PUMP DOWN DART & TEST CSG. 36,788.38 06:00 07:00 1.00 INACTIVE 07:00 07:30 0.50 PJSM 36,788.38 07:30 09:30 2.00 CHECK

More information

2/4/15 SAU 1220DH WOCS: Aaron Auld Rig: WSI wireline/ rigless

2/4/15 SAU 1220DH WOCS: Aaron Auld Rig: WSI wireline/ rigless 2/4/15 SAU 1220DH WOCS: Aaron Auld Rig: WSI wireline/ rigless 07:30- Arrive on location. Held PJSM and discussed JSA w/ crew. R/U WSI wireline/ Key pump truck. Run CBL/GR/ CNL Logs. PBTD is 10,214. R/D

More information

EP WELLS DAILY OPERATIONS REPORT Report 14 05/04/2017

EP WELLS DAILY OPERATIONS REPORT Report 14 05/04/2017 5/5/27 5:5:26 Report Version: 4..6R9 Report 4 5/4/27 Company Type WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H 32656 / 4233326. Event Summary Event Type Completion

More information

Daily Drilling Report Onshore

Daily Drilling Report Onshore Daily Drilling Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Country: USA StateOCSG TEXAS FieldPermit#: WOLFCAMP EAST Supervisors: EngineerManager: MICHAEL AARON JAMES WILSON MOTLEY, DEREK MANGUM DANNY

More information

Frac Talk Laura Schafer 4 March 2016

Frac Talk Laura Schafer 4 March 2016 Frac Talk Laura Schafer 4 March 2016 My Path to Frac Education MS, BSc Chemical Engineering Colorado School of Mines Career Schlumberger 2002 2010 Well Services Manager Fracturing Cementing Coil Tubing

More information

How to Simplify Your Frac Site. Presented by Firstname Surname, Job Title

How to Simplify Your Frac Site. Presented by Firstname Surname, Job Title How to Simplify Your Frac Site Presented by Firstname Surname, Job Title Firstname Surname, Job Title Firstname Surname, Job Title We engineer your success. WEIR Oil & Gas is committed to improving the

More information

Oil & Gas. Simplified Frac Iron System

Oil & Gas. Simplified Frac Iron System Oil & Gas Simplified Frac Iron System 2 The shortest distance between two points is a straight line. Weir introduces that radical idea to the frac site. Simplicity delivered Consider the traditional frac

More information

Optimizing Completion Technology for Eastern European Shales

Optimizing Completion Technology for Eastern European Shales Optimizing Completion Technology for Eastern European Shales MARK VAN DOMELEN Senior Technical Advisor Technical Advisory Team Europe Halliburton Energy Services Current US Shale Gas Trends Increasing

More information

JJ Joubert is a Data Architect and unofficially official PPDM advocate at Drilling Info. Currently he is working specifically with Completion data,

JJ Joubert is a Data Architect and unofficially official PPDM advocate at Drilling Info. Currently he is working specifically with Completion data, JJ Joubert is a Data Architect and unofficially official PPDM advocate at Drilling Info. Currently he is working specifically with Completion data, Directional Surveys, and Hydraulic fracturing and the

More information

Frac Manifold Systems. Increase operational efficiencies of simultaneous completion operations

Frac Manifold Systems. Increase operational efficiencies of simultaneous completion operations Frac Manifold Systems Increase operational efficiencies of simultaneous completion operations Modular, flexible designs save time and money The equipment and technicians required to hydraulically fracture

More information

Optimizing Perforating Charge Design

Optimizing Perforating Charge Design Optimizing Perforating Charge Design for Stimulation Fracturing Unconventional Reservoirs Deep Penetrating (DP) Charges Natural Completions Focused on depth of Penetration Hole size is usually an after

More information

PTTC/DOE/RPSEA Gas Shales Workshop Marcellus Shale Hydraulic Fracturing

PTTC/DOE/RPSEA Gas Shales Workshop Marcellus Shale Hydraulic Fracturing PTTC/DOE/RPSEA Gas Shales Workshop Marcellus Shale Hydraulic Fracturing > Arlington Virginia > September 28 th, 2011 > Jordan Ciezobka - GTI RPSEA Marcellus Gas Shale Project Objective To enhance shale

More information

FracHOOK TM MULTILATERAL FRACTURING SYSTEM

FracHOOK TM MULTILATERAL FRACTURING SYSTEM Mihai Marcu - Baker Hughes 2009 CADE / CAODC Calgary, AB 1 OVERVIEW Preamble What Are The Industry s Requirements? FracHOOK TM System Technical Features And Benefits FracHOOK TM System Economical Benefits

More information

10XE AND 15XE Electric High-Pressure Washer

10XE AND 15XE Electric High-Pressure Washer 10XE AND 15XE Electric High-Pressure Washer 1-877-JD-KLEEN (1-877-535-5336) Motor Specs: 10XE 15XE Pump Oil Grade: Pump Oil Capacity: Nozzle Size: 10XE 15XE 1.5 HP / 1 Phase / 120 Volts 2.0 HP / 1 Phase

More information

Operating Instructions

Operating Instructions SPIN-PULL THREADED INSERT TOOL Operating Instructions Read All Safety Rules and Instructions Carefully Save this manual for Future Reference Complete Seal Kit IMPORTANT SAFETY WARNINGS: THE SAFETY WARNINGS

More information

TenarisXP Buttress Connection

TenarisXP Buttress Connection Connection Scope These guidelines apply specifically to the use of connections. This document should be used in conjunction with the TenarisHydril Running Manual, which is the main document applicable

More information

Operating Instructions

Operating Instructions SPIN-PULL THREADED INSERT TOOL Operating Instructions Read All Safety Rules and Instructions Carefully Save this manual for Future Reference IMPORTANT SAFETY WARNINGS: THE SAFETY WARNINGS BELOW CANNOT

More information

STERN TUBE SEAL STERN KEEPER C-TYPE MANUAL

STERN TUBE SEAL STERN KEEPER C-TYPE MANUAL STERN TUBE SEAL STERN KEEPER C-TYPE MANUAL C O N T E N T S CHAPTER 1 DESCRIPTION OF SAFETY 1 LIST OF WARNING 3 2 LIST OF CAUTION 4 CHAPTER 2 OUTLINE 5 1 INTRODUCTION 5 2 SPECIFICATION 5 2.1 SEAL TYPE 5

More information

GAR Labs is a large Skin Care & Hair Care Manufacturer

GAR Labs is a large Skin Care & Hair Care Manufacturer GAR Labs is a large Skin Care & Hair Care Manufacturer Here is a photo tour of many of the departments AND equipment we feel it takes to make a quality product. With this qualifying information hopefully

More information

FOOD GRADE EQUIPMENT LUBRICANTS

FOOD GRADE EQUIPMENT LUBRICANTS FOOD GRADE EQUIPMENT LUBRICANTS STOPLIGHT FOOD SAFETY PROGRAM MINIMIZE THE RISK OF FOOD CONTAMINATION Developed in response to a growing need within the industry to minimize the risk of food contamination

More information

Trends extracted from 1,200 Gulf Coast blowouts during

Trends extracted from 1,200 Gulf Coast blowouts during Comprehensive analysis of 1,06 blowout reports covering four U.S. Gulf Coast states and OCS waters over 6 years includes database handling procedures and discussion of well control failure causes Trends

More information

SPE Copyright 1999, Society of Petroleum Engineers Inc.

SPE Copyright 1999, Society of Petroleum Engineers Inc. SPE 53974 Killing Methods and Consequences of 112 Gulf Coast Blowouts During 196-1996 Skalle, P./NTNU, Trondheim, Jinjun H./Southwest Petroleum Institute, Nanchong, Podio, A.L./UT, Austin Copyright 1999,

More information

SM - HIGH PRESSURE ALL METAL FLOWMETER AND SWITCH

SM - HIGH PRESSURE ALL METAL FLOWMETER AND SWITCH SM - HIGH PRESSURE ALL METAL FLOWMETER AND SWITCH Flow Pressure Level Temperature measurement monitoring control S2 ±4% Full Scale Accuracy Maximum Pressure 3600 PSI/ 5000 PSI All Media Contacted Parts

More information

Zanjoe Incorporation

Zanjoe Incorporation Machine Guarding Checklist conducted for Zanjoe Incorporation Date and Time of Inspection 21 May 2018 09:24 AM Machine Name Industrial Machines Machine Number ZI-12346 Inspected by SafetyCulture Staff

More information

Flame Seal-TB General Information and Application Procedures

Flame Seal-TB General Information and Application Procedures Manufactured by FLAME SEAL PRODUCTS, INC. FLAME SEAL-TB technical support contact information: (800) 783-3526, (713) 668-4291 or email at flameseal@flameseal.com (24/7 year-round technical HOT LINE available

More information

Workshop Manual, Seal handbook part

Workshop Manual, Seal handbook part Workshop Manual, Seal handbook part Mechanical seals for Large C-Pumps, L-Pumps and P-Pumps equipped with 605-series, 705-series, 805-series, 905-series drive units 894483/01 2 Seal handbook part, Large

More information

Shale Gas World. Warsaw, 25 th November July Joel Price, COO. Lewino-1G2 Results. Lewino-1G2 Frac

Shale Gas World. Warsaw, 25 th November July Joel Price, COO. Lewino-1G2 Results. Lewino-1G2 Frac Shale Gas World Warsaw, 25 th November 2014 Joel Price, COO July 2014 Lewino-1G2 Frac Lewino-1G2 Results Disclaimer This presentation is incomplete without reference to, and should be viewed solely in

More information

Owner s Manual. Table of contents 2. Introuduction & Safty Standard 3. Important considerations 4. Identify Parts & Description 5.

Owner s Manual. Table of contents 2. Introuduction & Safty Standard 3. Important considerations 4. Identify Parts & Description 5. Owner s Manual Table of contents 2 Introuduction & Safty Standard 3 Important considerations 4 Identify Parts & Description 5 Massage System 6 Toepia Chair Assembly 7 Toepia LX Armrest Assembly Toepia

More information

OMNI Coupling System. Cast Couplings Straight & Reducing Transitions IMPORTANT LINKS. Description: Cast Couplings

OMNI Coupling System. Cast Couplings Straight & Reducing Transitions IMPORTANT LINKS. Description: Cast Couplings OMNI Coupling System Cast Couplings Straight & Reducing Transitions 441 IMPORTANT LINKS Click appropriate words to go to: Standard Limited Warranty Sales Terms & Conditions Freight Policy Returns Policy

More information

TECHNICAL INFORMATION Adhesive-Side Powder Development Catalog Nos. ASP150, ASP50D, ASP50L, TRA20

TECHNICAL INFORMATION Adhesive-Side Powder Development Catalog Nos. ASP150, ASP50D, ASP50L, TRA20 Copyright 2017 by SIRCHIE All Rights Reserved. TECHNICAL INFORMATION Adhesive-Side Powder Development Catalog Nos. ASP150, ASP50D, ASP50L, TRA20 INTRODUCTION Adhesive-Side Powder is used to develop latent

More information

Reindeer Mask with Animated Eyes

Reindeer Mask with Animated Eyes Reindeer Mask with Animated Eyes Created by Dano Wall Last updated on 2018-12-05 10:50:10 PM UTC Guide Contents Guide Contents Overview Parts Adafruit HalloWing M0 Express Convex Plastic Lens with Edge

More information

FINAL UTILITY REPORT WILLOW BEND SUBDIVISION Thornton, CO

FINAL UTILITY REPORT WILLOW BEND SUBDIVISION Thornton, CO FINAL UTILITY REPORT WILLOW BEND SUBDIVISION Thornton, CO February 0, 0 Revised: October 0 JN: 0 Prepared for: The True Life Companies DTC Parkway, Suite 7 Greenwood Village, CO 80 Prepared by: Jansen

More information

STRING LINES. If the frame is not fitted straight plumb and level the doors will not function correctly.

STRING LINES. If the frame is not fitted straight plumb and level the doors will not function correctly. STRING LINES To ease installation of this frame it has been fitted with string lines. If the frame is not fitted straight plumb and level the doors will not function correctly. To ensure the top and bottom

More information

JIP TO IMPROVE EAGLE FORD HYDRAULIC FRACTURING TECHNOLOGY

JIP TO IMPROVE EAGLE FORD HYDRAULIC FRACTURING TECHNOLOGY JIP TO IMPROVE EAGLE FORD HYDRAULIC FRACTURING TECHNOLOGY SUBMITTED TO: Oil Operators Service Companies Drilling Contractors National Oil Companies DR. WILLIAM MAURER MAURER ENGINEERING INC AUSTIN, TX

More information

Improvement of Grease Leakage Prevention for Ball Bearings Due to Geometrical Change of Ribbon Cages

Improvement of Grease Leakage Prevention for Ball Bearings Due to Geometrical Change of Ribbon Cages NTN TECHNICAL REVIEW No.78 2010 Technical Paper Improvement of Grease Leakage Prevention for Ball Bearings Due to Geometrical Change of Ribbon Cages Norihide SATO Tomoya SAKAGUCHI Grease leakage from sealed

More information

Metal And Canvas Double Robe

Metal And Canvas Double Robe Metal And Canvas Double Robe Assembly lnstructions - Please keep for future reference 1/8 /8 Dimensions Width - 11cm Depth - cm Height - 1cm Important - Please read these instructions fully before starting

More information

The Pennsylvania State University. The Graduate School. Department of Energy and Mineral Engineering

The Pennsylvania State University. The Graduate School. Department of Energy and Mineral Engineering The Pennsylvania State University The Graduate School Department of Energy and Mineral Engineering FRACTURE HEIGHT CONTAINMENT IN THE STIMULATION OF ORISKANY FORMATION A Thesis in Energy and Mineral Engineering

More information

Muskogee Public Schools Custodial Procedures for Carpet Care

Muskogee Public Schools Custodial Procedures for Carpet Care CARPET CARE ENTRANCE MATS PURPOSE A. Exterior Mats 1. Remove sand and gravel from shoes prior to entering the building. 2. Minimize the amount of abrading material that will scratch and damage interior

More information

FOR REFERENCE ONLY. TASK Hazards Who is at risk? Rick Level Mitigation Measures required: Working in unfamiliar environments for exhibition/event

FOR REFERENCE ONLY. TASK Hazards Who is at risk? Rick Level Mitigation Measures required: Working in unfamiliar environments for exhibition/event FOR REFERENCE ONLY TASK Hazards Who is at risk? Rick Level Mitigation Measures required: Working in unfamiliar environments for exhibition/event Inadequate action due to procedures and facility unfamiliar

More information

HYDRAULIC COMPONENTS HYDROSTATIC TRANSMISSIONS GEARBOXES - ACCESSORIES HT 12 / A / 352 / 1212 / E

HYDRAULIC COMPONENTS HYDROSTATIC TRANSMISSIONS GEARBOXES - ACCESSORIES HT 12 / A / 352 / 1212 / E HYDRAULIC COMPONENTS HYDROSTATIC TRANSMISSIONS GEARBOXES - ACCESSORIES Contents General Information... 4-5 Series 25401 / 25601... Series 25402 / 25602... Series 25403 / 25603... 6-7 8-9 10-11 Series 25403-1

More information

MEDICAL WASTE MANAGEMENT

MEDICAL WASTE MANAGEMENT MEDICAL WASTE MANAGEMENT Biological Safety INTRODUCTION PURPOSE Regulated medical waste is a designation for wastes that may contain pathogenic microorganisms which was previously termed infectious waste.

More information

Milk Jug Glow Skull. Created by John Park. Last updated on :28:36 PM UTC

Milk Jug Glow Skull. Created by John Park. Last updated on :28:36 PM UTC Milk Jug Glow Skull Created by John Park Last updated on 2018-09-14 09:28:36 PM UTC Guide Contents Guide Contents Overview Parts Materials & Tools Optional Skull/Sculpting Stand Build the Skull Prep the

More information

Owner s Manual. Maintenance for Pipeless (Sanijet ) 12, 13. Maintenance for Standard Pedicure Spa (Whirlpool Pump) 15, 16

Owner s Manual. Maintenance for Pipeless (Sanijet ) 12, 13. Maintenance for Standard Pedicure Spa (Whirlpool Pump) 15, 16 Owner s Manual Table of contents 2 Introuduction & Safty Standard 3 Important considerations 4 Identify Parts & Description 5 Massage System 6 Pacific 750 Chair Assembly 7 Pacific 300 Chair Assembly 8

More information

Hammer Time Mini Golf Hazard with Crickit

Hammer Time Mini Golf Hazard with Crickit Hammer Time Mini Golf Hazard with Crickit Created by John Park Last updated on 2018-07-09 06:47:53 AM UTC Guide Contents Guide Contents Overview Please Hammer, Don't Hurt Em Parts Materials & Tools Program

More information

Comparative Proteomics Kit II: Western Blot Module Quick Guide

Comparative Proteomics Kit II: Western Blot Module Quick Guide Comparative Proteomics Kit II: Western Blot Module Quick Guide Lesson 1 1 Label one 1.5 ml fliptop micro tube for each of five fish samples. Also label one screw-cap micro tube for each fish sample. 2.

More information

Positive-Turn Reverse Parts Manual

Positive-Turn Reverse Parts Manual 2 (55mm), 2 1/2 (65mm), 2 1/2 Short (65mm), 3 (76mm), 4 (100mm), 5 1/8 (130mm) Positive-Turn Reverse Parts Manual P1.07 VPT200 Serial No. 110001- VPT250 Serial No. 210001- VPT250 Short Serial No. 210001-

More information

WINDOWS, DOORS AND FAÇADE ELEMENTS MADE OF ALUMINIUM. Operation, maintenance and care

WINDOWS, DOORS AND FAÇADE ELEMENTS MADE OF ALUMINIUM. Operation, maintenance and care RAICO WINDOWS, DOORS AND FAÇADE ELEMENTS MADE OF ALUMINIUM Operation, maintenance and care Contents 1. Hazard Notes 2. Operation Windows and French doors 2.1 Tilt & Turn element 2.2 Turn-Only element 2.3

More information

Artesian Pedicure System

Artesian Pedicure System Installation Requirements Installation of the Collins pedicure unit is straightforward and comparable to installation of a residential hot tub or whirlpool. The utility requirements are as follow: 1 ½

More information

Procedures and Practices for Flexo News Inks

Procedures and Practices for Flexo News Inks Procedures and Practices for Flexo News Inks SAFETY RULES RAW INK PRESS-READY INK DILUTING THE INK TO PRESS VISCOSITY FALSE VISCOSITY (THIXOTROPY) AUTOMATIC VISCOSITY CONTROL PRESS-READY INK STORAGE INK

More information

Big Sky Product Information Sheet. System 10 Acrylic Enamel Color System

Big Sky Product Information Sheet. System 10 Acrylic Enamel Color System Big Sky Product Information Sheet Technical Support (800) 328-4892 P.I. Sheet #1031 System 10 Acrylic Enamel Color System READ ENTIRE PRODUCT INFORMATION SHEET PRIOR TO USE. IF ANY QUESTIONS ARISE, PLEASE

More information

Performance Standard Why is it Important? Medical Grade Benchmark Robinson Healthcare Product

Performance Standard Why is it Important? Medical Grade Benchmark Robinson Healthcare Product Cotton Wool High quality consumer cotton wool products have been central to Robinson Healthcare s manufacturing philosophy for over 50 years. Today s products - Soft & Pure and Cottontails - offer superior

More information

PARTS LIST FOR WC-150-0ME3 WATER CANNON. Copyright 2000, Mi-T-M Corporation Issue Date:

PARTS LIST FOR WC-150-0ME3 WATER CANNON. Copyright 2000, Mi-T-M Corporation Issue Date: PARTS LIST FOR WC-150-0ME3 WATER CANNON Congratulations on the purchase of your new Mi-T-M Water Cannon! This parts listing has been complied for your benefit. You can be assured your Mi-T-M Water Cannon

More information

PROFESSIONAL SPOTTING KIT

PROFESSIONAL SPOTTING KIT CLEANING SOLUTIONS Table of Contents Fire Restoration Products... 2 Emulsifier/Prespray Products... 3 Interim Cleaning Products... 2-3 Spotting Products... 4 Upholstery Care... 5 Deodorizers... 5 Green

More information

PARTS LIST FOR WC-100-0ME3 WATER CANNON. Copyright 2000, Mi-T-M Corporation Issue Date:

PARTS LIST FOR WC-100-0ME3 WATER CANNON. Copyright 2000, Mi-T-M Corporation Issue Date: PARTS LIST FOR WC-100-0ME3 WATER CANNON Congratulations on the purchase of your new Mi-T-M Water Cannon! This parts listing has been complied for your benefit. You can be assured your Mi-T-M Water Cannon

More information

3D Printing Guide: MakerBot Replicator 2X

3D Printing Guide: MakerBot Replicator 2X SOUTHERN POLYTECHNIC STATE UNIVERSITY 3D Printing Guide: MakerBot Replicator 2X Operating and Troubleshooting Guide Architecture Department 8/13/2014 Revision Table Version Dated Description By 1.00 06/25/2014

More information

Application Guide. Manual Applicators 16 Floor Coating Foam Pad, 18 Paint Tray, NylFoam Stain Pad, Foam Brush, Wiping Rags, Sponges.

Application Guide. Manual Applicators 16 Floor Coating Foam Pad, 18 Paint Tray, NylFoam Stain Pad, Foam Brush, Wiping Rags, Sponges. Application Guide Optional Tools & Supplies Professional Mechanical Equipment High Volume Low Pressure (HVLP) Sprayer, Airless Paint Sprayer w/#11 Tip, Wood Sander, Floor Buffer, Pressure Washer, Commercial

More information

FIRE RESTORATION PRODUCTS

FIRE RESTORATION PRODUCTS CLEANING SOLUTIONS Table of Contents Fire Restoration Products... 2 Emulsifier/Prespray Products... 3 Interim Cleaning Products... 2-3 Spotting Products... 4 Upholstery Care... 5 Deodorizers... 5 Green

More information

online for convenience

online for convenience Erica s ATA Erica s ATA EricasMT20 P: 614.895.7181 TF: 877.909.7181 E: sales@ericasata.com online for convenience ELECTRIC FILES T-300 Powerful and affordable with high RPM and torque Made of stainless

More information

THUNDER BAY REGIONAL RESEARCH INSTITUTE STATEMENT of POLICY and PROCEDURE Manual: Joint Health & Safety SPP No. JH Section: Issued: May 6, 2011

THUNDER BAY REGIONAL RESEARCH INSTITUTE STATEMENT of POLICY and PROCEDURE Manual: Joint Health & Safety SPP No. JH Section: Issued: May 6, 2011 Page: 1 of 6 POLICY This policy outlines the safety, access approval process, and training requirements, for the Thunder Bay Regional Research Institute s (TBRRI) Machine Shop, located within TBRRI s facilities

More information

DOWSIL 9040 Silicone Elastomer Blend

DOWSIL 9040 Silicone Elastomer Blend Technical Data Sheet FEATURES & BENEFITS Compatible with a variety of lipophilic active ingredients such as fragrances, sunscreens, vitamins, and vitamin derivatives Clear to slightly translucent crosslinked

More information

L E N O X OWNER S MANUAL. Please read user s Manual thoroughly before using pedicure spa. Product of J&A Copyright 2010 by J&A USA Inc.

L E N O X OWNER S MANUAL. Please read user s Manual thoroughly before using pedicure spa. Product of J&A Copyright 2010 by J&A USA Inc. L E N O X DS OWNER S MANUAL Please read user s Manual thoroughly before using pedicure spa Product of J&A Copyright 2010 by J&A USA Inc. Printed in USA Table of contents Warranty form Service inquiry form

More information

Section 6 Marking & Identification

Section 6 Marking & Identification Section 6 Contents Ball Marker...158 Crayons...158 Line Marking Machine 154-155 Line Marking Paint...154 Marking Pens...150-151 Tape Measures...157 Paint Markers...151 Spot Marking Paint...153 Spray Paint...152-154

More information

PEDICURE SPA USER MANUAL

PEDICURE SPA USER MANUAL Version 1.1 12/07/2017 Leader in Skincare and Spa Equipment PEDICURE SPA USER MANUAL SkinAct Before Operating the unit, please read this manual thoroughly and retain it for future reference. RECEIVING

More information

The Evolution of. Hydraulic Fracturing In the Bakken Petroleum System

The Evolution of. Hydraulic Fracturing In the Bakken Petroleum System The Evlutin f Hydraulic Fracturing In the Bakken Petrleum System 1 Murex Petrleum Crpratin is Driven t Be a Leader in the Willistn Basin Privately held upstream il & gas cmpany perating primarily in the

More information

Urine Collection Kit. just between us. This kit contains: Before you begin! Access Key label here

Urine Collection Kit. just between us. This kit contains: Before you begin! Access Key label here just between us Urine Collection Kit Before attempting to collect your sample, please read these instructions carefully. Access Key label here This kit contains: SECURITY SEAL Paper Cup Sample Tube Security

More information

sign hangers & sign holders

sign hangers & sign holders 21 ceiling clips price at: 12 100 140000 wire t bar ceiling clip (min 12) metal.25.20 140001 lexan t bar ceiling clip (min 12) clear.60.50 140003 mobile button for ceilings white.35.20 ¾ square with adhesive

More information

These are the same tools I use to get airbrushes. clean and pristine. Kirk Lybecker Iwata Technical Services

These are the same tools I use to get airbrushes. clean and pristine. Kirk Lybecker Iwata Technical Services PN: CL 100 These are the same tools I use to get airbrushes clean and pristine. Kirk Lybecker Iwata Technical Services Iwata Airbrush Cleaning Kit includes: Illustrated Instructions Step-by-step process

More information

GPS Logging Dog Harness

GPS Logging Dog Harness GPS Logging Dog Harness Created by Becky Stern Last updated on 2015-01-15 10:15:19 PM EST Guide Contents Guide Contents Overview Circuit Diagram Sew Circuit Use It! 2 3 5 6 15 Adafruit Industries https://learn.adafruit.com/gps-logging-dog-harness

More information

Confessions of a Frac Engineer: Your Reservoir is Much More Productive than we Thought It s my Frac that is Failing. Outline

Confessions of a Frac Engineer: Your Reservoir is Much More Productive than we Thought It s my Frac that is Failing. Outline Confessions of a Frac Engineer: Your Reservoir is Much More Productive than we Thought It s my Frac that is Failing Mike Vincent mike@fracwell.com Fracwell LLC Microseismic image: SPE 119636 Goals of fracturing

More information

Xzilon3 Application Instructions

Xzilon3 Application Instructions www.granitizeaviation.com Xzilon3 Application Instructions GENERAL PRACTICES: Review Xzilon3 DVD (available in X3500 kits.) Apply only in a well ventilated area. The aircraft surface temperature should

More information

US Proppant Market & Forecast Report: 2015 to 2020

US Proppant Market & Forecast Report: 2015 to 2020 TABLE OF CONTENTS TABLE OF CONTENTS 1.0 Introduction 1.1 Report methodology 1.2 About Proppant Today, LLC 2.0 Legal Disclaimer 3.0 Executive Summary 4.0 Hydraulic Fracturing and Proppant Use 4.1 Unconventional

More information

Crawling Animatronic Hand

Crawling Animatronic Hand Crawling Animatronic Hand Created by Dano Wall Last updated on 2018-12-03 06:39:35 PM UTC Guide Contents Guide Contents Overview Parts Used Tools & Materials Prepare the Hand Your hand is now ready to

More information

So... You Want To Use The 3D Printers

So... You Want To Use The 3D Printers So... You Want To Use The 3D Printers 3D Printing Overview When a student would like to use the 3D Printers: 1. They should contact a supervisor and prepare the build plate. 2. Supervisors will level the

More information

University of Wisconsin-Madison Hazard Communication Standard Policy Dept. of Environment, Health & Safety Office of Chemical Safety

University of Wisconsin-Madison Hazard Communication Standard Policy Dept. of Environment, Health & Safety Office of Chemical Safety University of Wisconsin-Madison Hazard Communication Standard Policy Dept. of Environment, Health & Safety Office of Chemical Safety 1.0 Introduction... 1 1.1 Purpose... 1 1.2 Regulatory Background...

More information

Prevailing Wage Rates

Prevailing Wage Rates (2 AXLE) DRIVER - EQUIPMENT 12/1/2008 $42.330 (3 AXLE) DRIVER - EQUIPMENT 12/1/2008 $42.400 (4 & 5 AXLE) DRIVER - EQUIPMENT 12/1/2008 $42.520 ADS/SUBMERSIBLE PILOT 8/1/2008 $97.960 8/1/2009 $102.480 8/1/2010

More information

Making a Bangle Bracelet using a Metal Core from Arizona Silhouette

Making a Bangle Bracelet using a Metal Core from Arizona Silhouette Making a Bangle Bracelet using a Metal Core from Arizona Silhouette Supplies needed: Metal Core (stainless steel (BG200SS) or copper (BG201CU), bangle core blanks made from stabilized wood or acrylic material

More information

Crickit Powered Holiday Diorama

Crickit Powered Holiday Diorama Crickit Powered Holiday Diorama Created by Isaac Wellish Last updated on 2018-12-04 12:49:07 AM UTC Guide Contents Guide Contents Overview Prerequisite Guides Adafruit Parts Tools and Materials Wiring

More information

2 in 1Hydro peel machine

2 in 1Hydro peel machine 2 in 1Hydro peel machine User Manual Thank you very much for purchasing Please read the instructions carefully before using the normal operation and save it after reading; The use of this beauty instrument

More information

Bunny Ears with MakeCode

Bunny Ears with MakeCode Bunny Ears with MakeCode Created by Erin St Blaine Last updated on 2018-08-22 04:05:47 PM UTC Guide Contents Guide Contents Introduction Tools & Other Materials Programming with MakeCode Set Up the Light

More information

3D Printed LED Goggles

3D Printed LED Goggles 3D Printed LED Goggles Created by Rick Winscot Last updated on 2016-01-04 12:05:18 PM EST Guide Contents Guide Contents Overview Tools / Materials 3D Printing Bridge Assembly NeoPixel Rings Lenses Wire,

More information

Mad Science Test Tube Rack

Mad Science Test Tube Rack Mad Science Test Tube Rack Created by John Park Last updated on 2016-10-17 09:21:01 PM UTC Guide Contents Guide Contents Overview Lighted Test Tube Parts Materials and Tools Optional Test Tube Rack Parts

More information

Wood Window Repair 101

Wood Window Repair 101 Wood Window 101 Compiled August 2017 by Hallie J. Borstel, MPS, Staub Window Restorations, LLC Why? A little know-how, a few hours, and a lot of elbow grease. Basic repairs like a new coat of paint, reglazing,

More information

B-SERIES CONVERSION INSTRUCTIONS

B-SERIES CONVERSION INSTRUCTIONS B-SERIES CONVERSION INSTRUCTIONS The B-SERIES inks are designed to replace the OEM ink set for the Brother GT3 Direct To Garment printer. These inks are designed with high performance capabilities, 35

More information

INFECTION PREVENTION AND CONTROL PLAN

INFECTION PREVENTION AND CONTROL PLAN INFECTION PREVENTION AND CONTROL PLAN FACILITY NAME: FACILITY ID: ADDRESS: CITY: STATE: ZIP: OWNER S NAME: PHONE: ( ) The owner, employees and practitioners of the above body art facility have developed

More information

Hayes Performance Systems 5800 W. Donges Bay Rd. Mequon, WI Tel: Web:

Hayes Performance Systems 5800 W. Donges Bay Rd. Mequon, WI Tel: Web: Pro & COMP Hayes Performance Systems 5800 W. Donges Bay Rd. Mequon, WI 53092 Tel: 888.686.3472 Email: techsupport@hayesbicycle.com Web: www.hayescomponents.com Hayes Components Europe Dirnismaning 20 a

More information

ACTIVE GEL HEALTHY IN PARTNERSHIP WITH

ACTIVE GEL HEALTHY IN PARTNERSHIP WITH ACTIVE GEL HEALTHY IN PARTNERSHIP WITH Gel Achilles Heel Sleeve Effective on Achilles tendonitis, bursitis, heel pain, and pump bump Soothes and moisturises Suitable for most shoes, athletic footwear,

More information

Biohazardous Waste. 1. Solid Biohazardous Waste (non-sharps) Storage

Biohazardous Waste. 1. Solid Biohazardous Waste (non-sharps) Storage Biohazardous Waste There are 4 general categories of biohazardous wastes based on the physical form of the waste. Each form must be segregated, identified, decontaminated and disposed of in an appropriate

More information

STOLLOWEEN. Fluffy

STOLLOWEEN.   Fluffy STOLLOWEEN http://www.themadlab.com/february2009tutorial.htm Fluffy List of materials: Christmas reindeer-25.00 mask-42.00 faux fur-18.00 materials already on hand, PVC chicken wire foam (soft & rigid)

More information

Tender Notice No. DGVCL/SP/10048/Ind. Safety Shoes, PVC Boot & Rain Coat. Item No. 1 : Specifications of Industrial Safety Shoes

Tender Notice No. DGVCL/SP/10048/Ind. Safety Shoes, PVC Boot & Rain Coat. Item No. 1 : Specifications of Industrial Safety Shoes Sr. Item 1 : s of Industrial Safety Shoes Certification IS 15298 PART ( II ) 1 Upper leather Full Grain Barton Non Din leather. 2 Upper leather thickness 1.8 mm- 2.20 mm +/- 0.2 mm 3 Toe Composite toe

More information

Fume Hood ECON VAV Controls

Fume Hood ECON VAV Controls ECON VAV Controls Increases Safety, Conserves Energy and Save You Money AFA 1000 / E / BLD Fresh Air Bleed Fresh Air Bleed Constant Discharg e Velocity Extract Duct Pressure Constant Speed Exhaust Blower

More information

10 Optidome. AMODEX, 3% Hydrogen Peroxide

10 Optidome. AMODEX, 3% Hydrogen Peroxide 10 Optidome Setup Instructions Product Care General Fabric and Product Care Handling Fabric should always be handled in a clean area with clean hands and equipment. Cleaning An Emergency Stain Treatment

More information

Glowing Smokey Skull. Created by Ruiz Brothers. Last updated on :03:40 PM UTC

Glowing Smokey Skull. Created by Ruiz Brothers. Last updated on :03:40 PM UTC Glowing Smokey Skull Created by Ruiz Brothers Last updated on 2018-08-22 04:03:40 PM UTC Guide Contents Guide Contents Overview Easy DIY Halloween Props Electronic Halloween! Circuit Playground NeoPixels

More information

Gear case. Part Number OEM Number Description Product Photo. Standard: Ø28mmx11T Gear case assy. Standard: M5x25 + M6x25 Bracket assy

Gear case. Part Number OEM Number Description Product Photo. Standard: Ø28mmx11T Gear case assy. Standard: M5x25 + M6x25 Bracket assy Gear case Gear case 05-8001 11002-50178 Fits for: Shindaiwa C35/B45 Gear case 05-8005 72080-13010 Fits for: Shindaiwa B45 Standard: Ø28mmx11T Gear case assy 05-8006 72017-13010 Fits for: Shindaiwa C35

More information

EMS Standard Operating Procedures Policy Title:

EMS Standard Operating Procedures Policy Title: EMS Standard Operating Procedures Policy Title: Uniforms & Appearance Section: Operations Adoption Date: 07/24/2000 Date of Most Recent Update: 09/2017 CAAS Criteria Reference: Purpose: To provide guidelines

More information

FLAKES, LIGHTNING FX & PASTE PEARLS TECHNICAL DATA SHEET

FLAKES, LIGHTNING FX & PASTE PEARLS TECHNICAL DATA SHEET FLAKES, LIGHTNING FX & PASTE PEARLS TECHNICAL DATA SHEET Check local VOC DESCRIPTION Flakes are precision cut, resin coated chips for adding intense sparkle to custom paint jobs. Lightning FX are vibrant,

More information

ATS-SOI-5731 Page: 1 of 5. Approval Block. Prepared by: Signature Date Margaret Crouse 18 JUN Reviewed by: Signature Date

ATS-SOI-5731 Page: 1 of 5. Approval Block. Prepared by: Signature Date Margaret Crouse 18 JUN Reviewed by: Signature Date ATS-SOI-5731 Page: 1 of 5 Approval Block Prepared by: Signature Date Margaret Crouse 18 JUN 2014 Reviewed by: Signature Date Brian Flynn 18 JUN 2014 Approved by: Signature Date Kristal Jewell 18 JUN 2014

More information

SECTION UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS: CONDUIT SYSTEMS FOR USE IN CORROSIVE ENVIRONMENTS

SECTION UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS: CONDUIT SYSTEMS FOR USE IN CORROSIVE ENVIRONMENTS SECTION 16130 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS: CONDUIT SYSTEMS FOR USE IN PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Furnishing, installation, and assembly of PVC coated electrical

More information

Product Data 367 Acrynamel

Product Data 367 Acrynamel Product Data 367 Acrynamel PRODUCTS 367 Acrynamel Colour 367 Reducer R303-Normal Conditions, R203-Hot Conditions Product Description 367 Acrynamel is a single pack, fast drying, premium acrylic alkyd based

More information

Eye and Face Protection

Eye and Face Protection Eye and Face Protection G. Miller, F. Plummer, and E. Asmatulu Department of Environmental Health and Safety Wichita State University May 19, 2014 Related Videos https://www.youtube.com/watch?v=jnjpte2yyz4

More information

Printed: 10 APR :37 AM. Page 1 of 11 38" STAR DOBBY DRESS 11 NOV :26 PM TB7JYW 10 APR :36 AM TB8AXB

Printed: 10 APR :37 AM. Page 1 of 11 38 STAR DOBBY DRESS 11 NOV :26 PM TB7JYW 10 APR :36 AM TB8AXB Folder Summary - Wovens Dresses (06) SM 07 NOV 06 06:6 PM TB7JYW 0 APR 07 08:6 AM TB8AXB Agent: Pre-Dev Vendor: Prod Vendor: Muslin Needed: Li Fung Range: Tech Designer: Annmarie Borneo Li Fung Designer

More information