FINAL UTILITY REPORT WILLOW BEND SUBDIVISION Thornton, CO
|
|
- Sherilyn Taylor
- 5 years ago
- Views:
Transcription
1 FINAL UTILITY REPORT WILLOW BEND SUBDIVISION Thornton, CO February 0, 0 Revised: October 0 JN: 0 Prepared for: The True Life Companies DTC Parkway, Suite 7 Greenwood Village, CO 80 Prepared by: Jansen Strawn Consulting Engineers West nd Avenue Denver, CO 80 Thomas C. Jansen, PE No. 9 Principal solutions. partnerships. success. t 0.6. f West nd Avenue, Denver, Colorado 80
2 Willow Bend Phase February 0, 0 Page CERTIFICATIONS The True Life Companies hereby certifies that the utilities (water and sanitary sewer) for the Willow Bend Subdivision will be constructed to the design presented in this report. I understand that the City of Thornton does not and shall not assume liability for the utilities designed and/or certified by my engineer. I understand that the City of Thornton reviews utility plans but cannot, on behalf of Carlson Associates, guarantee that final utility design review will absolve Carlson Associates and/or their successors and/or assigns of future liability for improper design. I further understand that approval of the Final Plan and/or Final Development Plan does not imply of my engineer s utility design. Attest: Name of Responsible Party Notary Public Authorized Signature I hereby certify that this report (plan) for the Final Utility design of water and sanitary sewer for the Willow Bend Subdivision was prepared by me (or under my direct supervision) in accordance with the provisions of the City of Thornton Standards and Specifications for the Responsible Parties thereof. I understand that the City of Thornton does not and will not assume liability for utilities designed by others. Thomas C. Jansen, PE State of Colorado Registration No. 9 For and on behalf of Jansen Strawn Consulting Engineers, Inc. Date t 0.6. f West nd Avenue, Denver, Colorado 80
3 Willow Bend Phase February 0, 0 Page T A B L E O F C O N T E N T S I. INTRODUCTION... II. GENERAL LOCATION AND DESCRIPTION... III. EXISTING UTILITIES... IV. PROPOSED UTILITIES... 6 V. REFERENCES... 8 APPENDIX A Maps Vicinity Map APPENDIX B Water Water Calculations APPENDIX C Sanitary Sewer Sanitary Sewer Calculations APPENDIX D Plans Overall Utility Plan A P P E N D I C E S t 0.6. f West nd Avenue, Denver, Colorado 80
4 Willow Bend Phase February 0, 0 Page I. INTRODUCTION The purpose of this Final Utility Report is to analyze the impact of the proposed Phase development of the Willow Bend subdivision on the existing water and sanitary sewer infrastructure and adequately size proposed infrastructure to service the users of this development. II. GENERAL LOCATION AND DESCRIPTION A. Site Location The Willow Bend Subdivision (Site) is located in the southeast quarter of Section 8, Township South, Range 67 West of the Sixth Principal Meridian, Adams County, Colorado. The site lies to the north of East th Avenue and west of Holly Street. The Lewis Pointe subdivision under construction is located adjacent to the South and existing large estate residential located east and west of the site. Undeveloped property and the E70 highway are located to the north. See Appendix A for the vicinity and phasing map. B. Description of Property An overall Conceptual Site Plan (CSP) for the Willow Bend subdivision was approved in January 00 and an amendment to the CSP is currently under administrative review by the City of Thornton. The Willow Bend subdivision is currently being platted which is also under review by the City of Thornton. The overall site consists of approximately 0 acres of land proposed to be developed into single family detached residential units, two City parks, a school site, and drainage improvements to the Todd Creek drainage channel. Phase consists of approximately 0 single family detached lots, a portion of one City park and improvements to the Todd Creek drainage channel. Phase - consists of approximately 0 single family detached lots and a portion of one City park. This report addresses the site s utility improvement for all phases. The existing site is undeveloped farmland with two farm ponds and an irrigation ditch in the northwest corner of the site. The site has experienced limited oil and gas development with five capped wells. The topography slopes gradually from southwest to northeast. III. EXISTING UTILITIES A. Potable Water System t 0.6. f West nd Avenue, Denver, Colorado 80
5 Willow Bend Phase February 0, 0 Page Information regarding existing water facilities has been gathered from the City of Thornton, utility locates in the field and approved Construction Plans for the Lewis Pointe subdivision currently under construction to the South. According to these sources, the subject property is located within Pressure Zone H. This zone has a hydraulic grade line (HGL) of,6 feet. The highest anticipated ground elevation after grading is,80 feet and the lowest developable elevation on the site is,. Based on this information, the highest static pressure on the site has been calculated to be psi and the lowest static pressure is 9 psi. An existing City of Thornton 6 inch water main is located within Holly Street which currently terminates near st Avenue to the south of the Willow Bend development. The Lewis Pointe subdivision to the south of the site is currently extending this 6 water main north along Holly Street. This report assumes this line is existing and if it is not constructed prior to the Willow Bend construction the developer will be responsible to extend the 6 inch waterline within Holly Street along the Lewis Pointe subdivision up to the intersection of th and Holly Street. Also, an 8 water at the intersection of Fairfax Drive and th Avenue has already been built as part of the Lewis Pointe subdivision. In addition to the City of Thornton water main, a Highplains Water Association inch water main line is located within Holly Street to the east of the site and East th Avenue to the south of the site. This main will be relocated outside of the paved area anticipated for Holly Street and th Avenue. The Lewis Pointe subdivision is relocating the inch main within th to the south side of the right-of-way. The Willow Bend subdivision will relocate the main outside of future Holly Street. B. Sanitary Sewer The Willow Bend site is located in the Todd Creek sanitary outfall system. A Master Sanitary Sewer Outfall study has been completed by the City of Thornton that includes the Willow Bend subdivision. The construction of the required downstream sanitary system is currently under construction through the Parterre Metropolitan District. It is anticipated that the downstream infrastructure will be completed by early 0 which provides a sanitary sewer stub at Holly Street near the northeast corner of the site. If this infrastructure is not completed prior to construction of Willow Bend, the project developer will be responsible to construct the infrastructure. t 0.6. f West nd Avenue, Denver, Colorado 80
6 Willow Bend Phase February 0, 0 Page 6 IV. PROPOSED UTILITIES Willow Bend is planned to be constructed in three Phases. Each phase will require looped water system and sanitary sewer outfall. Utilities for Willow Bend are addressed within this report. A. Potable Water System This project shall rely on the existing 8 inch water main stub located at the intersection of Fairfax Drive and th Avenue, as well as an existing 6 water main located within Holly Street that is currently under construction. The first connection will be at th Avenue & Holly Street where the 6 inch main will be continued north along Holly Street to a future roadway entrance and looped back. The second connection will be to an 8 inch stub in th Avenue and Fairfax Drive where the system extends into the Lewis Point subdivision. The Holly Street main will be stubbed for future tie-in north of the project. All waterlines are looped except at cul-de-sac locations as shown on the attached Utility Map. All waterline mains will be 8 PVC except in Holly Street where 6 ductile iron pipe will be utilized. All fire hydrant connections will be 6 ductile iron pipe except where hydrants are temporarily placed at the end of waterline mains. A WaterCAD model was prepared for Willow Bend utilizing the model from Lewis Point Phase & (pressure zone A) using City of Thornton criteria and the following scenarios within Zone H: Average Day - Max Pressure=00 psi, Min Pressure=0 psi Max Daily + Fire Flow - Min Pressure=0 psi, Max Velocity=. fps Peak Hour - Min Pressure = 0 psi, Max Velocity= fps Fire Flow Rate =,00 gpm Design criteria used is as follows:. persons per dwelling Average Day = 0 gallons per person per day Maximum Monthly =.8 x Average Day Maximum Daily =. x Average Day Maximum Hourly =.76 x Average Day Water demands for each water node were determined using the above criteria and scenarios. Based on the model the peak hour max pressure is 88. psi and the min pressure is 60. psi. The maximum daily plus fire flow scenario yielded a min pressure of t 0.6. f West nd Avenue, Denver, Colorado 80
7 Willow Bend Phase February 0, 0 Page 7. psi with a max velocity of.0 fps. The max pressure for all scenarios is found in the northeast corner of the site at Junction J-6 and the minimum pressure is found in the south-central portion of the site within a cul-de-sac at Junction J-. Based on the high pressures, PRVs have been proposed at both points of connection to Lewis Pointe waterlines located near Fairfax Drive and th Avenue as well as Holly Street and th Avenue. The proposed PRVs will reduce the pressure from zone A to zone H. Detailed results can be found in Appendix B. The proposed waterline will cross the Todd Creek drainage at th Lane at which point it will be encased per criteria. Cathodic protection will be installed per the geotech report. B. Sanitary Sewer The sanitary sewer has been designed to meet City of Thornton Standards and Specifications. The entire Willow Bend subdivision ties to a proposed inch sanitary sewer main line currently under construction at Holly Street south of E70. This main is being constructed as part of the North Holly Interceptor plans by the Parterre Metropolitan District. A design for this outfall was completed by Jansen Strawn Consulting Engineers. Criteria used is as follows:. persons per dwelling Average Day (F) = 80 gallons per person per day Peaking factor =.7 / (F 0.9 ) [. max,.0 min] Design Slope for 8 pipe between 0.0% and.00% Velocity between and 0 feet per second Design capacity for pipes smaller = 0% maximum capacity The Willow Bend site, including a future school, has been analyzed as three overall basins connecting to the North Holly Interceptor main on the northwest portion of the site. A future muli-family and single-family development to the northwest of the site has been accounted for in the sanitary sewer design. The basin contains all lots within the entire development consisting of 0 dwelling units. The average flow for the basin is 0. million gallons per day (mgd). Eight and twelve inch mains shall adequately serve these basins utilizing minimum slopes as shown in the calculations within the appendix. The proposed sanitary sewer will cross the Todd Creek drainage at th Lane, 8 th Avenue, and Signal Ditch Parkway, at which points it will be encased per criteria. Cathodic protection will be installed per the geotech report. t 0.6. f West nd Avenue, Denver, Colorado 80
8 Willow Bend Phase February 0, 0 Page 8 V. REFERENCES. City of Thornton Standards and Specifications, City of Thornton, October 0.. Water and Wastewater Systems Master Plan City of Thornton, The Engineering Company, May 00. Final Utility Report Lewis Pointe Subdivision Phase &, Jansen Strawn Consulting Engineers, November 0. t 0.6. f West nd Avenue, Denver, Colorado 80
9 APPENDIX A Maps Vicinity and Subdivision Map t 0.6. f West nd Avenue, Denver, Colorado 80
10
11
12 APPENDIX B Domestic Water Water Demands WaterCAD Plan View WaterCAD Output t 0.6. f West nd Avenue, Denver, Colorado 80
13 Willow Bend - All Phases Water Demand Calculations Date: /8/0 Prepared by: JGL Persons/Unit =. Average Day Demand = 0 gpdpp Maximum Daily Demand =. x Average Day Demand Maximum Hourly Demand =.76 x Average Day Demand Fire Demand = 000 gpm Demand Number of Average Day Maximum Daily Maximum Hourly Junction units Persons gpd gpm gpd gpm gpd gpm J J J J J J J J J0 0.,.,968. 8,9 6. J 0.0,7.6 6,60. 9, J J 7.,6.,9 8. 0,866. J ,0.9,8 9., J 0.0,7.6 6,60. 9, J6 9.0,68., , J ,80.8 6, ,69. J ,8 6.8,6.9 6,6 9. J9 7. 0,868 7.,776. 6,97. J , , 9.6 0,67. J ,0. 9, ,88. J.80,070. 6,6.6,9 8. J ,0.9,8 9., J 9.0,68., , J 0.0,7.6 6,60. 9, J6.80,070. 6,6.6,9 8. J7 7.,6.,9 8. 0,866. J8.0 6,0. 9,87.8,770.8 J ,.0,8 6.,7 9.0 J0.7 7,76.,80 7.,7. J ,0 7.,0.0 9,66. J ,0.9,8 9., J ,0.9,8 9., J 9.0,68., , J.8 6,78.7,8.0 8, J ,80.8 6, ,69. J7 0.0,7.6 6,60. 9, J8 7.,6.,9 8. 0,866. J9 7.9,69.0 8,6.7,789.8 J0 7.,6.,9 8. 0,866. of
14 Willow Bend - All Phases Water Demand Calculations J 9.0,68., , J.0 6,0. 9,87.8,770.8 J 9.0,68., , J 7.,6.,9 8. 0,866. J 9.0,68., , J ,0.9,8 9., J7 0.0,7.6 6,60. 9, J8 7.9,69.0 8,6.7,789.8 J9 7.9,69.0 8,6.7,789.8 J0.80,070. 6,6.6,9 8. J 7.,88.8 8,80.8,90 0. J.7 7,76.,80 7.,7. J 8.0 7,.0,8 6.,7 9.0 J 9.0,68., , J 7.,6.,9 8. 0,866. J6.80,070. 6,6.6,9 8. J7 0.,.,968. 8,9 6. J8 0.0,7.6 6,60. 9, J9 7.,88.8 8,80.8,90 0. J60 9.0,68., , J ,8 6.8,6.9 6,6 9. J6 9.0,68., , J ,.0,8 6.,7 9.0 J ,0.9,8 9., Totals of
15 STREET U STREET C STREET V 8 STREET V STREET W STREET X STREET Y TRACT J BRADLEY PARKWAY TRACT J TRACT J WillowBend Scenario: Average Day J-7 J-7 STREET V J-6 J- J- J- J- STREET Z BRADLEY PARKWAY J-8 J-9 J-6 STREET U J- J-6 J- J- J- J- FAIRFAX DRIVE J- STREET K J- J- STREET S J-0 J-0 J-9 STREET S J-7 J- J-0 J-9 J- STREET R STREET H STREET N J-8 J-6 J-0 STREET C STREET G J-9 STREET B J- FAIRFAX DRIVE J-0 STREET Q STREET H STREET K J-7 J-8 CREEK J-6 STREET P J-9 J- STREET C J-8 STREET F J-7 S. MCINTYRE ST. J- J- J-9 J- J- STREET K J-6 STREET M J- TODD J-6 J- STREET P J-7 STREET N STREET O HOLLY STREET J-8 STREET E STREET F STREET F J-6 J- J-8 STREET D S. MCINTYRE ST. J-6 TRACT L FAIRFAX DRIVE STREET I J- J- STREET J STREET K J- J- STREET L J-60 STREET P STREET N J-6 HOLLY ST S. MCINTYRE ST. STREET L STREET N J- J- TH AVE /0/0 7 Siemon Company Drive Suite 00 W Watertown, CT 0679 USA Page of
16 Active Scenario: Average Day Id Label Elevation Hydraulic Grade Pressure (psi) Demand J-,7., J-,68.7, J-,9., J-,., J-6,., J-7,9., J-8,6., J-9,.9, J-0,., J-,.6, J-,., J-,.7, J-,0.8, J-,8.7, J-6,6.6, J-7,8., J-8,., J-9,9., J-0,7.8, Page of
17 Active Scenario: Average Day Id Label Elevation Hydraulic Grade Pressure (psi) Demand 60 J-,9., J-,66., J-,6.8, J-,6.9, J-,9.0, J-6,., J-7,., J-8,0., J-9,0., J-0,., J-,0., J-,., J-,8.6, J-,6., J-,.6, J-6,., J-7,0., J-8,7., J-9,., Page of
18 Active Scenario: Average Day Id Label Elevation Hydraulic Grade Pressure (psi) Demand 0 J-0,.0, J-,8.6, J-,0.9, J-,6., J-,9.6, J-,6., J-6,70.0, J-7,69., J-8,70., J-9,., J-0,6., J-,8., J-,., J-,8.8, J-,.6, J-,9., J-6,9.0, J-7,.0, J-8,6., Page of
19 Active Scenario: Average Day Id Label Elevation Hydraulic Grade Pressure (psi) Demand 6 J-9,.7, J-60,., J-6,9.7, J-6,., J-6,7.7, J-6,6.6, Page of
20 Active Scenario: Average Day Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss 6 P-,08 : J- : J- 6.0 Ductile Iron P-,0 : J- 7: J- 6.0 Ductile Iron P-,000 7: J- 9: J-6.0 PVC P- 8 9: J-6 : J-7.0 PVC P-6 9 : J- : J PVC P-7 9 : J-8 : J PVC P-8 89 : J-9 7: J PVC P-9 7: J-0 9: J- 8.0 PVC P-0 6 9: J- : J- 8.0 PVC P- 98 : J- 9: J PVC P- 99 : J-9 : J- 8.0 PVC P- : J- 6: J- 8.0 PVC P- 6 6: J- 8: J- 8.0 PVC P- 9 8: J- 0: J PVC P : J-6 : J PVC P-7 60 : J-7 : J PVC P-8 67 : J-8 6: J PVC P : J-9 8: J PVC P-0 0 8: J-0 60: J- 8.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
21 Active Scenario: Average Day Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss 6 P- 6 6: J- 6: J- 8.0 PVC P- 7 6: J- 6: J- 8.0 PVC P- 8 6: J- 67: J- 8.0 PVC P- 8 6: J- : J- 8.0 PVC P : J- 6: J- 8.0 PVC P : J- 8: J- 8.0 PVC P : J- 7: J PVC P-9 8 7: J-6 7: J PVC P-0 7: J-7 77: J PVC P- 8 77: J-8 79: J PVC P- 0 79: J-9 8: J PVC P- 8 8: J-0 8: J- 8.0 PVC P- 67 8: J- 79: J PVC P- 8: J-0 8: J PVC P-6 0 8: J-0 8: J- 8.0 PVC P : J- : J- 8.0 PVC P-8 8 : J- 89: J- 8.0 PVC P : J- 9: J- 8.0 PVC P : J- 9: J- 8.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
22 Active Scenario: Average Day Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss 96 P- 8 9: J- 9: J- 8.0 PVC P- 70 9: J- 97: J PVC P- 0 97: J-6 99: J PVC P- 9 99: J-7 0: J PVC P- 6 9: J- 0: J PVC P : J-9 0: J PVC P : J-0 07: J- 8.0 PVC P : J- 99: J PVC P : J-9 0: J- 8.0 PVC P : J- : J- 8.0 PVC P- 70 : J- : J- 8.0 PVC P- : J- 6: J- 8.0 PVC P- 7 8: J-6 0: J PVC P- 69 0: J-7 : J PVC P-7 78 : J-9 0: J PVC P-8 87 : J-8 6: J- 8.0 PVC P-9 6 6: J- 8: J PVC P-60 : J- 0: J PVC P-6 88 : J-9 : J- 8.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
23 Active Scenario: Average Day Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss P-6 : J- : J PVC P : J- : J PVC P-6 8 : J-9 : J PVC P-67 7: J-6 7: J- 8.0 PVC P : J-7 7: J PVC P : J-8 9: J- 8.0 PVC P : J-6 : J- 8.0 PVC P-7 6 : J- : J- 8.0 PVC P-7 69 : J- : J- 8.0 PVC P-7 90 : J- 7: J- 8.0 PVC P : J- : J PVC P-7 6 7: J- 0: J PVC P : J-6 : J PVC P : J- : J PVC P : J-8 6: J PVC P : J- : J PVC P : J- : J- 8.0 PVC P-8 6 9: J- : J- 8.0 PVC P : J- 9: J- 8.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
24 Active Scenario: Average Day Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss 6 P-8 8 9: J- : J- 8.0 PVC P-8 00 : J- 0: J PVC P-8 6 6: R- : J- 6.0 Ductile Iron P : J- 7: J PVC P-88 7: J-60 0: J PVC P-89 6 : J-7 76: J PVC P : J-6 : J PVC P-9 9 6: J-9 79: J PVC P : J-6 : J PVC P-9 6: J- 8: J PVC P : J-6 8: J PVC P-9 8 : J-8 8: J PVC P : J-6 : J PVC P : R- : J-.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
25 Active Scenario: Max Day Id Label Elevation Hydraulic Grade Pressure (psi) Demand J-,7., J-,68.7, J-,9., J-,., J-6,., J-7,9., J-8,6., J-9,.9, J-0,., J-,.6, J-,., J-,.7, J-,0.8, J-,8.7, J-6,6.6, J-7,8., J-8,., J-9,9., J-0,7.8, Page of
26 Active Scenario: Max Day Id Label Elevation Hydraulic Grade Pressure (psi) Demand 60 J-,9., J-,66., J-,6.8, J-,6.9, J-,9.0, J-6,., J-7,., J-8,0., J-9,0., J-0,., J-,0., J-,., J-,8.6, J-,6., J-,.6, J-6,., J-7,0., J-8,7., J-9,., Page of
27 Active Scenario: Max Day Id Label Elevation Hydraulic Grade Pressure (psi) Demand 0 J-0,.0, J-,8.6, J-,0.9, J-,6., J-,9.6, J-,6., J-6,70.0, J-7,69., J-8,70., J-9,., J-0,6., J-,8., J-,., J-,8.8, J-,.6, J-,9., J-6,9.0, J-7,.0, J-8,6., Page of
28 Active Scenario: Max Day Id Label Elevation Hydraulic Grade Pressure (psi) Demand 6 J-9,.7, J-60,., J-6,9.7, J-6,., J-6,7.7, J-6,6.6, Page of
29 Active Scenario: Max Day Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss 6 P-,08 : J- : J- 6.0 Ductile Iron P-,0 : J- 7: J- 6.0 Ductile Iron P-,000 7: J- 9: J-6.0 PVC P- 8 9: J-6 : J-7.0 PVC P-6 9 : J- : J PVC P-7 9 : J-8 : J PVC P-8 89 : J-9 7: J PVC P-9 7: J-0 9: J- 8.0 PVC P-0 6 9: J- : J- 8.0 PVC P- 98 : J- 9: J PVC P- 99 : J-9 : J- 8.0 PVC P- : J- 6: J- 8.0 PVC P- 6 6: J- 8: J- 8.0 PVC P- 9 8: J- 0: J PVC P : J-6 : J PVC P-7 60 : J-7 : J PVC P-8 67 : J-8 6: J PVC P : J-9 8: J PVC P-0 0 8: J-0 60: J- 8.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
30 Active Scenario: Max Day Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss 6 P- 6 6: J- 6: J- 8.0 PVC P- 7 6: J- 6: J- 8.0 PVC P- 8 6: J- 67: J- 8.0 PVC P- 8 6: J- : J- 8.0 PVC P : J- 6: J- 8.0 PVC P : J- 8: J- 8.0 PVC P : J- 7: J PVC P-9 8 7: J-6 7: J PVC P-0 7: J-7 77: J PVC P- 8 77: J-8 79: J PVC P- 0 79: J-9 8: J PVC P- 8 8: J-0 8: J- 8.0 PVC P- 67 8: J- 79: J PVC P- 8: J-0 8: J PVC P-6 0 8: J-0 8: J- 8.0 PVC P : J- : J- 8.0 PVC P-8 8 : J- 89: J- 8.0 PVC P : J- 9: J- 8.0 PVC P : J- 9: J- 8.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
31 Active Scenario: Max Day Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss 96 P- 8 9: J- 9: J- 8.0 PVC P- 70 9: J- 97: J PVC P- 0 97: J-6 99: J PVC P- 9 99: J-7 0: J PVC P- 6 9: J- 0: J PVC P : J-9 0: J PVC P : J-0 07: J- 8.0 PVC P : J- 99: J PVC P : J-9 0: J- 8.0 PVC P : J- : J- 8.0 PVC P- 70 : J- : J- 8.0 PVC P- : J- 6: J- 8.0 PVC P- 7 8: J-6 0: J PVC P- 69 0: J-7 : J PVC P-7 78 : J-9 0: J PVC P-8 87 : J-8 6: J- 8.0 PVC P-9 6 6: J- 8: J PVC P-60 : J- 0: J PVC P-6 88 : J-9 : J- 8.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
32 Active Scenario: Max Day Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss P-6 : J- : J PVC P : J- : J PVC P-6 8 : J-9 : J PVC P-67 7: J-6 7: J- 8.0 PVC P : J-7 7: J PVC P : J-8 9: J- 8.0 PVC P : J-6 : J- 8.0 PVC P-7 6 : J- : J- 8.0 PVC P-7 69 : J- : J- 8.0 PVC P-7 90 : J- 7: J- 8.0 PVC P : J- : J PVC P-7 6 7: J- 0: J PVC P : J-6 : J PVC P : J- : J PVC P : J-8 6: J PVC P : J- : J PVC P : J- : J- 8.0 PVC P-8 6 9: J- : J- 8.0 PVC P : J- 9: J- 8.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
33 Active Scenario: Max Day Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss 6 P-8 8 9: J- : J- 8.0 PVC P-8 00 : J- 0: J PVC P-8 6 6: R- : J- 6.0 Ductile Iron P : J- 7: J PVC P-88 7: J-60 0: J PVC P-89 6 : J-7 76: J PVC P : J-6 : J PVC P-9 9 6: J-9 79: J PVC P : J-6 : J PVC P-9 6: J- 8: J PVC P : J-6 8: J PVC P-9 8 : J-8 8: J PVC P : J-6 : J PVC P : R- : J-.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
34 Active Scenario: Peak Hour Id Label Elevation Hydraulic Grade Pressure (psi) Demand J-,7., J-,68.7, J-,9., J-,., J-6,., J-7,9., J-8,6., J-9,.9, J-0,., J-,.6, J-,., J-,.7, J-,0.8, J-,8.7, J-6,6.6, J-7,8., J-8,., J-9,9., J-0,7.8, Page of
35 Active Scenario: Peak Hour Id Label Elevation Hydraulic Grade Pressure (psi) Demand 60 J-,9., J-,66., J-,6.8, J-,6.9, J-,9.0, J-6,., J-7,., J-8,0., J-9,0., J-0,., J-,0., J-,., J-,8.6, J-,6., J-,.6, J-6,., J-7,0., J-8,7., J-9,., Page of
36 Active Scenario: Peak Hour Id Label Elevation Hydraulic Grade Pressure (psi) Demand 0 J-0,.0, J-,8.6, J-,0.9, J-,6., J-,9.6, J-,6., J-6,70.0, J-7,69., J-8,70., J-9,., J-0,6., J-,8., J-,., J-,8.8, J-,.6, J-,9., J-6,9.0, J-7,.0, J-8,6., Page of
37 Active Scenario: Peak Hour Id Label Elevation Hydraulic Grade Pressure (psi) Demand 6 J-9,.7, J-60,., J-6,9.7, J-6,., J-6,7.7, J-6,6.6, Page of
38 Active Scenario: Peak Hour Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss 6 P-,08 : J- : J- 6.0 Ductile Iron P-,0 : J- 7: J- 6.0 Ductile Iron P-,000 7: J- 9: J-6.0 PVC P- 8 9: J-6 : J-7.0 PVC P-6 9 : J- : J PVC P-7 9 : J-8 : J PVC P-8 89 : J-9 7: J PVC P-9 7: J-0 9: J- 8.0 PVC P-0 6 9: J- : J- 8.0 PVC P- 98 : J- 9: J PVC P- 99 : J-9 : J- 8.0 PVC P- : J- 6: J- 8.0 PVC P- 6 6: J- 8: J- 8.0 PVC P- 9 8: J- 0: J PVC P : J-6 : J PVC P-7 60 : J-7 : J PVC P-8 67 : J-8 6: J PVC P : J-9 8: J PVC P-0 0 8: J-0 60: J- 8.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
39 Active Scenario: Peak Hour Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss 6 P- 6 6: J- 6: J- 8.0 PVC P- 7 6: J- 6: J- 8.0 PVC P- 8 6: J- 67: J- 8.0 PVC P- 8 6: J- : J- 8.0 PVC P : J- 6: J- 8.0 PVC P : J- 8: J- 8.0 PVC P : J- 7: J PVC P-9 8 7: J-6 7: J PVC P-0 7: J-7 77: J PVC P- 8 77: J-8 79: J PVC P- 0 79: J-9 8: J PVC P- 8 8: J-0 8: J- 8.0 PVC P- 67 8: J- 79: J PVC P- 8: J-0 8: J PVC P-6 0 8: J-0 8: J- 8.0 PVC P : J- : J- 8.0 PVC P-8 8 : J- 89: J- 8.0 PVC P : J- 9: J- 8.0 PVC P : J- 9: J- 8.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
40 Active Scenario: Peak Hour Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss 96 P- 8 9: J- 9: J- 8.0 PVC P- 70 9: J- 97: J PVC P- 0 97: J-6 99: J PVC P- 9 99: J-7 0: J PVC P- 6 9: J- 0: J PVC P : J-9 0: J PVC P : J-0 07: J- 8.0 PVC P : J- 99: J PVC P : J-9 0: J- 8.0 PVC P : J- : J- 8.0 PVC P- 70 : J- : J- 8.0 PVC P- : J- 6: J- 8.0 PVC P- 7 8: J-6 0: J PVC P- 69 0: J-7 : J PVC P-7 78 : J-9 0: J PVC P-8 87 : J-8 6: J- 8.0 PVC P-9 6 6: J- 8: J PVC P-60 : J- 0: J PVC P-6 88 : J-9 : J- 8.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
41 Active Scenario: Peak Hour Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss P-6 : J- : J PVC P : J- : J PVC P-6 8 : J-9 : J PVC P-67 7: J-6 7: J- 8.0 PVC P : J-7 7: J PVC P : J-8 9: J- 8.0 PVC P : J-6 : J- 8.0 PVC P-7 6 : J- : J- 8.0 PVC P-7 69 : J- : J- 8.0 PVC P-7 90 : J- 7: J- 8.0 PVC P : J- : J PVC P-7 6 7: J- 0: J PVC P : J-6 : J PVC P : J- : J PVC P : J-8 6: J PVC P : J- : J PVC P : J- : J- 8.0 PVC P-8 6 9: J- : J- 8.0 PVC P : J- 9: J- 8.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
42 Active Scenario: Peak Hour Id Label Scaled Length Start Node Stop Node Diameter (in) Material Hazen- Williams C Minor Loss 6 P-8 8 9: J- : J- 8.0 PVC P-8 00 : J- 0: J PVC P-8 6 6: R- : J- 6.0 Ductile Iron , P : J- 7: J PVC P-88 7: J-60 0: J PVC P-89 6 : J-7 76: J PVC P : J-6 : J PVC P-9 9 6: J-9 79: J PVC P : J-6 : J PVC P-9 6: J- 8: J PVC P : J-6 8: J PVC P-9 8 : J-8 8: J PVC P : J-6 : J PVC P : R- : J-.0 PVC Flow Velocity (ft/s) Headloss Gradient (ft/ft) Page of
43 Active Scenario: Max Day Plus Fire Label Satisfies Fire Flow Constraints? Fire Flow (Needed) Fire Flow (Available) Flow (Total Needed) Flow (Total Available) Pressure (Calculated Residual Lower Limit) (psi) Pressure (Zone Lower Limit) (psi) Junction w/minimum Pressure (Zone) Junction w/minimum Pressure (System) Is Fire Flow Run Balanced? Velocity of Maximum Pipe (ft/s) J- True,00.00,77.07,7.7, : J-6 8: J-6 True 6.0 J- True,00.00,77.07,7.7, : J-6 8: J-6 True. J- True,00.00,8.00,00.00, : J-6 8: J-6 True.7 J- True,00.00,8.00,00.00, : J-6 8: J-6 True.6 J-6 True,00.00,8.00,00.00, : J-6 8: J-6 True.69 J-7 True,00.00,8.00,00.00, : J-6 8: J-6 True.87 J-8 True,00.00,8.87,00.00, : J-6 8: J-6 True.0 J-9 True,00.00,8.00,00.00, : J-6 8: J-6 True 7.8 J-0 True,00.00,8.68,0., : J-6 8: J-6 True 7.0 J- True,00.00,89.6,.0, : J-6 8: J-6 True 6.9 J- True,00.00,8.00,00.00, : J-6 8: J-6 True 6.6 J- True,00.00,909.0,08.0, : J- 6: J- True.0 J- True,00.00,80.9,09.0, : J- 6: J- True 7.08 J- True,00.00,89.6,.0, : J- 6: J- True 7.0 J-6 True,00.00,80.0,0., : J- 6: J- True 7.0 J-7 True,00.00,89.,8.0, : J-6 76: J-6 True.0 J-8 True,00.00,9.7,.8, : J-6 76: J-6 True.0 Page of
44 Active Scenario: Max Day Plus Fire Label Satisfies Fire Flow Constraints? Fire Flow (Needed) Fire Flow (Available) Flow (Total Needed) Flow (Total Available) Pressure (Calculated Residual Lower Limit) (psi) Pressure (Zone Lower Limit) (psi) Junction w/minimum Pressure (Zone) Junction w/minimum Pressure (System) Is Fire Flow Run Balanced? Velocity of Maximum Pipe (ft/s) J-9 True,00.00,8.77,., : J-6 76: J-6 True 6.9 J-0 True,00.00,77.9,9., : J-6 76: J-6 True.0 J- True,00.00,77.8,06.90, : J-6 8: J-6 True.0 J- True,00.00,70.,0.60, : J- 6: J- True.0 J- True,00.00,80.9,09.0, : J- 6: J- True 7.09 J- True,00.00,80.0,0., : J- 6: J- True 7.08 J- True,00.00,89.6,.0, : J- 6: J- True 7.06 J-6 True,00.00,8.,0.60, : J-6 8: J-6 True 7.0 J-7 True,00.00,80.9,08.0, : J-6 8: J-6 True 6.96 J-8 True,00.00,88.7,.80, : J-6 8: J-6 True 6.89 J-9 True,00.00,87.8,6.0, : J-6 8: J-6 True 6.79 J-0 True,00.00,87.,7., : J-6 8: J-6 True 6.77 J- True,00.00,8.,.00, : J-6 8: J-6 True 6.77 J- True,00.00,80.9,09.0, : J-6 8: J-6 True 6. J- True,00.00,80.9,09.0, : J-6 8: J-6 True 6.6 J- True,00.00,80.0,0., : J-6 8: J-6 True 6.9 J- True,00.00,88.9,.9, : J-6 8: J-6 True 6. Page of
45 Active Scenario: Max Day Plus Fire Label Satisfies Fire Flow Constraints? Fire Flow (Needed) Fire Flow (Available) Flow (Total Needed) Flow (Total Available) Pressure (Calculated Residual Lower Limit) (psi) Pressure (Zone Lower Limit) (psi) Junction w/minimum Pressure (Zone) Junction w/minimum Pressure (System) Is Fire Flow Run Balanced? Velocity of Maximum Pipe (ft/s) J-6 True,00.00,86.97,8.0, : J-6 8: J-6 True 6. J-7 True,00.00,89.6,.0, : J-6 8: J-6 True 6.6 J-8 True,00.00,76.67,08.0, : J-6 8: J-6 True.0 J-9 True,00.00,89.7,.6, : J-6 8: J-6 True 7.00 J-0 True,00.00,80.9,08.0, : J-6 8: J-6 True 6.9 J- True,00.00,80.0,0., : J-6 8: J-6 True 6.6 J- True,00.00,88.7,.80, : J-6 8: J-6 True 7. J- True,00.00,80.0,0., : J-6 8: J-6 True 7.8 J- True,00.00,80.9,08.0, : J-6 8: J-6 True 7. J- True,00.00,80.0,0., : J-6 8: J-6 True 7. J-6 True,00.00,80.9,09.0, : J-6 8: J-6 True 7.9 J-7 True,00.00,89.6,.0, : J-6 8: J-6 True 7. J-8 True,00.00,89.7,.6, : J-6 8: J-6 True 7.9 J-9 True,00.00,89.7,.6, : J-6 8: J-6 True 7. J-0 True,00.00,70.,0.60, : J-6 8: J-6 True.0 J- True,00.00,78.97,0.7, : J-6 8: J-6 True.0 J- True,00.00,87.,7., : J-6 8: J-6 True 6.9 Page of
46 Active Scenario: Max Day Plus Fire Label Satisfies Fire Flow Constraints? Fire Flow (Needed) Fire Flow (Available) Flow (Total Needed) Flow (Total Available) Pressure (Calculated Residual Lower Limit) (psi) Pressure (Zone Lower Limit) (psi) Junction w/minimum Pressure (Zone) Junction w/minimum Pressure (System) Is Fire Flow Run Balanced? Velocity of Maximum Pipe (ft/s) J- True,00.00,87.8,6.0, : J-6 8: J-6 True 6.7 J- True,00.00,80.0,0., : J-6 8: J-6 True 6. J- True,00.00,80.9,08.0, : J-6 8: J-6 True 6. J-6 True,00.00,8.,0.60, : J-6 8: J-6 True 6. J-7 True,00.00,7.7,0., : J-6 8: J-6 True.0 J-8 True,00.00,89.6,.0, : J-6 8: J-6 True 6.7 J-9 True,00.00,78.97,0.7, : J-6 8: J-6 True.0 J-60 True,00.00,80.0,0., : J- 6: J- True 7.0 J-6 True,00.00,880.6,.8, : J-8 : J-8 True.0 J-6 True,00.00,80.0,0., : J-6 76: J-6 True 7. J-6 True,00.00,87.8,6.0, : J-6 8: J-6 True 7. J-6 True,00.00,80.9,09.0, : J-8 : J-8 True 7. Page of
47 APPENDIX C Sanitary Sewer Sanitary Demands and Flows t 0.6. f West nd Avenue, Denver, Colorado 80
48 Job No. 0 Sanitary Sewer Demands for Willow Bend Willow Bend Sanitary Sewer Calculations 0/0/0 :9 PM City of Thornton Standards low density (less than DU/acre). people / unit mid density ( to DU/ acre). people / unit high density (more than DU/acre).0 people / unit Residential average demand: 80 gal / person / day Commercial average demand: 600 gal / acre DU = dwelling units Willow Bend Subdivision Planning Area Land Use: DU (AC. for School) People / Unit No. of People Average Demand (gal/person/day) Average Flow (gpd) Average Flow Average Flow (cfs) Used Peaking Factor SFD , , 0. SFD , ,0 0.9 A School , ,7 0.0 SFD , , Offsite MFD , ,0 0. Design Peak flow (q) (cfs) Pipe Size (in) Full Flow Capacity Minimum Pipe Slope (%) Q cap. (cfs) (%) % 0.0% % % 0.0% % % 0.0% % % 0.0% % % 0.0% % % 0.0% % 7. 0% 0.0%.6..7% Peak Flow (gpd) Peak Flow (cfs) Total=, , 0.8 Q full (cfs) q/q full (%). Dwelling units based on 0.9 AC. of DU/AC and 0.9 AC of 8 DU/AC.. Pipes smaller than " are designed with no more than 0% maximum flow (q/q) per 0 City of Thornton Standards and Specs. Page of 0-Sewer Demands Willow Bend.xlsx
49 Channel Report Hydraflow Express Extension for Autodesk AutoCAD Civil D by Autodesk, Inc. Friday, Oct inch Sanitary Sewer Circular Diameter = 0.67 Invert Elev =.00 Slope (%) = 0.0 N-Value = 0.00 Calculations Compute by: Known Q Known Q (cfs) = 0. Highlighted Depth = 0.9 Q (cfs) = 0.0 Area (sqft) = 0. Velocity (ft/s) =.9 Wetted Perim = 0.96 Crit Depth, Yc = 0. Top Width = 0.66 EGL = 0. Elev.00 Section Reach
50 Channel Report Hydraflow Express Extension for Autodesk AutoCAD Civil D by Autodesk, Inc. Friday, Oct 0 0 inch Sanitary Sewer Circular Diameter =.00 Invert Elev =.00 Slope (%) = 0.0 N-Value = 0.00 Calculations Compute by: Known Q Known Q (cfs) =.6 Highlighted Depth = 0. Q (cfs) =.60 Area (sqft) = 0. Velocity (ft/s) =.87 Wetted Perim =. Crit Depth, Yc = 0.8 Top Width = 0.99 EGL = 0.66 Elev Section Depth Reach
51 APPENDIX D Plans Overall Utility Plan t 0.6. f West nd Avenue, Denver, Colorado 80
52
Request Conditional Use Permit (Tattoo Parlor) Staff Planner Kevin Kemp
Applicant Property Owner Dam Neck Square, LLC Public Hearing March 9, 2016 City Council Election District Beach Agenda Item 2 Request Conditional Use Permit (Tattoo Parlor) Staff Planner Kevin Kemp Location
More information13 February 9, 2011 Public Hearing APPLICANT:
13 February 9, 2011 Public Hearing APPLICANT: STAIN STUDIOS, LLC PROPERTY OWNER: MERITAGE- WITCHDUCK, LLC REQUEST: Conditional Use Permit (tattoo studio) STAFF PLANNER: Karen Prochilo ADDRESS / DESCRIPTION:
More informationRequests Rezoning (B-1 Neighborhood Business to B-2 Community) Conditional Use Permit (Tattoo Parlor) Staff Planner Carolyn A.K.
Applicant Hardee Realty Corporation/Folk City Tattoo, LLC Property Owner Hardee Realty Corporation Public Hearing April 13, 2016 City Council Election District Rose Hall Agenda Items 10/11 Requests Rezoning
More informationConditional Use Permit case no. CU13-07: Arsenal Tattoo
PLANNING AND ZONING COMMISSION STAFF REPORT August 1, 2013 Conditional Use Permit case no. CU13-07: Arsenal Tattoo CASE DESCRIPTION: LOCATION: LEGAL DESCRIPTION: EXISTING LAND USE: APPLICANT(S): STAFF
More information2 December 9, 2015 Public Hearing
2 December 9, 2015 Public Hearing APPLICANT: PROPERTY OWNER: MAGNATE PROP, LLC STAFF PLANNER: Carolyn A.K. Smith REQUEST: Conditional Use Permit (Vocational School & Tattoo Parlor) ADDRESS / DESCRIPTION:
More informationExisting Transportation Conditions Report
FINAL Existing Transportation Conditions Report I-70 & Kipling Interchange PEL Study W RIDGE RD KIPLING ST W 50TH AVE 70 W 44TH AVE MILLER ST 391 I-70 & Kipling Interchange PEL Study May 2012 Existing
More informationRequest Conditional Use Permit (Tattoo Parlor) Staff Planner Jimmy McNamara
Applicant Property Owner Act B Partners Public Hearing April 13, 2016 City Council Election District Lynnhaven Agenda Item 7 Request Conditional Use Permit (Tattoo Parlor) Staff Planner Jimmy McNamara
More information12 October 14, 2015 Public Hearing
12 October 14, 2015 Public Hearing APPLICANT: SECOND SHOT, LLC PROPERTY OWNER: ALBERT VINCIGUERRA STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Tattoo Parlor) ADDRESS / DESCRIPTION: 5759 Princess
More informationResearch or experimental laboratory; Office building and/or office for governmental, business, professional or general purpose;
613. Limited Industrial District (LI). Intent. It is the intent of the Limited Industrial District to provide areas for limited industrial purposes which are not significantly objectionable in terms of
More information4 May 12, 2010 Public Hearing APPLICANT: DML DESIGN, LLC T/A GODSPEED TATTOO
4 May 12, 2010 Public Hearing APPLICANT: DML DESIGN, LLC T/A GODSPEED TATTOO PROPERTY OWNER: JETTELLIS, LLC REQUEST: Conditional Use Permit (tattoo studio) STAFF PLANNER: Carolyn A.K. Smith ADDRESS / DESCRIPTION:
More informationRequest Conditional Use Permit (Tattoo Parlor) Staff Recommendation Approval. Staff Planner Robert Davis
Applicant Property Owner Sifen Development Company, Inc. Public Hearing June 13, 2018 City Council Election District Rose Hall Agenda Item 2 Request Conditional Use Permit (Tattoo Parlor) Staff Recommendation
More information20 & 21 January 13, 2010 Public Hearing APPLICANT: KARINPHILLIP, INC
20 & 21 January 13, 2010 Public Hearing APPLICANT: KARINPHILLIP, INC PROPERTY OWNER: PARR PROPERTIES, LLC. STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (I-1 Light Industrial District
More information4 July 8, 2015 Public Hearing
4 July 8, 2015 Public Hearing APPLICANT: STUDIO EVOLVE, LLC PROPERTY OWNER: MT. TRASHMORE OFFICE, LC STAFF PLANNER: Carolyn A.K. Smith REQUEST: Modification of a Conditional Use Permit approved by the
More informationAPPROVAL REVIEW PROCEDURES
Summit County Public Health 1867 West Market Street Akron, Ohio 44313 Phone: (330) 923-4891 Toll-free: 1 (877) 687-0002 Fax: (330) 923-6436 www.scphoh.org APPROVAL REVIEW PROCEDURES Ohio Law requires that
More informationAGENDA. 3. A public hearing regarding a request to allow a Specific Use Permit to allow a Tattoo Studio at 1027 South Velasco Street.
CITY OF ANGLETON, TEXAS PUBLIC NOTICE OF A PLANNING & ZONING COMMISSION MEETING THURSDAY, MAY 3, 2018 @ 12:00 P.M. 120 S. CHENANGO STREET ANGLETON, TEXAS 77515 Notice is hereby given pursuant to V.T.C.A.,
More informationSpecifications for Heater Scarification Asphalt Surface Recycling
Specifications for Heater Scarification Asphalt Surface Recycling Scope The work covered by this specification consists of furnishing all plant, labor, equipment, and materials in performing all operations
More informationSANITARY REQUIREMENTS FOR TATTOO & BODY PIERCING ESTABLISHMENTS
SANITARY REQUIREMENTS FOR TATTOO & BODY PIERCING ESTABLISHMENTS A REGULATION OF THE BOARD OF HEALTH OF THE MAHONING COUNTY GENERAL HEALTH DISTRICT ESTABLISHING REGISTRATION REQUIREMENTS FOR TATTOO & BODY
More informationPUBLIC HEALTH DEPARTMENT
797 Main Street, Suite B, El Centro, CA 92243 BODY ART EVENT ORGANIZERS The Public Health Department, Division of Environmental Health, will work closely with all event organizers to assist them in ensuring
More informationOptimizing Perforating Charge Design
Optimizing Perforating Charge Design for Stimulation Fracturing Unconventional Reservoirs Deep Penetrating (DP) Charges Natural Completions Focused on depth of Penetration Hole size is usually an after
More information5 May 12, 2010 Public Hearing APPLICANT: URBAN X-CHANGE INC
5 May 12, 2010 Public Hearing APPLICANT: URBAN X-CHANGE INC PROPERTY OWNER: LYNNHAVEN CROSSING, LC REQUEST: Conditional Use Permit (tattoo parlor) STAFF PLANNER: Karen Prochilo ADDRESS / DESCRIPTION: 829
More informationNew Memorandum of Understanding for Kipling Station Redevelopment. Government Management Committee. P:\2016\Internal Services\RE\Gm16029re (AFS 22876)
GM13.20 STAFF REPORT ACTION REQUIRED New Memorandum of Understanding for Kipling Station Redevelopment Date: May 30, 2016 To: From: Wards: Reference Number: Government Management Committee Chief Corporate
More informationNortheast Health District
Northeast Health District Body Tattoo/Body Piercing Establishment Plan Review Date: Type of Establishment: (circle one) Tattooing Piercing Both Are you a: (circle one) New Existing Existing with new ownership
More informationAPPLICATION FOR BODY ART FACILITY PLAN REVIEW
APPLICATION FOR BODY ART FACILITY PLAN REVIEW The Kern County Public Health Services Department, Environmental Health Division shall issue a health permit for a body art facility after an investigation
More informationApplication for Tattoo / Body Piercing Establishment License Please print legibly in ink or type application.
United City of Yorkville 800 Game Farm Road Yorkville, Illinois 60560 630-553-4350 Application for Tattoo / Body Piercing Establishment License License Term January 1 through December 31 Application Fee
More informationSANITARY REQUIREMENTS FOR TATTOO & BODY PIERCING ESTABLISHMENTS
SANITARY REQUIREMENTS FOR TATTOO & BODY PIERCING ESTABLISHMENTS A REGULATION OF THE BOARD OF HEALTH OF THE MAHONING COUNTY GENERAL HEALTH DISTRICT ESTABLISHING REGISTRATION REQUIREMENTS FOR TATTOO & BODY
More informationBODY ART FACILITY CONSTRUCTION PLAN CHECK
BODY ART FACILITY CONSTRUCTION PLAN CHECK Type of Facility: (mark one) Permanent Temporary/Special Event Are you a: (mark one) New Facility Existing with new ownership Existing Facility Existing remodel
More informationPLAN REVIEW APPLICATION PACKET BODY ART ESTABLISHMENTS
PLAN REVIEW APPLICATION PACKET BODY ART ESTABLISHMENTS Greene County Public Health 360 Wilson Drive Xenia, OH 45385 (937) 374-5600 / (937) 374-5607 www.gcph.info Submit completed plan review packet, Infection
More informationTABLE OF CONTENTS. CHAPTER 1 Board of Health... 2 & 3. CHAPTER 2 Subdivision Approval...4. Chapter 3 Disposal of Sanitary Sewage...
TABLE OF CONTENTS CHAPTER 1 Board of Health............. 2 & 3 CHAPTER 2 Subdivision Approval..............4 Chapter 3 Disposal of Sanitary Sewage....... 5 12 Chapter 4 Floor Drain............... 13-16
More information7 December 12, 2012 Public Hearing APPLICANT:
7 December 12, 2012 Public Hearing APPLICANT: URBAN X-CHANGE II, INC. PROPERTY OWNER: LYNNHAVEN MALL, L.L.C. REQUEST: Conditional Use Permit (Tattoo Studio) STAFF PLANNER: Kristine Gay ADDRESS / DESCRIPTION:
More informationZoning Board of Appeals Meeting Minutes Village of Norridge Roll Call: Approval of Minutes - Motion MOTION CARRIED Update on Future Cases
Zoning Board of Appeals Meeting Minutes Village of Norridge The Zoning Board of Appeals of the Village of Norridge, Cook County, Illinois Convened on the 1 st day of May, 2017, 7:00 P.M. at its regular
More informationCommunity Development Department Council Chambers, 7:30 PM, November 1, 2018
STAFF REPORT 2018-40P: Special Use Permit Community Development Department Council Chambers, 7:30 PM, November 1, 2018 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Mike Voitik, Planning Technician
More informationCITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA
CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: FROM: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL SCOTT CHARNEY DIRECTOR OF COMMUNITY DEVELOPMENT SUBJECT: CONTINUED
More informationBODY ART FACILITY PLAN REVIEW OVERVIEW
BODY ART FACILITY PLAN REVIEW OVERVIEW The City of Pasadena Public Health Department, Environmental Health Division shall issue a health permit for a body art facility after an investigation has determined
More informationVillage of Geneseo Zoning Board of Appeals Hearing Ronald J. Aprile 6 Wadsworth Street Tax Map ID #: January 05, 2010, 4:30 p.m.
Village of Geneseo Zoning Board of Appeals Hearing Ronald J. Aprile 6 Wadsworth Street Tax Map ID #: 80.12-3-55 January 05, 2010, 4:30 p.m. Present: Chair Carolyn Meisel Gail Dorr Paul Schmied Thomas Wilson
More informationHair Entanglement/Entrapment Testing. ASME-A Suction Covers. Human Subjects and Wigs
Hair Entanglement/Entrapment Testing of ASME-A112.19.8 Suction Covers using Human Subjects and Wigs for Mr. Leif Zars Gary Pools February 24, 2003 Bryant-Lee Associates Project No.: BL02232 Prepared by:
More informationCOUNTY OF SACRAMENTO STORM DRAIN STENCILING PROGRAM PROJECT APPLICATION
COUNTY OF SACRAMENTO STORM DRAIN STENCILING PROGRAM PROJECT APPLICATION Submit your completed application form to: County of Sacramento Water Resources Division Attn: Storm Drain Stenciling Program 827
More informationPermanent Body Art Facility Plan Review Application
Permanent Body Art Facility Plan Review Application Livingston County Health Department 2300 East Grand River Suite 102, Howell, MI 48843 Ph:517-546-9858 Fx:517-546-9853 www.lchd.org Authority - Michigan
More informationOBIS Galaxy. Fiber Input, Fiber Output, Eight Channel Beam Combiner FEATURES
Fiber Input, Fiber Output, Eight Channel Beam Combiner is a revolutionary design in laser technology, offering plug-and-play capabilities in laser beam combining. The is equipped with eight FC fiber inputs,
More informationINSTALLATION AND ROUGH-IN INFORMATION
INSTALLATION AND ROUGH-IN INFORMATION IMPORTANT - This sheet MUST accompany each Installation Drawing IMPORTANT: Echo / Vantage or Echo Plus / Vantage Plus Pedicure Chairs MUST be installed by a licensed
More informationNW Bicester Masterplan. Access and Travel Strategy Appendix 7 Traffic Impact
NW Bicester Masterplan Access and Travel Strategy Appendix 7 Traffic Impact Hyder Consulting (UK) Limited 2212959 HCL House Fortran Road St Mellons Business Park St Mellons Cardiff CF3 0EY United Kingdom
More informationFIBER OPTIC IRONING DIODE LASER EPILATION!
THE LATEST TECHNOLOGY AT IRONING DIODE LASER FCD FIBER OPTIC IRONING DIODE LASER EPILATION! ICE HANDLE TOTAL BODY IN THE WORLD S LIGHTEST HANDLE (300gr) average minutes million SHOTS million guarantee
More informationENVIRONMENTAL HEALTH SERVICE REQUEST FORM 2019
Environmental Health Division 1675 W. Garden of the Gods Rd., Suite 2044 Colorado Springs, CO 80907 (719) 578-3199 phone (719) 578-3188 fax www.elpasocountyhealth.org ENVIRONMENTAL HEALTH SERVICE REQUEST
More informationFIBER OPTIC IRONING DIODE LASER EPILASION!
THE LAST TECHNOLOGY IN IRON DIODE LASER FCD FIBER OPTIC IRONING DIODE LASER EPILASION! K142186/878.4810 17.04.2015 ADELA 810 FCD is THE FIRST AND THE ONLY "Ironing Diode Laser Hair Removal Device" in the
More informationPORTAGE COUNTY COMBINED GENERAL HEALTH DISTRICT ENVIRONMENTAL DIVISION 2017 NEW BODY ART ESTABLISHMENT PERMIT TO OPERATE APPLICATION INSTRUCTIONS
PORTAGE COUNTY COMBINED GENERAL HEALTH DISTRICT ENVIRONMENTAL DIVISION 2017 NEW BODY ART ESTABLISHMENT PERMIT TO OPERATE APPLICATION INSTRUCTIONS Ohio Administrative Code (OAC) 3701-9-02(A) In accordance
More informationCode of Practice for Temporary Traffic Management (CoPTTM)
Part 8 of the Traffic Control Devices Manual (TCD Manual) Code of Practice for Temporary Traffic Management (CoPTTM) (CoPTTM) - (SP/M/010) Fourth Edition Technical Note: Revised requirements for high visibility
More informationBODY ART /PIERCING PLAN REVIEW APPLICATION AND GUIDELINES
BODY ART /PIERCING PLAN REVIEW APPLICATION AND GUIDELINES Plan Review Request for a Body Art/Piercing Establishment Instructions 1. Complete the form and attached requested information in plan review packet.
More informationDeputy City Manager and Chief Financial Officer. P:\2007\Internal Services\F&re\Ec07001F&re vb/cn (AFS 3420)
STAFF REPORT ACTION REQUIRED Capital Funding for the Kipling / Islington Redevelopment Initiative Date: December 21, 2006 To: From: Executive Committee Deputy City Manager and Chief Financial Officer Wards:
More informationCANDY CONCENTRATES TECHNICAL DATA SHEET
CANDY CONCENTRATES TECHNICAL DATA SHEET Check local VOC DESCRIPTION Candy Concentrates is a vibrant line of transparent pigments that add spectacular color to custom paint jobs. FEATURES Outstanding depth
More informationPLEASE NOTE: ADDITIONAL DOCUMENTATION ON PAGE 2 MUST BE SUBMITTED WITH THIS APPLICATION. Name Business is Conducted Under (DBA):
BUSINESS FILING AND VERIFICATION SECTION TATTOO STUDIO Initial / Renewal License Application (Health and Safety Code, Chapter 146 Return both the completed application, and nonrefundable check or money
More informationImpact of SB 270 (Reusable bag law) on Recycling and PCR Demand. Cherish Changala, Revolution
Impact of SB 270 (Reusable bag law) on Recycling and PCR Demand Cherish Changala, Revolution Who is Revolution? Product Lines We saw the need to recycle We developed a Collection System Local Ordinances
More informationSash Open Area Module (SOAM)
Sash Open Area Module (SOAM) DXA.S12C The Sash Open Area Module (SOAM) provides advanced sash management for DXR2 and PTEC based Fume Hood Controllers. Sash management for advanced fume hoods with 2-10
More informationPRICE LIST CEMETERY & CREMATORIUM. Effective August 15, 2017 Operated by: The Lindsay Cemetery Corporation Ian Merritt General Manager
CEMETERY & CREMATORIUM PRICE LIST Effective August 15, 2017 Operated by: The Lindsay Cemetery Corporation Ian Merritt General Manager 347 Lindsay St. South, Lindsay, Ontario K9V 4R4 705-324-2431 www.riversidelindsay.com
More informationDEPARTMENT OF DEVELOPMENT SERVICES BOARD OF ADJUSTMENT BRIEFING March 18, 2015
REQUEST: Special exception request to allow a Tattoo Studio to be located within 2,000 feet of another existing Tattoo Studio or Body-Piercing Salon establishment in the Neighborhood Commercial (CN) zoning
More information8-in-1 All Over Grooming Kit
8-in-1 All Over Grooming Kit Model 7056CU 8-in-1 All Over Grooming Kit The BaByliss For Men 8-in-1 All Over Grooming Kit is a professional grade rechargeable trimmer with 4 interchangeable cutting heads
More informationCity State Zip. Model Dress size 6X 10 Height Weight Date of Measurement
Model Application 2016 American Girl Fashion Show Presented by the Junior League of the Lehigh Valley Saturday, March 5, 2016 10 AM & 2 PM Sunday, March 6, 2016 10 AM & 2 PM Model Fee $40 Thank you for
More informationUsing ONYX Separation Control Tool. Contents: What is Separation Control? Using ONYX Separation Control Tool. Separation Control Tips and Tricks
Using ONYX Separation Control Tool Contents: What is Separation Control? Comparison to Basic/Advanced profiling workflow Advantages Using ONYX Separation Control Tool Enabling Separation Control Configuring
More informationBODY ART TEMPORARY EVENT SPONSOR APPLICATION PACKET
BODY ART TEMPORARY EVENT SPONSOR APPLICATION PACKET Attached are instructions for event sponsors and body artist participants. The information should be read carefully. The sponsor must work with the Kern
More informationFrac Talk Laura Schafer 4 March 2016
Frac Talk Laura Schafer 4 March 2016 My Path to Frac Education MS, BSc Chemical Engineering Colorado School of Mines Career Schlumberger 2002 2010 Well Services Manager Fracturing Cementing Coil Tubing
More information29 January Cullinan Grade versus Value Analysis. Background
29 January 2018 Cullinan Grade versus Value Analysis Background Petra s published Business Model states: Petra is focused on value production, rather than volume. Plant processes are set to optimise revenue
More informationOBIS Galaxy Integrated System
OBIS Galaxy Integrated System 8-Wavelength, One Fiber Output Illumination System The flexible and modular design of the OBIS Galaxy Integrated System enables users to combine up to 8 predetermined wavelength
More informationTIME-LIMITED BODY ART/PIERCING APPLICATION AND GUIDELINES
TIME-LIMITED BODY ART/PIERCING APPLICATION AND GUIDELINES Time-Limited Body Art/Piercing Application and Guidelines Licensing Process 1. Read this entire packet. 2. Complete the License Application form.
More informationHERITAGE VAUGHAN REPORT
Item: 3 HERITAGE VAUGHAN REPORT DATE: Wednesday, June 20, 2018 WARD(S): 2 TITLE: NEW CONSTRUCTION DETACHED GARAGE 8006 KIPLING AVENUE, WOODBRIDGE HERITAGE CONSERVATION DISTRICT FROM: Jason Schmidt-Shoukri,
More informationBODY ART ESTABLISHMENT PLANNING APPLICATION
BODY ART ESTABLISHMENT PLANNING APPLICATION Toledo-Lucas County Health Department 635 N. Erie Street Toledo-Lucas Toledo, County OH Health 43604 Phone: (419) 213-4100 Department ext. 3 Fax: (419) 213-4141
More informationDocumentation of Cemeteries and Funerary Offerings from Sites in the Upper Neches River Basin, Anderson, Cherokee, and Smith Counties, Texas
Stephen F. Austin State University SFA ScholarWorks CRHR: Archaeology Center for Regional Heritage Research 2014 Documentation of Cemeteries and Funerary Offerings from Sites in the Upper Neches River
More informationTo foster a city with strong social cohesion, an engaging arts scene, and a clear sense of its culture and heritage.
HERITAGE VAUGHAN COMMITTEE MARCH 20, 2013 8222-8248 KIPLING AVENUE HERITAGE REVIEW OF PROPOSED NEW TOWNHOMES, NEW SINGLE FAMILY HOME, TWO SEMI-DETACHED HOMES AND DEMOLITION OF EXISTING STRUCTURES AT 8222
More informationLIGHTER WEIGHT MORE WARMTH ENHANCED FLEXIBILITY. A New Generation of Flame Resistant Outerwear Fabrics
LIGHTER WEIGHT MORE WARMTH ENHANCED FLEXIBILITY A New Generation of Flame Resistant Outerwear Fabrics LIGHTER WEIGHT MORE WARMTH ENHANCED FLEXIBILITY 3M Thinsulate Insulation FR Quilted to Westex Westex,
More informationGuidelines for organising exhibitions in the Atrium Gallery at LSE
Guidelines for organising exhibitions in the Atrium Gallery at LSE Introduction All administrative and organisational aspects of exhibitions held in the Atrium Gallery, Old Building are the responsibility
More informationCOSMOS-standard. Labelling Guide
Labelling Guide Version 1.1 20 th July 2011 COSMOS-standard AISBL Rue du Commerce 124 1000 Brussels Belgium E: info@cosmos-standard.org W: www.cosmos-standard.org Labelling Guide version 1.1 20 th July
More informationFOUR BRONZE IMPLEMENTS.
FOUR BRONZE IMPLEMENTS 349 FOUR BRONZE IMPLEMENTS. BY EDWIN HOLLIS. The four implements illustrated witli this article have, I believe, not previously been described. Together they form a very interesting
More informationGuidelines for organising exhibitions in the Atrium Gallery at LSE
Guidelines for organising exhibitions in the Atrium Gallery at LSE Introduction All administrative and organisational aspects of exhibitions held in the Atrium Gallery, Old Building are the responsibility
More informationSix Points Interchange Reconfiguration Class Environmental Assessment Study
Six Points Interchange Reconfiguration Class Environmental Assessment Study Toronto, ON October 2007 Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) 882-4100 Fax: (905) 882-1557
More informationBusiness and Development Services. City Council Agenda Item Summary. Zoning Amendment: Tattoo and Body Piercing Studios.
Business and Development Services City Council Agenda Item Summary Zoning Amendment: Tattoo and Body Piercing Studios Staff Contact: Kim Hamel, Director khamel@mauldincitysc.com Meeting Date: April 18,
More informationCalling All Visual Artists & Photographers Exhibitions at McLean Community Centre
Calling All Visual Artists & Photographers 2018 Exhibitions at McLean Community Centre The Town of Ajax offers hanging space at the McLean Community Centre (95 Magill Drive, Ajax) for up to 14 exhibitors
More informationEASTERN KENTUCKY UNIVERSITY HAZARD COMMUNICATION PROGRAM SUMMARY COMPLIANCE MANUAL. Table of Contents
EASTERN KENTUCKY UNIVERSITY HAZARD COMMUNICATION PROGRAM SUMMARY COMPLIANCE MANUAL Table of Contents I. OVERVIEW OF THE HAZARD COMMUNICATION STANDARD A. Background and Scope.................................
More informationAttachment 1 Package SVC-8 Released: Package Summary and Requirements
Package Summary and Requirements Space Identifier Near Gate Proposed Concept Square Footage Term in Years B-2-088C-A01 B28 Spa 754 7 D-2-SC107 D21 Spa 1,259 7 PACKAGE ACDBE/M/WBE Goals: Area Goal Proposed
More informationIt is unlawful to operate a tattoo shop or establishment without first obtaining a license as required by this chapter.
5.70.010 - License required. 5.70.020 - Requirements for building or operator. 5.70.030 - Tattooing procedure regulations. 5.70.040 - Health-related requirements. 5.70.050 - Recordkeeping. 5.70.060 - Unlawful
More informationPRICE LIST CEMETERY & CREMATORIUM. Effective May 1st, 2018 Operated by: The Lindsay Cemetery Corporation Timothy Godfrey General Manager
CEMETERY & CREMATORIUM PRICE LIST Effective May 1st, 2018 Operated by: The Lindsay Cemetery Corporation Timothy Godfrey General Manager 347 Lindsay St. South, Lindsay, Ontario K9V 4R4 705-324-2431 www.riversidelindsay.com
More informationProject Management Network Diagrams Prof. Mauro Mancini
Project Management Network Diagrams Prof. Mauro Mancini e-mail: Mauro.Mancini@polimi.it tel.: +39-02-23994057 POLITECNICO DI MILANO Department of Management, Economics and Industrial Engineering Mauro
More informationCOUNSELLING INFORMATION. 1: TAPER HAIRCUT FULL SERVICE 30 Points. 2: PERMANENT WAVING FULL SERVICE 30 Points
42/08/15/09 (DPN-1) Practical Hairstylist Qualification COUNSELLING INFORMATION 1: TAPER HAIRCUT 30 Points 2: PERMANENT WAVING 30 Points 3: HAIR COLOURING DEMONSTRATION 20 Points 4: LAYERED HAIRCUT 25
More informationRULES OF TENNESSEE BOARD OF COSMETOLOGY AND BARBER EXAMINERS CHAPTER SANITARY REQUIREMENTS TABLE OF CONTENTS
RULES OF TENNESSEE BOARD OF COSMETOLOGY AND BARBER EXAMINERS CHAPTER 0200-03 SANITARY REQUIREMENTS TABLE OF CONTENTS 0200-03-.01 Applicability 0200-03-.02 Violations 0200-03-.03 Location 0200-03-.04 Communicable
More informationAs Introduced. 129th General Assembly Regular Session H. B. No A B I L L
129th General Assembly Regular Session H. B. No. 119 2011-2012 Representatives Combs, Fende Cosponsors: Representatives Garland, Ruhl, Patmon, Stebelton, Letson, Ramos, Murray, Stinziano, Boyd, Uecker,
More informationPTTC/DOE/RPSEA Gas Shales Workshop Marcellus Shale Hydraulic Fracturing
PTTC/DOE/RPSEA Gas Shales Workshop Marcellus Shale Hydraulic Fracturing > Arlington Virginia > September 28 th, 2011 > Jordan Ciezobka - GTI RPSEA Marcellus Gas Shale Project Objective To enhance shale
More informationGet Real. Real Skills. Real Jobs.
Get Real. Real Skills. Real Jobs. www.europeanschoolofesthetics.ca 294 William Avenue, Winnipeg, MB R3B 0R1, Phone: 204-944-8202, Fax: 204-944-8207, Toll Free: #1-877-829-8071, Email: info@europeanschoolofesthetics.ca,
More informationPage 1 of 5 A to Z Index En español Contact Us FAQs About OSHA OSHA Newsletter RSS Feeds Print This Page Text Size Was this page helpful? What's New Offices Home Workers Regulations Enforcement Data &
More informationTextiles. Sector Profile
Textiles Sector Profile India Scenario Overview The Indian textile industry is the 2 nd largest manufacturer and exporter in the world 14.4% share in India s total exports in 2016-17 ` Textiles industry
More informationAs Introduced. 130th General Assembly Regular Session H. B. No A B I L L
130th General Assembly Regular Session H. B. No. 131 2013-2014 Representatives Johnson, Stinziano Cosponsors: Representatives Antonio, Beck, Boyd, Dovilla, Driehaus, Duffey, Fedor, Grossman, Hagan, C.,
More informationHigg.org Platform Update What to Expect: Timeline and Next Steps
Higg.org Platform Update What to Expect: Timeline and Next Steps Sustainable Apparel Coalition 1 Higg.org Platform Transition The Sustainable Apparel Coalition will be updating the Higg Index technology
More informationBODY ART FACILITY PLAN CHECK GUIDELINES
Shasta County Department of Resource Management Environmental Health Division 1855 Placer Street, Suite 201, Redding, CA 96001 Phone: 530/225-5787 Fax: 530/225-5413 www.co.shasta.ca.us BODY ART FACILITY
More informationSWBAT: Describe and Apply the Rule and the standard Normal Distribution. Lesson 2-2 The Rule Although there are many Normal
Do Now: 1. Scott was one of 50 junior boys to take the PSAT at his school. He scored 64 on the Critical Reading test. This placed Scott at the 68th percentile within the group of boys. Looking at all 50
More informationLeeming to Barton Improvement
Start of works exhibition March 2014 Welcome Introduction Following the public inquiry in November 2006, the Secretaries of State for Transport and Communities and Local Government announced the decision
More informationCODE NAME 06 BROWARD 31 INDIAN RIVER 43 MARTIN 50 PALM BEACH 56 ST. JOHN 98 OUT-OF-STATE 99 OUT-OF-COUNTRY
PERQUISITES FORM INSTRUCTIONS **Save a copy of this form to your desktop and type in the appropriate information for each new request** ITEM 1 - UNIVERSITY CODE (Prefilled on Form) CODE - UNIVERSITY FAU
More information7. Prehistoric features and an early medieval enclosure at Coonagh West, Co. Limerick Kate Taylor
7. Prehistoric features and an early medieval enclosure at Coonagh West, Co. Limerick Kate Taylor Illus. 1 Location of the site in Coonagh West, Co. Limerick (based on the Ordnance Survey Ireland map)
More informationOMNI Coupling System. Cast Couplings Straight & Reducing Transitions IMPORTANT LINKS. Description: Cast Couplings
OMNI Coupling System Cast Couplings Straight & Reducing Transitions 441 IMPORTANT LINKS Click appropriate words to go to: Standard Limited Warranty Sales Terms & Conditions Freight Policy Returns Policy
More informationAPPENDIX D. Monitoring Well Abandonment Correspondence with NJDEP:
APPENDIX D Monitoring Well Abandonment Correspondence with NJDEP: July 13, 2016 Memo to NJDEP Re: Recommendations Regarding Monitoring Well Decommissioning April 26, 2016 Letter to NJDEP Re: Request for
More informationSlip Resistance of 3M Nomad Modular Tiles
3 Nomad Modular 8300 & 8900 Entrance matting Slip Resistance of 3M Nomad Modular Tiles Content Friction Test Page 2 Slip Resistance Test DIN 51130 Page 3 Pendulum Test according to BS 7976 Page 5 Conclusion
More informationFor more information or permission to reprint slides, please contact Donna Milligan at 1
For more information or permission to reprint slides, please contact Donna Milligan at milligan@vims.edu 1 For more information or permission to reprint slides, please contact Donna Milligan at milligan@vims.edu
More informationU.S. FACILITIES EXPORTING TREATED HIDES AND SKINS, April
U.S. FACILITIES EXPORTING TREATED HIDES AND SKINS, April 2004-1 - APPROVAL OF FACILITIES TO EXPORT TREATED HIDES AND SKINS OF UNGULATES TO THE EUROPEAN UNION I. PURPOSE The purpose of this article is to:
More informationSTUDDED JEWELLERY / PRECIOUS & SEMI PRECIOUS STONES/OTHER PRECIOUS METALS/ RETAIL PRODUCTS
REQUEST FOR EMPANELMENT OF SUPPLIERS FOR SUPPLY OF STUDDED JEWELLERY / PRECIOUS & SEMI PRECIOUS STONES/OTHER PRECIOUS METALS/ RETAIL PRODUCTS RFE NO. MMTC/PMD/RETAIL/JEWELLERY/AUGUST 2018/02 MMTC Ltd.
More informationLICENSE AGREEMENT FOR MANAGEMENT 3.0 FACILITATORS
AGREEMENT Version 2.01 18 August 2015 LICENSE AGREEMENT FOR MANAGEMENT 3.0 FACILITATORS INTRODUCTION This is an agreement between: Happy Melly One BV Handelsplein 37 3071 PR Rotterdam The Netherlands VAT:
More informationBODY ART FACILITY Plan Check Guide & Application for New Construction/Remodels. Sewage Disposal (public or private):
COUNTY OF SISKIYOU Community Development Department Environmental Health Division 806 South Main Street Yreka, California 96097 (530) 841-2100 Fax (530) 841-4076 www.co.siskiyou.ca.us/page/environmental-health-division
More information