Daily Drilling Report Onshore

Similar documents
1, Total Depth (All) (ftkb) Original Hole - 20, ,929, Wind Temperature ( F) Road Condition

EP WELLS DAILY OPERATIONS REPORT Report 14 05/04/2017

2/4/15 SAU 1220DH WOCS: Aaron Auld Rig: WSI wireline/ rigless

AMERICAN ENERGY - PERMIAN BASIN, LLC Daily Completion Report UNIVERSITY SR HS AEPB WELL NO. 115

Frac Talk Laura Schafer 4 March 2016

Oil & Gas. Simplified Frac Iron System

Optimizing Completion Technology for Eastern European Shales

Optimizing Perforating Charge Design

How to Simplify Your Frac Site. Presented by Firstname Surname, Job Title

JJ Joubert is a Data Architect and unofficially official PPDM advocate at Drilling Info. Currently he is working specifically with Completion data,

PTTC/DOE/RPSEA Gas Shales Workshop Marcellus Shale Hydraulic Fracturing

SPE Copyright 1999, Society of Petroleum Engineers Inc.

FracHOOK TM MULTILATERAL FRACTURING SYSTEM

Frac Manifold Systems. Increase operational efficiencies of simultaneous completion operations

Trends extracted from 1,200 Gulf Coast blowouts during

Operating Instructions

The Evolution of. Hydraulic Fracturing In the Bakken Petroleum System

Tender Notice No. DGVCL/SP/10048/Ind. Safety Shoes, PVC Boot & Rain Coat. Item No. 1 : Specifications of Industrial Safety Shoes

BG1454. BT5 Fleece Hood

Operating Instructions

J COAL HARBOUR Essential Hooded Soft Shell Jacket

At Work Force we take our Mission Seriously: To keep Your Work Force Safe. Every Day. Every Night. In Any Weather Condition.

OMNI Coupling System. Cast Couplings Straight & Reducing Transitions IMPORTANT LINKS. Description: Cast Couplings

Flame Seal-TB General Information and Application Procedures

THUNDER BAY REGIONAL RESEARCH INSTITUTE STATEMENT of POLICY and PROCEDURE Manual: Joint Health & Safety SPP No. JH Section: Issued: May 6, 2011

SAFETY. Rainwear 51 - S372 / S D Safety Rain Wear 52 - SJ05 / SP02 Hi-Vis Packable Rain Wear

Snowplant Collection Workbook

3M TAPED HI VIS CLOSED FRONT SHIRT Long Sleeve BTC M X TAPED HI VIS DRILL SHIRT Long Sleeve BS6156T

10XE AND 15XE Electric High-Pressure Washer

Material properties: Superior breathability Soft and lightweight. Material properties: Strong Breathable Fluid resistant. Spunbonded.

Action Sports Systems Inc. P.O. Box 1442, Morganton, NC 28680

Baseline document for Suspension PVC powder manufacturing. Quality Engineering

PARTS LIST FOR WC-150-0ME3 WATER CANNON. Copyright 2000, Mi-T-M Corporation Issue Date:

Hair Entanglement/Entrapment Testing. ASME-A Suction Covers. Human Subjects and Wigs

PARTS LIST FOR WC-100-0ME3 WATER CANNON. Copyright 2000, Mi-T-M Corporation Issue Date:

MISCELLANEOUS ITEMS F001 HARD PLASTIC CAP RUBBER KNEE PADS T13A KNEE PADS T13A HARD PLASTIC CAP RUBBER FOAM KNEE PADS KNEE PADS

(800) dressamed.com

Australian owned and operated since 1922 Celebrating 95 years

SM - HIGH PRESSURE ALL METAL FLOWMETER AND SWITCH

HEAT STRESS HEAT STRESS IS 100% PREVENTABLE 276 PHASE CHANGE

new products spirit packs

Grays Harbor Unders ULTIMATE BASE LAYERS AND MORE

When purchasing uniforms from the Lands End website, select:

TECHNICAL MONOGRAPH n 2, 7 th Edition Revised March 2017

Owner s Manual. Table of contents 2. Introuduction & Safty Standard 3. Important considerations 4. Identify Parts & Description 5.

BROCK BADGERS UNIVERSITY APPAREL GUIDE. ACCOUNT MANAGER - SAMANTHA RYDER ext. 244

HYDRAULIC COMPONENTS HYDROSTATIC TRANSMISSIONS GEARBOXES - ACCESSORIES HT 12 / A / 352 / 1212 / E

ASX Announcement. Development Update

Sash Open Area Module (SOAM)

Owner s Manual. Maintenance for Pipeless (Sanijet ) 12, 13. Maintenance for Standard Pedicure Spa (Whirlpool Pump) 15, 16

PHOTO ITEM / DESCRIPTION COLOR SIZE PRICE

Description Color Inks Green Blockout Pen Easy to use pen for stencil touchup fast drying and water-soluble

Be Seen HI-VIS SAFETY GEAR

Fit Sample / 1st Submit Cover Page

GAR Labs is a large Skin Care & Hair Care Manufacturer

K-5 ELEMENTARY (GIRLS) 2018

Student Name (First/Last) Pant Prep Husky Mens QTY SIZE TOTAL

Product Information. Fibre Glass and SMC should be dry sanded using European P240 / U.S. 240 grit paper. Not recommended for use over body filler

Cyclone Sand Pro Debris Blower. Parts Catalog. Form Number Model No and up.

(800) dressamed.com 1

SPRING 2018 / DELIVERY 1

PPE Information Sheet Protective Clothing for the Body

American Medi-Serve Mangum

Ramp & Technical Operations Uniform Look Book

Bid Employee Uniforms, Juvenile Uniforms, Bedding, and Practice Rifles for the Juvenile Probation Department Opening Date: March 29, 2018

2019 NEW YEAR SALE FLYER

mmaculata HIGH SCHOOL Spring 2016 Sale! You can t hide that Spartan Pride!

3M Adhesive Remover 6040, 6.25 fl oz, 6 per case, Restricted

Class 2 Flame Retardant Vest. Class 2 Flame Retardant 2-Tone Vest. Class 2 Flame Retardant Breakaway Vest

IMMACULATE CONCEPTION ELEMENTARY SCHOOL, NEWBURY 2010 UNIFORM PRICE LIST. BOYS GRADES PreK - 4

For the Complainant: Susan M. Williams, Esq., Office of the Solicitor, U.S. Department of Labor, Dallas, Texas DECISION AND ORDER

United States Navy League Cadet Corps AVIATION 2015 SEA BAG LIST

CONTENTS SIZING MENS SIZES JUNIOR SIZES WOMENS SIZES SOCK SIZES XS S M L XL 2XL 3XL 4XL 5XL 6XL SB MB LB

Visual Index Click on a picture to view the catalogue page

PRICE LIST ITEM NAME STYLE COLOUR SIZE ITEM CODE PRICE/PCS

How Upfront Labor Costing can affect your Bottom Line. John Stern, Pres, Methods Workshop

1 Rains Lookbook 2014 / 1. Rains Lookbook 2014 / 1

3D Printing Guide: MakerBot Replicator 2X

MADE to MEASURE BLOUSE. Version S12

PRODUCT CATALOG

HORRY COUNTY FIRE RESCUE DEPARTMENT PROUD * PREPARED * PROFESSIONAL STANDARD OPERATING GUIDELINE SOG 406 UNIFORM POLICY

September 2018 Brochure. Fendering Profiles. Designed for the marine environment

TenarisXP Buttress Connection

NEW colors. track & field/cross country

FIRE & ICE HRC2 HRC1 ANSI 107. fire resistant apparel protects you from both FIRE & ICE with all-weather protection.

EMS Standard Operating Procedures Policy Title:

Suspensions. Pinlock Easy to adjust. firm hold. Simply squeeze the buckle tabs to loosen the band and slide to tighten. Ratchet Feature an extra

ACTIVEWEAR BUILT TO PERFORM YOUR TEAM. YOUR GEAR.

FIRE DEPARTMENT EMPLOYEE UNIFORM POLICY. AUTHORED BY: FESSAM # Battalion Chief Starck 7C.1

MEN S DRIFTER PREMIUM LEATHER JACKET

Toll Free

FIRE MAX 3. Next generation protection and wearing comfort.

2016 EVERGLADES BOATS DEALER PRODUCT CATALOG

STERN TUBE SEAL STERN KEEPER C-TYPE MANUAL

Summary. This Guide provides safe work methods to prevent these injuries and illnesses.

BAUER PROTECTIVE BASE LAYER

STRING LINES. If the frame is not fitted straight plumb and level the doors will not function correctly.

NORTHEASTERN BOBCATS DISTRICT SPIRIT CLOTHING SALE FALL 2011

SAFETY MADE EASY. The Importance of Hand Protection in the Workplace. FT Work Safety Awareness

Instruction Manual OmniPAGE Vertical Electrophoresis Units. Catalogue Numbers

Transcription:

Daily Drilling Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Country: USA StateOCSG TEXAS FieldPermit#: WOLFCAMP EAST Supervisors: EngineerManager: MICHAEL AARON JAMES WILSON MOTLEY, DEREK MANGUM DANNY Report Number: 004 Report Date: 11222014 DFS: 1.00 DOL: 3 AFE Days: 10 Last BOP T.: 11202014 Safety & Environmental Incident: No Depth mdtvd (ft): 5,311.01 5,233.75 SIDEWINDER222 Drlg Comp Fac Total Progress (ft): 4,313.01 713-997-1245 16079852387 ROP: 4,313.0 22.50 = 191.69 RKB (ft): 2,673.01 Day Cost($): 57,260 0 0 57,260 Proposed TD (ft): 14,600.00 Ground Level (ft): 2,648.0 Cum Cost($) 396,700 0 0 396,700 Next Csg Point (ft): 14,306.03 POB: 28 Total Man Hours: 318.00 AFE($): 0 0 0 0 Current Activity: DRILLING SIDEBUILD TO 5,311'. SPUD 11-21-14 07:00 AM 24 Hr Summary: DRILLING SIDEBUILD 24 Hr Forecast: DRILLING SIDEBUILD TO KOP TRIP FOR CURVE BIT, MUD PROPERTIES Fluids Co.: BAROID DONALD GILLASPY Time: 6:01 Oil Cnt (%): Location:UCTION TANK H2O Cnt (%): Pit Temp ( F) 85 Sand Cnt: Depth (ft): 4,647.01 MBT: Density (ppg): 8.70 ph: FV (sqt): 50 Pm: PV (cp): 15 PfMf: YP (lbf100ft²): 14 Chloride: Gels (): 121619 Calcium: WL: HTHP ( F): 250 ES (mv): Trip Gas (units): @ Conn Gas (units) @ Form: 9.50 LCM: Cake: Solids (lbmbbl): 2.00 LGS (%): 45 Ex Lime (ppb): 5.00 2.3 ECD (ppg): 9.0 OWR: 72.0 28.0 MUD LOGGING BG Gas (units): 66 26 488.0 Pore Pressure: (%) MUD MATERIALS D M Cost($): $6,751.10 C M Cost($): $7,651.10 Mud Additives Used ENGINEER 1 LIME 30 CALCIUM CHLORIDE POW 137 BARABLOK 10 EZ MUL 1 DURATONE HT 8 BAROID RIG WASH 1 Surf to Surf: Lag Strokes: Lag Time: (min) Bit# SN Size (in) Mfg IADC Type Model # Jets Depth In (ft) Depth Out (ft) Bit Rotations On Btm Hrs Cum Footage Cum (ft) ROP Cum WOB mnmx (kip) RPM rotbit Bit HP HSI PSI Drop (psi) Jet Vel (fts) Imp Force BIT RECORD 1 Size(in) MD(ft)TVD(ft) FITLOT(ppg) 12406776 13.00 65.00 65.00 8.75 9.00 981.00 981.00 HALLIBURTON 5.00 14,306.03 6,100.01 MM56D 5X22 988 1565 22.50 4,313 191.7 15 25 15 65 0.33 0.18 42.01 73.46 144.42 Grading I O D L B G O R Bit # Bit # 1 INVENTORY Item Inv RIG FUEL 13,077 MUD DIESEL 954 SOLIDS CONTROL Skr Deck 1 Screens Deck 2 Screens 1 50 2 50 BHA # 1 STRING LOADS Qty Item Description ID (in) OD (in) Len (ft) Cum (ft) On Btm Torque: 8,500 1 MM56D 2.000 8.750 1.00 1.00 Off Btm Torque: 6,500 1 RYAN 1.5 78 5.7 FBH MUD MOT 1.750 6.750 25.76 26.76 Str. Wt. Up: 130 1 EM TOOL NMDC 1.750 6.750 28.50 55.26 Str. Wt. Down: 110 1 UBHO 3.250 6.750 3.60 58.86 Str. Wt. Rot.: 120 1 NMDC W MWD 3.250 6.750 30.40 89.26 Max Over Pull: 10 1 NMDC 2.875 6.500 28.40 117.66 1 CROSSOVER 2.875 6.750 3.08 120.74 3 3) DRILL COLLARS 2.500 6.500 92.06 212.80 1 CROSSOVER 2.875 6.750 3.32 216.12 5" DP 4.281 5.000 5,094.89 5,311.01 Total Length: 5,311.01 BHA Hrs: Jar Hrs: BHA PROPERTIES Cum String Hours: Weight B Jars (kip): 23 23 SPR: Pump Type: Liner ID: SPM: GPM: 1 SPM: Pressure: 2 SPM: Pressure: MUD PUMPS #1 #2 #3 DR DR 6.00 6.00 101.00 0.00 436.14 0.00 40.00 40.00 335.00 350.00 60.00 60.00 520.00 540.00 T GPM (gpm): 0 SPP (psi): 1,850 AV (DC): 321 AV (DP): 241 SURVEYS MD (ft) Inclination( ) Azimuth ( ) TVD (ft) V Section (ft) +E-W (ft) +N-S (ft) Dog Leg ( 100ft) 4,512 10.70 87.40 4,440 18.73 532.10 14.69 0.79 4,607 10.50 90.90 4,534 19.12 549.57 14.95 0.71 4,701 8.90 88.70 4,626 19.27 565.40 14.99 1.75 4,796 7.30 85.60 4,720 20.00 578.77 15.62 1.75 4,891 6.20 83.40 4,815 21.14 589.88 16.67 1.19 4,986 4.80 80.40 4,909 22.46 598.90 17.92 1.50 5,081 4.00 79.60 5,004 23.78 606.08 19.18 0.84 5,175 2.30 76.50 5,098 24.85 611.14 20.21 1.82 06:00 07:00 1.00 P CASSURF 32 DRLFLOAT TAG CEMENT @ 950'. DRILL CEMENT & FLOAT EUIP. 07:00 15:30 8.50 P DRLPRD 08 DRLDIR DRILL SIDEBUILD F 998' T 2,951'. SPUD 11-21-14 07:00 AM 15:30 16:00 0.50 P DRLPRD 12 RIGSVC SERVICE RIG & TDU. 16:00 06:00 14.00 P DRLPRD 08 DRLDIR DRILL SIDEBUILD F 2,951' T 5,311'. Comments RYAN 6 34'' 1.5 FBH 78 5.0 SLK BTB - 5.2' EMBTS - 43' EMBTG - 44'BTS - 64' BTG - 75', RPG - 0.29, DRILLING OFF OF DIRECTIONAL PLAN # 1, SPUD 11-21-14 07:00 AM 11222014 8:11:31AM Printed: 1

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 001 Report Date: 01292015 DOE: 1 DOL: 1 AFE Days: 10.00 Supervisors: JESSE AGUILAR. Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No API #: 16079852387 7,155 0 7,155 Cum Cost($) 0 7,155 0 7,155 Long: 101 10' 37.22000 W POB: 0 Manhours: 0.00 Current Activity: WAITING TO TEST & SHIFT SLEEVES 24 Hr Summary: INSTALL & TEST MASTER VALVE. PREP LOCATION 24 Hr Forecast: TEST & SHIFT SLEEVES 06:00 08:00 2.00 P MIRU 01 MIRU WAITED ON PERSONNEL TO ARRIVE ON LOCATION 08:00 08:45 0.75 P MIRU 28 SFTYMTG HELD SAFETY MEETING WITH SPARTAN & YELLOW JACKET PERSONNEL. DISCUSSED PPE, "HELP", JSA'S, & FORK LIFT OPERATIONS. 08:45 14:45 6.00 P MIRU 01 MIRU NU 7-116 10 M FRAC VALVE- NOTE: 17 TURNS ON VALVE TO OPEN & CLOSE 14:45 17:45 3.00 P MIRU 01 MIRU TEST VALVE TO 250 PSI LOW & 10,000 PSI HIGH. HELD FOR 15 MINS. ALL TEST GOOD, REMOVE TEST PLUG & SECURE WELL. 17:45 06:00 12.25 P MIRU 18 OTHR SDFTN, NO FURTHER ACTIVTY Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 1302015 8:09:29AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 003 Report Date: 01312015 DOE: 3 DOL: 3 AFE Days: 10.00 Supervisors: JESSE AGUILAR LARRY WEEMS Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No 16079852387 14,431 0 14,431 Cum Cost($) 0 48,399 0 48,399 Long: 101 10' 37.22000 W POB: 13 Manhours: 128.00 Current Activity: RU FRAC TECH & ALL ASSOCIATED EQUIPMENT 24 Hr Summary: RU FRAC STACKS & CONTAINMENTS 24 Hr Forecast: RU FRAC TECH & ALL ASSOCIATED EQUIPMENT 06:00 07:00 1.00 P MIRU 18 OTHR WAITED ON PERSONNEL TO ARRIVE ON LOCATION 07:00 08:00 1.00 P MIRU 28 SFTYMTG HELD SAFETY MEETING WITH PERSONELL ON LOCATION. DISCUSSED "HELP" COMMUNICATION, PPE, CRANE, FORK-LIFT AND MAN-LIFT OPERATIONS 08:00 04:00 20.00 P MIRU 01 MIRU MI & SET 2 GAS BUSTER TANKS & 2 PUMP DOWN TANKS. SPOTTED & RU PREDATOR CRANE. RU & TORQUED FRAC STACK. RU FLOW BACK LINES TO THE FLOW BACK TANKS. TESTED FRAC STACK & FLOW BACK IRON TO 9500 PSI. HELD FOR 15 MINS (OK). MOVED IN LARTEX AND SET CONTAINMENTS OUT FOR EQUIPMENT. MI & SET UP WATER TREATMENT SYSTEM MI & SET 3 SAND KINGS & DUAL BELT. MIRU FRAC TECH BACKSIDE EQUIPMENT: 2 HYDRATIONS & 2 BLENDERS. 04:00 05:30 1.50 P MIRU 18 OTHR SDFTN, NO FURTHER ACTIVITY 05:30 06:00 0.50 P MIRU 28 SFTYMTG HSE MEETING W FRAC TECH ON RIGUP SAFETY. Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 262015 8:07:15AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 004 Report Date: 02012015 DOE: 4 DOL: 4 AFE Days: 10.00 Supervisors: JESSE AGUILAR LARRY WEEMS JAMES COPLast BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No 16079852387 7,184 0 7,184 Cum Cost($) 0 55,582 0 55,582 Long: 101 10' 37.22000 W POB: 17 Manhours: 264.00 Current Activity: WO CONNECTIONS FOR ZIPPER MANIFOLD. FINISH RU FRAC IRON TO WELL HEAD. 24 Hr Summary: RU FRAC TECH & ALL ASSOCIATED EQUIPMENT 24 Hr Forecast: TOE PREP, FRAC STAGES 1-5 & WL STAGES 1-6 06:00 07:00 1.00 P MIRU 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL. DISCUSSED PPE, FORKLIFTMANLIFT OPERATIONS, STOP WORK AUTHORITY, JSA S, & HELP 07:00 17:30 10.50 P MIRU 01 MIRU MIRU FRAC EQUIPMENT. MI & SPOT FRAC PUMPS. RU WELL HEAD AND PUMPDOWN RISERS. 17:30 18:00 0.50 P MIRU 28 SFTYMTG HSE MEETING WITH NIGHT CREW, DISCUSS RIG UP JSA, PPE 18:00 21:00 3.00 P MIRU 01 MIRU CONTINUE TO RU IRON. SHUT DOWN RU DUE TO FLANGES ON ZIPPER MANIFOLD AND GOAT HEADS ON WELL HEADS. 21:00 05:30 8.50 N MIRU 09 EQRP FLANGE PROBLEMS W ZIPPER MANIFOLD AND WELL HEADS 05:30 06:00 0.50 P MIRU 28 SFTYMTG HSE MEETING WITH DAY CREW Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 262015 8:12:34AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 004 Report Date: 02012015 DOE: 4 DOL: 4 AFE Days: 10.00 Supervisors: JESSE AGUILAR LARRY WEEMS JAMES COPLast BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No API #: 16079852387 7,222 0 7,222 Cum Cost($) 0 55,659 0 55,659 Long: 101 10' 37.22000 W POB: 17 Manhours: 264.00 Current Activity: WO CONNECTIONS FOR ZIPPER MANIFOLD. FINISH RU FRAC IRON TO WELL HEAD. 24 Hr Summary: RU FRAC TECH & ALL ASSOCIATED EQUIPMENT 24 Hr Forecast: TOE PREP, FRAC STAGES 1-5 & WL STAGES 1-6 06:00 07:00 1.00 P MIRU 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL. DISCUSSED PPE, FORKLIFTMANLIFT OPERATIONS, STOP WORK AUTHORITY, JSA S, & HELP 07:00 17:30 10.50 P MIRU 01 MIRU MIRU FRAC EQUIPMENT. MI & SPOT FRAC PUMPS. RU WELL HEAD AND PUMPDOWN RISERS. 17:30 18:00 0.50 P MIRU 28 SFTYMTG HSE MEETING WITH NIGHT CREW, DISCUSS RIG UP JSA, PPE 18:00 21:00 3.00 P MIRU 01 MIRU CONTINUE TO RU IRON. SHUT DOWN RU DUE TO FLANGES ON ZIPPER MANIFOLD AND GOAT HEADS ON WELL HEADS. 21:00 05:30 8.50 N MIRU 09 EQRP FLANGE PROBLEMS W ZIPPER MANIFOLD AND WELL HEADS 05:30 06:00 0.50 P MIRU 28 SFTYMTG HSE MEETING WITH DAY CREW Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 222015 8:11:01AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 005 Report Date: 02022015 DOE: 5 DOL: 5 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No API #: 16079852387 17,641 0 17,641 Cum Cost($) 0 73,300 0 73,300 Long: 101 10' 37.22000 W POB: 105 Manhours: 1,212.00 Current Activity: LOGGING OUT OF HOLE. 24 Hr Summary: WAITED ON FLANGES FOR ZIPPER & WH. TOE PREP, FRAC STAGES 1 & WL STAGES 1, LOG OUT OF HOLE. 24 Hr Forecast: FRAC STGS 1-5 WIRELINE STGS 2-6 06:00 16:30 10.50 N MIRU 09 EQRP WAITED ON SPARTAN TO DELIVER & CHANGE OUT FLANGES ON THE ZIPPER MANIFOLD & GOAT HEAD 16:30 17:30 1.00 P MIRU 01 MIRU RU TO ZIPPER MANIFOLD AND WELLHEAD 17:30 18:00 0.50 P MIRU 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONELL. DISCUSSED STOP WORK RESPONSIBILITY, PROPPER PPE, RIG-UP HAZARDS AND HAND PLACEMENT. 18:00 01:00 7.00 P MIRU 01 MIRU CONTINUE TO RU TO ZIPPER MANIFOLD AND WELLHEAD. PRESSURE TEST. TEST TO 8500 PSI. TEST GOOD. 01:00 02:00 1.00 P WBP 35 STIM TOE PREP. SICP 1135. EIR AT 9.9 BPM AT 4491 PSI. PUMP 60 BBLS 15% HCL. FLUSH TO TOE SLEEVE W 2% KCL WTR. WORK RATE TO 29.2 BPM AT 6458 PSI. INJECTED ACID @ 9.7 BPM @ 5261 PSI, BROKE BACK TO 3165 PSI. WORK RATE TO 40 BPM AT 5119 PSI. ISIP 2280 PSI F.G..91. 135 MIN SICP = 2096 2002 1971. PUMPED 540 BBLS. 02:00 03:00 1.00 N STG01 09 EQRP DOWN DUE TO LEAK ON DOWN STALK. 03:00 05:30 2.50 P STG01 21 PERF WL STAGE # 1. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W4.45"DUMMY PLUG & 8X 1' 3 38 LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5435'. PU & PERF STAGE # 1 ON THE FLY AT 14,051' - 14,138' OA PERFS, POH ALL SHOTS FIRED. LOG WELL TO 5,600'. PUMPED 439 BBLS. 05:30 06:00 0.50 P STG01 28 SFTYMTG HSE MEETING W DAY CREW. TALKED SLIPS TRIPS AND FALLS. HELP. Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments 2215 PERFORATE Printed: 232015 8:04:29AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 005 Report Date: 02022015 DOE: 5 DOL: 5 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No 16079852387 17,603 0 17,603 Cum Cost($) 0 73,185 0 73,185 Long: 101 10' 37.22000 W POB: 105 Manhours: 1,212.00 Current Activity: LOGGING OUT OF HOLE. 24 Hr Summary: WAITED ON FLANGES FOR ZIPPER & WH. TOE PREP, FRAC STAGES 1 & WL STAGES 1, LOG OUT OF HOLE. 24 Hr Forecast: FRAC STGS 1-5 WIRELINE STGS 2-6 06:00 16:30 10.50 N MIRU 09 EQRP WAITED ON SPARTAN TO DELIVER & CHANGE OUT FLANGES ON THE ZIPPER MANIFOLD & GOAT HEAD 16:30 17:30 1.00 P MIRU 01 MIRU RU TO ZIPPER MANIFOLD AND WELLHEAD 17:30 18:00 0.50 P MIRU 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONELL. DISCUSSED STOP WORK RESPONSIBILITY, PROPPER PPE, RIG-UP HAZARDS AND HAND PLACEMENT. 18:00 01:00 7.00 P MIRU 01 MIRU CONTINUE TO RU TO ZIPPER MANIFOLD AND WELLHEAD. PRESSURE TEST. TEST TO 8500 PSI. TEST GOOD. 01:00 02:00 1.00 P WBP 35 STIM TOE PREP. SICP 1135. EIR AT 9.9 BPM AT 4491 PSI. PUMP 60 BBLS 15% HCL. FLUSH TO TOE SLEEVE W 2% KCL WTR. WORK RATE TO 29.2 BPM AT 6458 PSI. INJECTED ACID @ 9.7 BPM @ 5261 PSI, BROKE BACK TO 3165 PSI. WORK RATE TO 40 BPM AT 5119 PSI. ISIP 2280 PSI F.G..91. 135 MIN SICP = 2096 2002 1971. PUMPED 540 BBLS. 02:00 03:00 1.00 N STG01 09 EQRP DOWN DUE TO LEAK ON DOWN STALK. 03:00 05:30 2.50 P STG01 21 PERF WL STAGE # 1. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W4.45"DUMMY PLUG & 8X 1' 3 38 LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5435'. PU & PERF STAGE # 1 ON THE FLY AT 14,051' - 14,138' OA PERFS, POH ALL SHOTS FIRED. LOG WELL TO 5,600'. PUMPED 439 BBLS. 05:30 06:00 0.50 P STG01 28 SFTYMTG HSE MEETING W DAY CREW. TALKED SLIPS TRIPS AND FALLS. HELP. Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments 2215 PERFORATE Printed: 262015 8:07:45AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 005 Report Date: 02022015 DOE: 5 DOL: 5 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No 16079852387 17,603 0 17,603 Cum Cost($) 0 73,185 0 73,185 Long: 101 10' 37.22000 W POB: 105 Manhours: 1,212.00 Current Activity: LOGGING OUT OF HOLE. 24 Hr Summary: WAITED ON FLANGES FOR ZIPPER & WH. TOE PREP, FRAC STAGES 1 & WL STAGES 1, LOG OUT OF HOLE. 24 Hr Forecast: FRAC STGS 1-5 WIRELINE STGS 2-6 06:00 16:30 10.50 N MIRU 09 EQRP WAITED ON SPARTAN TO DELIVER & CHANGE OUT FLANGES ON THE ZIPPER MANIFOLD & GOAT HEAD 16:30 17:30 1.00 P MIRU 01 MIRU RU TO ZIPPER MANIFOLD AND WELLHEAD 17:30 18:00 0.50 P MIRU 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONELL. DISCUSSED STOP WORK RESPONSIBILITY, PROPPER PPE, RIG-UP HAZARDS AND HAND PLACEMENT. 18:00 01:00 7.00 P MIRU 01 MIRU CONTINUE TO RU TO ZIPPER MANIFOLD AND WELLHEAD. PRESSURE TEST. TEST TO 8500 PSI. TEST GOOD. 01:00 02:00 1.00 P WBP 35 STIM TOE PREP. SICP 1135. EIR AT 9.9 BPM AT 4491 PSI. PUMP 60 BBLS 15% HCL. FLUSH TO TOE SLEEVE W 2% KCL WTR. WORK RATE TO 29.2 BPM AT 6458 PSI. INJECTED ACID @ 9.7 BPM @ 5261 PSI, BROKE BACK TO 3165 PSI. WORK RATE TO 40 BPM AT 5119 PSI. ISIP 2280 PSI F.G..91. 135 MIN SICP = 2096 2002 1971. PUMPED 540 BBLS. 02:00 03:00 1.00 N STG01 09 EQRP DOWN DUE TO LEAK ON DOWN STALK. 03:00 05:30 2.50 P STG01 21 PERF WL STAGE # 1. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W4.45"DUMMY PLUG & 8X 1' 3 38 LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5435'. PU & PERF STAGE # 1 ON THE FLY AT 14,051' - 14,138' OA PERFS, POH ALL SHOTS FIRED. LOG WELL TO 5,600'. PUMPED 439 BBLS. 05:30 06:00 0.50 P STG01 28 SFTYMTG HSE MEETING W DAY CREW. TALKED SLIPS TRIPS AND FALLS. HELP. Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments 2215 PERFORATE Printed: 272015 8:12:11AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 005 Report Date: 02022015 DOE: 5 DOL: 5 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No API #: 16079852387 16,191 0 16,191 Cum Cost($) 0 71,850 0 71,850 Long: 101 10' 37.22000 W POB: 105 Manhours: 1,212.00 Current Activity: LOGGING OUT OF HOLE. 24 Hr Summary: WAITED ON FLANGES FOR ZIPPER & WH. TOE PREP, FRAC STAGES 1 & WL STAGES 1, LOG OUT OF HOLE. 24 Hr Forecast: FRAC STGS 1-5 WIRELINE STGS 2-6 06:00 16:30 10.50 N MIRU 09 EQRP WAITED ON SPARTAN TO DELIVER & CHANGE OUT FLANGES ON THE ZIPPER MANIFOLD & GOAT HEAD 16:30 17:30 1.00 P MIRU 01 MIRU RU TO ZIPPER MANIFOLD AND WELLHEAD 17:30 18:00 0.50 P MIRU 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONELL. DISCUSSED STOP WORK RESPONSIBILITY, PROPPER PPE, RIG-UP HAZARDS AND HAND PLACEMENT. 18:00 01:00 7.00 P MIRU 01 MIRU CONTINUE TO RU TO ZIPPER MANIFOLD AND WELLHEAD. PRESSURE TEST. TEST TO 8500 PSI. TEST GOOD. 01:00 02:00 1.00 P WBP 35 STIM TOE PREP. SICP 1135. EIR AT 9.9 BPM AT 4491 PSI. PUMP 60 BBLS 15% HCL. FLUSH TO TOE SLEEVE W 2% KCL WTR. WORK RATE TO 29.2 BPM AT 6458 PSI. INJECTED ACID @ 9.7 BPM @ 5261 PSI, BROKE BACK TO 3165 PSI. WORK RATE TO 40 BPM AT 5119 PSI. ISIP 2280 PSI F.G..91. 135 MIN SICP = 2096 2002 1971. PUMPED 540 BBLS. 02:00 03:00 1.00 N STG01 09 EQRP DOWN DUE TO LEAK ON DOWN STALK. 03:00 05:30 2.50 P STG01 21 PERF WL STAGE # 1. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W4.45"DUMMY PLUG & 8X 1' 3 38 LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5435'. PU & PERF STAGE # 1 ON THE FLY AT 14,051' - 14,138' OA PERFS, POH ALL SHOTS FIRED. LOG WELL TO 5,600'. PUMPED 439 BBLS. 05:30 06:00 0.50 P STG01 28 SFTYMTG HSE MEETING W DAY CREW. TALKED SLIPS TRIPS AND FALLS. HELP. Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments 2215 PERFORATE Printed: 222015 8:05:14AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 006 Report Date: 02032015 DOE: 6 DOL: 6 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No API #: 16079852387 305,920 0 305,920 Cum Cost($) 0 379,220 0 379,220 Long: 101 10' 37.22000 W POB: 92 Manhours: 1,104.00 Current Activity: STANDBY FOR SIM-OPS ON "JH" WELL. 24 Hr Summary: FRAC STGS 1-5 WIRELINE STGS 2-6 24 Hr Forecast: FRAC STGS 6-7 WIRELINE STGS 7-8. 06:00 07:15 1.25 P STG01 18 OTHR PRIME UP PUMPS AND PRESSURE TEST TO 9000 PSI & HELD FOR 5 MINS (OK) 07:15 09:00 1.75 P STG01 35 STIM FRAC STAGE # 1 SLICKWATER 200- SICP 1400. PUMP 60 BBLS 15% HCL; 130,860 LBS 100 MESH @.5-2.0 PPA ; 159,840 LBS 4070 @.75-2.5 PPA. ATP 4989. ATR 84.3. MTP 6904. MTR 96. ISIP 2124. FG.78. TCF 6099. 09:00 11:15 2.25 P STG02 21 PERF WL STAGE # 2. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 14,022', PU & PERF STAGE # 2 ON THE FLY AT 13,853' - 14,001' OA PERFS, POH ALL SHOTS FIRED. PUMPED 542 BBLS. 11:15 13:30 2.25 P STG02 35 STIM FRAC STAGE # 2 SLICKWATER 200- SICP 2610. PUMP 15 BBLS 7.5% HCL; 130,100 LBS 100 MESH @.5-2.0 PPA ; 160,820 LBS 4070 @.75-2.5 PPA. ATP 5041. ATR 79. MTP 7257. MTR 93.3. ISIP 2104. FG.77. TCF 5615. 13:30 15:30 2.00 P STG03 21 PERF WL STAGE # 3. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,835', PU & PERF STAGE # 3 ON THE FLY AT 13,671' - 13,819' OA PERFS, POH ALL SHOTS FIRED. PUMPED 472 BBLS. 15:30 16:45 1.25 P STG03 35 STIM FRAC STAGE # 3 SLICKWATER 200- SICP 1595. PUMP 15 BBLS 7.5% HCL; 130,280 LBS 100 MESH @.5-2.0 PPA ; 160,360 LBS 4070 @.75-2.5 PPA. ATP 4881. ATR 83.3. MTP 6085. MTR 94.9. ISIP 2119. FG.78. TCF 5119 16:45 18:30 1.75 P STG04 21 PERF WL STAGE # 4. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,646', PU & PERF STAGE # 4 ON THE FLY AT 13,489' - 13,637' OA PERFS, POH ALL SHOTS FIRED. PUMPED 424 BBLS. HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL. 18:30 20:00 1.50 P STG04 35 STIM FRAC STAGE # 4 SLICKWATER 200- SICP 1630. 130,440 LBS 100 MESH @.5-2.0 PPA ; 160,400 LBS 4070 @.75-2.5 PPA. ATP 5220. ATR 89.9. MTP 7107. MTR 93.3. ISIP 2063. FG.77. TCF 5177 20:00 22:00 2.00 N STG05 55 PERFPROB RIH W PLUG AND GUNS TO DEPTH GUN DID NOT FIRE. POOH W PLUG AND GUNS TO FIND OUT PROBLEM. 22:00 23:30 1.50 P STG05 21 PERF WL STAGE # 5. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,477', PU & PERF STAGE # 5 ON THE FLY AT 13,307' - 13,455' OA PERFS, POH ALL SHOTS FIRED. PUMPED 877 BBLS. 23:30 00:30 1.00 P STG05 35 STIM FRAC STAGE # 5 SLICKWATER 200- HAD TO SHUT DOWN DUE TO COMPUTER FAILURE. LOST ALL PUMP CONTROLL. 00:30 01:15 0.75 N STG05 09 EQRP DOWN DUE TO COMPUTER FAILURE. LOST ALL PUMP CONTROL, FLUSH WELL AND SHUT DOWN TILL COMMUNICATION WAS RE-ESTABLISHED. 01:15 02:30 1.25 P STG05 35 STIM RESUME FRAC. 130,080 LBS 100 MESH @.5-2.0 PPA ; 155,640 LBS 4070 @.75-2.5 PPA. ATP 5396. ATR 89.6. MTP 5697. MTR 94.8. ISIP 2208. FG.79. TCF 5384. 02:30 03:30 1.00 P STG06 21 PERF WL STAGE # 6. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,289', PU & PERF STAGE # 6 ON THE FLY AT 13,125' - 13,273' OA PERFS, POH ALL SHOTS FIRED. PUMPED 420 BBLS. 03:30 05:45 2.25 P STG06 73 WOOWO STANDBY FOR SIM-OPS JH AND LH WELLS 05:45 06:00 0.25 P STG06 28 SFTYMTG HSE MEETING WITH DAY CREW. Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 242015 8:12:58AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 006 Report Date: 02032015 DOE: 6 DOL: 6 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No 16079852387 305,882 0 305,882 Cum Cost($) 0 379,066 0 379,066 Long: 101 10' 37.22000 W POB: 92 Manhours: 1,104.00 Current Activity: STANDBY FOR SIM-OPS ON "JH" WELL. 24 Hr Summary: FRAC STGS 1-5 WIRELINE STGS 2-6 24 Hr Forecast: FRAC STGS 6-7 WIRELINE STGS 7-8. 06:00 07:15 1.25 P STG01 18 OTHR PRIME UP PUMPS AND PRESSURE TEST TO 9000 PSI & HELD FOR 5 MINS (OK) 07:15 09:00 1.75 P STG01 35 STIM FRAC STAGE # 1 SLICKWATER 200- SICP 1400. PUMP 60 BBLS 15% HCL; 130,860 LBS 100 MESH @.5-2.0 PPA ; 159,840 LBS 4070 @.75-2.5 PPA. ATP 4989. ATR 84.3. MTP 6904. MTR 96. ISIP 2124. FG.78. TCF 6099. 09:00 11:15 2.25 P STG02 21 PERF WL STAGE # 2. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 14,022', PU & PERF STAGE # 2 ON THE FLY AT 13,853' - 14,001' OA PERFS, POH ALL SHOTS FIRED. PUMPED 542 BBLS. 11:15 13:30 2.25 P STG02 35 STIM FRAC STAGE # 2 SLICKWATER 200- SICP 2610. PUMP 15 BBLS 7.5% HCL; 130,100 LBS 100 MESH @.5-2.0 PPA ; 160,820 LBS 4070 @.75-2.5 PPA. ATP 5041. ATR 79. MTP 7257. MTR 93.3. ISIP 2104. FG.77. TCF 5615. 13:30 15:30 2.00 P STG03 21 PERF WL STAGE # 3. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,835', PU & PERF STAGE # 3 ON THE FLY AT 13,671' - 13,819' OA PERFS, POH ALL SHOTS FIRED. PUMPED 472 BBLS. 15:30 16:45 1.25 P STG03 35 STIM FRAC STAGE # 3 SLICKWATER 200- SICP 1595. PUMP 15 BBLS 7.5% HCL; 130,280 LBS 100 MESH @.5-2.0 PPA ; 160,360 LBS 4070 @.75-2.5 PPA. ATP 4881. ATR 83.3. MTP 6085. MTR 94.9. ISIP 2119. FG.78. TCF 5119 16:45 18:30 1.75 P STG04 21 PERF WL STAGE # 4. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,646', PU & PERF STAGE # 4 ON THE FLY AT 13,489' - 13,637' OA PERFS, POH ALL SHOTS FIRED. PUMPED 424 BBLS. HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL. 18:30 20:00 1.50 P STG04 35 STIM FRAC STAGE # 4 SLICKWATER 200- SICP 1630. 130,440 LBS 100 MESH @.5-2.0 PPA ; 160,400 LBS 4070 @.75-2.5 PPA. ATP 5220. ATR 89.9. MTP 7107. MTR 93.3. ISIP 2063. FG.77. TCF 5177 20:00 22:00 2.00 N STG05 55 PERFPROB RIH W PLUG AND GUNS TO DEPTH GUN DID NOT FIRE. POOH W PLUG AND GUNS TO FIND OUT PROBLEM. 22:00 23:30 1.50 P STG05 21 PERF WL STAGE # 5. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,477', PU & PERF STAGE # 5 ON THE FLY AT 13,307' - 13,455' OA PERFS, POH ALL SHOTS FIRED. PUMPED 877 BBLS. 23:30 00:30 1.00 P STG05 35 STIM FRAC STAGE # 5 SLICKWATER 200- HAD TO SHUT DOWN DUE TO COMPUTER FAILURE. LOST ALL PUMP CONTROLL. 00:30 01:15 0.75 N STG05 09 EQRP DOWN DUE TO COMPUTER FAILURE. LOST ALL PUMP CONTROL, FLUSH WELL AND SHUT DOWN TILL COMMUNICATION WAS RE-ESTABLISHED. 01:15 02:30 1.25 P STG05 35 STIM RESUME FRAC. 130,080 LBS 100 MESH @.5-2.0 PPA ; 155,640 LBS 4070 @.75-2.5 PPA. ATP 5396. ATR 89.6. MTP 5697. MTR 94.8. ISIP 2208. FG.79. TCF 5384. 02:30 03:30 1.00 P STG06 21 PERF WL STAGE # 6. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,289', PU & PERF STAGE # 6 ON THE FLY AT 13,125' - 13,273' OA PERFS, POH ALL SHOTS FIRED. PUMPED 420 BBLS. 03:30 05:45 2.25 P STG06 73 WOOWO STANDBY FOR SIM-OPS JH AND LH WELLS 05:45 06:00 0.25 P STG06 28 SFTYMTG HSE MEETING WITH DAY CREW. Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 262015 8:02:32AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 006 Report Date: 02032015 DOE: 6 DOL: 6 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No 16079852387 305,431 0 305,431 Cum Cost($) 0 378,616 0 378,616 Long: 101 10' 37.22000 W POB: 92 Manhours: 1,104.00 Current Activity: STANDBY FOR SIM-OPS ON "JH" WELL. 24 Hr Summary: FRAC STGS 1-5 WIRELINE STGS 2-6 24 Hr Forecast: FRAC STGS 6-7 WIRELINE STGS 7-8. 06:00 07:15 1.25 P STG01 18 OTHR PRIME UP PUMPS AND PRESSURE TEST TO 9000 PSI & HELD FOR 5 MINS (OK) 07:15 09:00 1.75 P STG01 35 STIM FRAC STAGE # 1 SLICKWATER 200- SICP 1400. PUMP 60 BBLS 15% HCL; 130,860 LBS 100 MESH @.5-2.0 PPA ; 159,840 LBS 4070 @.75-2.5 PPA. ATP 4989. ATR 84.3. MTP 6904. MTR 96. ISIP 2124. FG.78. TCF 6099. 09:00 11:15 2.25 P STG02 21 PERF WL STAGE # 2. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 14,022', PU & PERF STAGE # 2 ON THE FLY AT 13,853' - 14,001' OA PERFS, POH ALL SHOTS FIRED. PUMPED 542 BBLS. 11:15 13:30 2.25 P STG02 35 STIM FRAC STAGE # 2 SLICKWATER 200- SICP 2610. PUMP 15 BBLS 7.5% HCL; 130,100 LBS 100 MESH @.5-2.0 PPA ; 160,820 LBS 4070 @.75-2.5 PPA. ATP 5041. ATR 79. MTP 7257. MTR 93.3. ISIP 2104. FG.77. TCF 5615. 13:30 15:30 2.00 P STG03 21 PERF WL STAGE # 3. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,835', PU & PERF STAGE # 3 ON THE FLY AT 13,671' - 13,819' OA PERFS, POH ALL SHOTS FIRED. PUMPED 472 BBLS. 15:30 16:45 1.25 P STG03 35 STIM FRAC STAGE # 3 SLICKWATER 200- SICP 1595. PUMP 15 BBLS 7.5% HCL; 130,280 LBS 100 MESH @.5-2.0 PPA ; 160,360 LBS 4070 @.75-2.5 PPA. ATP 4881. ATR 83.3. MTP 6085. MTR 94.9. ISIP 2119. FG.78. TCF 5119 16:45 18:30 1.75 P STG04 21 PERF WL STAGE # 4. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,646', PU & PERF STAGE # 4 ON THE FLY AT 13,489' - 13,637' OA PERFS, POH ALL SHOTS FIRED. PUMPED 424 BBLS. HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL. 18:30 20:00 1.50 P STG04 35 STIM FRAC STAGE # 4 SLICKWATER 200- SICP 1630. 130,440 LBS 100 MESH @.5-2.0 PPA ; 160,400 LBS 4070 @.75-2.5 PPA. ATP 5220. ATR 89.9. MTP 7107. MTR 93.3. ISIP 2063. FG.77. TCF 5177 20:00 22:00 2.00 N STG05 55 PERFPROB RIH W PLUG AND GUNS TO DEPTH GUN DID NOT FIRE. POOH W PLUG AND GUNS TO FIND OUT PROBLEM. 22:00 23:30 1.50 P STG05 21 PERF WL STAGE # 5. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,477', PU & PERF STAGE # 5 ON THE FLY AT 13,307' - 13,455' OA PERFS, POH ALL SHOTS FIRED. PUMPED 877 BBLS. 23:30 00:30 1.00 P STG05 35 STIM FRAC STAGE # 5 SLICKWATER 200- HAD TO SHUT DOWN DUE TO COMPUTER FAILURE. LOST ALL PUMP CONTROLL. 00:30 01:15 0.75 N STG05 09 EQRP DOWN DUE TO COMPUTER FAILURE. LOST ALL PUMP CONTROL, FLUSH WELL AND SHUT DOWN TILL COMMUNICATION WAS RE-ESTABLISHED. 01:15 02:30 1.25 P STG05 35 STIM RESUME FRAC. 130,080 LBS 100 MESH @.5-2.0 PPA ; 155,640 LBS 4070 @.75-2.5 PPA. ATP 5396. ATR 89.6. MTP 5697. MTR 94.8. ISIP 2208. FG.79. TCF 5384. 02:30 03:30 1.00 P STG06 21 PERF WL STAGE # 6. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,289', PU & PERF STAGE # 6 ON THE FLY AT 13,125' - 13,273' OA PERFS, POH ALL SHOTS FIRED. PUMPED 420 BBLS. 03:30 05:45 2.25 P STG06 73 WOOWO STANDBY FOR SIM-OPS JH AND LH WELLS 05:45 06:00 0.25 P STG06 28 SFTYMTG HSE MEETING WITH DAY CREW. Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 272015 8:06:02AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 006 Report Date: 02032015 DOE: 6 DOL: 6 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No API #: 16079852387 305,920 0 305,920 Cum Cost($) 0 379,220 0 379,220 Long: 101 10' 37.22000 W POB: 92 Manhours: 1,104.00 Current Activity: STANDBY FOR SIM-OPS ON "JH" WELL. 24 Hr Summary: FRAC STGS 1-5 WIRELINE STGS 2-6 24 Hr Forecast: FRAC STGS 6-7 WIRELINE STGS 7-8. 06:00 07:15 1.25 P STG01 18 OTHR PRIME UP PUMPS AND PRESSURE TEST TO 9000 PSI & HELD FOR 5 MINS (OK) 07:15 09:00 1.75 P STG01 35 STIM FRAC STAGE # 1 SLICKWATER 200- SICP 1400. PUMP 60 BBLS 15% HCL; 130,860 LBS 100 MESH @.5-2.0 PPA ; 159,840 LBS 4070 @.75-2.5 PPA. ATP 4989. ATR 84.3. MTP 6904. MTR 96. ISIP 2124. FG.78. TCF 6099. 09:00 11:15 2.25 P STG02 21 PERF WL STAGE # 2. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 14,022', PU & PERF STAGE # 2 ON THE FLY AT 13,853' - 14,001' OA PERFS, POH ALL SHOTS FIRED. PUMPED 542 BBLS. 11:15 13:30 2.25 P STG02 35 STIM FRAC STAGE # 2 SLICKWATER 200- SICP 2610. PUMP 15 BBLS 7.5% HCL; 130,100 LBS 100 MESH @.5-2.0 PPA ; 160,820 LBS 4070 @.75-2.5 PPA. ATP 5041. ATR 79. MTP 7257. MTR 93.3. ISIP 2104. FG.77. TCF 5615. 13:30 15:30 2.00 P STG03 21 PERF WL STAGE # 3. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,835', PU & PERF STAGE # 3 ON THE FLY AT 13,671' - 13,819' OA PERFS, POH ALL SHOTS FIRED. PUMPED 472 BBLS. 15:30 16:45 1.25 P STG03 35 STIM FRAC STAGE # 3 SLICKWATER 200- SICP 1595. PUMP 15 BBLS 7.5% HCL; 130,280 LBS 100 MESH @.5-2.0 PPA ; 160,360 LBS 4070 @.75-2.5 PPA. ATP 4881. ATR 83.3. MTP 6085. MTR 94.9. ISIP 2119. FG.78. TCF 5119 16:45 18:30 1.75 P STG04 21 PERF WL STAGE # 4. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,646', PU & PERF STAGE # 4 ON THE FLY AT 13,489' - 13,637' OA PERFS, POH ALL SHOTS FIRED. PUMPED 424 BBLS. HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL. 18:30 20:00 1.50 P STG04 35 STIM FRAC STAGE # 4 SLICKWATER 200- SICP 1630. 130,440 LBS 100 MESH @.5-2.0 PPA ; 160,400 LBS 4070 @.75-2.5 PPA. ATP 5220. ATR 89.9. MTP 7107. MTR 93.3. ISIP 2063. FG.77. TCF 5177 20:00 22:00 2.00 N STG05 55 PERFPROB RIH W PLUG AND GUNS TO DEPTH GUN DID NOT FIRE. POOH W PLUG AND GUNS TO FIND OUT PROBLEM. 22:00 23:30 1.50 P STG05 21 PERF WL STAGE # 5. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,477', PU & PERF STAGE # 5 ON THE FLY AT 13,307' - 13,455' OA PERFS, POH ALL SHOTS FIRED. PUMPED 877 BBLS. 23:30 00:30 1.00 P STG05 35 STIM FRAC STAGE # 5 SLICKWATER 200- SICP xxx. SHUT DOWN DUE TO COMPUTER FAILURE. LOST ALL PUMP CONTROLL. 00:30 01:15 0.75 N STG05 09 EQRP DOWN DUE TO COMPUTER FAILURE. LOST ALL PUMP CONTROL, FLUSH WELL AND SHUT DOWN TILL COMMUNICATION WAS RE-ESTABLISHED. 01:15 02:30 1.25 P STG05 35 STIM RESUME FRAC. 130,080 LBS 100 MESH @.5-2.0 PPA ; 155,640 LBS 4070 @.75-2.5 PPA. ATP 5396. ATR 89.6. MTP 5697. MTR 94.8. ISIP 2208. FG.79. TCF 5384. 02:30 03:30 1.00 P STG06 21 PERF WL STAGE # 6. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,289', PU & PERF STAGE # 6 ON THE FLY AT 13,125' - 13,273' OA PERFS, POH ALL SHOTS FIRED. PUMPED 420 BBLS. 03:30 05:45 2.25 P STG06 73 WOOWO STANDBY FOR SIM-OPS JH AND LH WELLS 05:45 06:00 0.25 P STG06 28 SFTYMTG HSE MEETING WITH DAY CREW. Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 232015 8:15:06AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 007 Report Date: 02042015 DOE: 7 DOL: 7 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No 16079852387 110,972 0 110,972 Cum Cost($) 0 490,038 0 490,038 Long: 101 10' 37.22000 W POB: 0 Manhours: 0.00 Current Activity: FRAC STG 8 @ REPORT TIME 24 Hr Summary: FRAC STGS 6-7 WIRELINE STGS 7-8. 24 Hr Forecast: FRAC STGS 8-10 WIRELINE STGS 9-10. 06:00 08:00 2.00 P STG06 73 WOOWO STANDBY FOR SIM-OPS "L" WELL 08:00 14:00 6.00 P STG06 73 WOOWO STANDBY FOR SIM-OPS JH & LH WELLS 14:00 16:00 2.00 P STG06 35 STIM FRAC STAGE #6 SLICKWATER 200- SICP 1455. PUMPED 130,580 LBS 100 MESH @.5-2.0 PPA ; 160,060 LBS 4070 @.75-2.5 PPA. ATP 5216. ATR 89.8. MTP 6100. MTR 95.2. ISIP 2237. FG.80. TCF 5131 16:00 17:45 1.75 P STG07 73 WOOWO STANDBY FOR SIM-OPS JH- WIRELINE & LH- FRAC. 17:45 18:00 0.25 P STG07 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL. 18:00 20:15 2.25 N STG07 09 EQRP DOWN DUE TO WATER TRANSFERS LINE BUSTING. HAPPENED EARLY DURING THE FRAC. ABLE TO PUMP 210,000# OUT OF 290,000#. 20:15 22:45 2.50 P STG07 21 PERF WL STAGE # 7. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,107', PU & PERF STAGE # 7 ON THE FLY AT 12943' - 13,087' OA PERFS, POH ALL SHOTS FIRED. PUMPED 447 BBLS. SD WAIT ON " JH" FRAC OPERATIONS. 22:45 00:00 1.25 P STG07 35 STIM FRAC STAGE #7 SLICKWATER 200- SICP 1455. PUMPED 128,960 LBS 100 MESH @.5-2.0 PPA ; 160,160 LBS 4070 @.75-2.5 PPA. ATP 5269. ATR 88.6. MTP 6114. MTR 94.9. ISIP 2181. FG.79. TCF 5111 00:00 02:00 2.00 P STG08 73 WOOWO STANDBY FOR SIM-OPS JH- WIRELINE & LH- FRAC. 02:00 03:45 1.75 P STG08 21 PERF WL STAGE # 8. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,925', PU & PERF STAGE # 8 ON THE FLY AT 12,761' - 12,913' OA PERFS, POH ALL SHOTS FIRED. PUMPED 437 BBLS. SD WAIT ON " JH" FRAC OPERATIONS. 03:45 04:45 1.00 P STG08 18 OTHR REHEAD WIRELINE. 04:45 05:45 1.00 P STG08 35 STIM FRAC STG 8 AT THE TIME OF REPORT. 05:45 06:00 0.25 P STG08 28 SFTYMTG HSE MEETING WITH DAY CREW Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 262015 8:17:52AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 007 Report Date: 02042015 DOE: 7 DOL: 7 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No 16079852387 110,747 0 110,747 Cum Cost($) 0 489,363 0 489,363 Long: 101 10' 37.22000 W POB: 0 Manhours: 0.00 Current Activity: FRAC STG 8 @ REPORT TIME 24 Hr Summary: FRAC STGS 6-7 WIRELINE STGS 7-8. 24 Hr Forecast: FRAC STGS 8-10 WIRELINE STGS 9-10. 06:00 08:00 2.00 P STG06 73 WOOWO STANDBY FOR SIM-OPS "L" WELL 08:00 14:00 6.00 P STG06 73 WOOWO STANDBY FOR SIM-OPS JH & LH WELLS 14:00 16:00 2.00 P STG06 35 STIM FRAC STAGE #6 SLICKWATER 200- SICP 1455. PUMPED 130,580 LBS 100 MESH @.5-2.0 PPA ; 160,060 LBS 4070 @.75-2.5 PPA. ATP 5216. ATR 89.8. MTP 6100. MTR 95.2. ISIP 2237. FG.80. TCF 5131 16:00 17:45 1.75 P STG07 73 WOOWO STANDBY FOR SIM-OPS JH- WIRELINE & LH- FRAC. 17:45 18:00 0.25 P STG07 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL. 18:00 20:15 2.25 N STG07 09 EQRP DOWN DUE TO WATER TRANSFERS LINE BUSTING. HAPPENED EARLY DURING THE FRAC. ABLE TO PUMP 210,000# OUT OF 290,000#. 20:15 22:45 2.50 P STG07 21 PERF WL STAGE # 7. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,107', PU & PERF STAGE # 7 ON THE FLY AT 12943' - 13,087' OA PERFS, POH ALL SHOTS FIRED. PUMPED 447 BBLS. SD WAIT ON " JH" FRAC OPERATIONS. 22:45 00:00 1.25 P STG07 35 STIM FRAC STAGE #7 SLICKWATER 200- SICP 1455. PUMPED 128,960 LBS 100 MESH @.5-2.0 PPA ; 160,160 LBS 4070 @.75-2.5 PPA. ATP 5269. ATR 88.6. MTP 6114. MTR 94.9. ISIP 2181. FG.79. TCF 5111 00:00 02:00 2.00 P STG08 73 WOOWO STANDBY FOR SIM-OPS JH- WIRELINE & LH- FRAC. 02:00 03:45 1.75 P STG08 21 PERF WL STAGE # 8. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,925', PU & PERF STAGE # 8 ON THE FLY AT 12,761' - 12,913' OA PERFS, POH ALL SHOTS FIRED. PUMPED 437 BBLS. SD WAIT ON " JH" FRAC OPERATIONS. 03:45 04:45 1.00 P STG08 18 OTHR REHEAD WIRELINE. 04:45 05:45 1.00 P STG08 35 STIM FRAC STG 8 AT THE TIME OF REPORT. 05:45 06:00 0.25 P STG08 28 SFTYMTG HSE MEETING WITH DAY CREW Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 272015 8:02:37AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 007 Report Date: 02042015 DOE: 7 DOL: 7 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No API #: 16079852387 111,011 0 111,011 Cum Cost($) 0 490,231 0 490,231 Long: 101 10' 37.22000 W POB: 0 Manhours: 0.00 Current Activity: FRAC STG 8 @ REPORT TIME 24 Hr Summary: FRAC STGS 6-7 WIRELINE STGS 7-8. 24 Hr Forecast: FRAC STGS 8-10 WIRELINE STGS 9-10. 06:00 08:00 2.00 P STG06 73 WOOWO STANDBY FOR SIM-OPS "L" WELL 08:00 14:00 6.00 P STG06 73 WOOWO STANDBY FOR SIM-OPS JH & LH WELLS 14:00 16:00 2.00 P STG06 35 STIM FRAC STAGE #6 SLICKWATER 200- SICP 1455. PUMPED 130,580 LBS 100 MESH @.5-2.0 PPA ; 160,060 LBS 4070 @.75-2.5 PPA. ATP 5216. ATR 89.8. MTP 6100. MTR 95.2. ISIP 2237. FG.80. TCF 5131 16:00 17:45 1.75 P STG07 73 WOOWO STANDBY FOR SIM-OPS JH- WIRELINE & LH- FRAC. 17:45 18:00 0.25 P STG07 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL. 18:00 20:15 2.25 N STG07 09 EQRP DOWN DUE TO WATER TRANSFERS LINE BUSTING. HAPPENED EARLY DURING THE FRAC. ABLE TO PUMP 210,000# OUT OF 290,000#. 20:15 22:45 2.50 P STG07 21 PERF WL STAGE # 7. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 13,107', PU & PERF STAGE # 7 ON THE FLY AT 12943' - 13,087' OA PERFS, POH ALL SHOTS FIRED. PUMPED 447 BBLS. SD WAIT ON " JH" FRAC OPERATIONS. 22:45 00:00 1.25 P STG07 35 STIM FRAC STAGE #7 SLICKWATER 200- SICP 1455. PUMPED 128,960 LBS 100 MESH @.5-2.0 PPA ; 160,160 LBS 4070 @.75-2.5 PPA. ATP 5269. ATR 88.6. MTP 6114. MTR 94.9. ISIP 2181. FG.79. TCF 5111 00:00 02:00 2.00 P STG08 73 WOOWO STANDBY FOR SIM-OPS JH- WIRELINE & LH- FRAC. 02:00 03:45 1.75 P STG08 21 PERF WL STAGE # 8. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,925', PU & PERF STAGE # 8 ON THE FLY AT 12,761' - 12,913' OA PERFS, POH ALL SHOTS FIRED. PUMPED 437 BBLS. SD WAIT ON " JH" FRAC OPERATIONS. 03:45 04:45 1.00 P STG08 18 OTHR REHEAD WIRELINE. 04:45 05:45 1.00 P STG08 35 STIM FRAC STG 8 AT THE TIME OF REPORT. 05:45 06:00 0.25 P STG08 28 SFTYMTG HSE MEETING WITH DAY CREW Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 242015 8:11:13AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 008 Report Date: 02052015 DOE: 8 DOL: 8 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No 16079852387 217,887 0 217,887 Cum Cost($) 0 707,926 0 707,926 Long: 101 10' 37.22000 W POB: 124 Manhours: 496.00 Current Activity: STANDBY FOR SIM-OPS "LH" STAGE 7 WIRELINE & "JH" STAGE 7 FRAC 24 Hr Summary: FRAC STGS 8-11 WIRELINE STGS 9-12. 24 Hr Forecast: FRAC STGS 12-15 WIRELINE STGS 13-16. 06:00 09:15 3.25 P STG08 35 STIM FRAC STAGE #8 SLICKWATER 200- SICP 1610. PUMPED 129,780 LBS 100 MESH @.5-2.0 PPA ; 160,240 LBS 4070 @.75-2.5 PPA. ATP 5207. ATR 87.3. MTP 5862. MTR 93.7. ISIP 2083. FG.77. TCF 5423. 09:15 11:00 1.75 P STG09 21 PERF WL STAGE # 9. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,743', PU & PERF STAGE # 9 ON THE FLY AT 12,576' - 12,731' OA PERFS, POH ALL SHOTS FIRED. PUMPED 418 BBLS. STANDBY FOR SIM-OPS "JH" FRAC 11:00 15:00 4.00 P STG09 35 STIM FRAC STAGE #9 SLICKWATER 200- SICP 1561. PUMPED 130,320 LBS 100 MESH @.5-2.0 PPA ; 160,500 LBS 4070 @.75-2.5 PPA. ATP 5253. ATR 89.3. MTP 6357. MTR 95.2. ISIP 2401. FG.82. TCF 5518. STANDBY FOR SIM-OPS "LH" FRAC 15:00 16:45 1.75 P STG10 21 PERF WL STAGE # 10. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,561', PU & PERF STAGE # 10 ON THE FLY AT 12,393' - 12,545' OA PERFS, POH ALL SHOTS FIRED. PUMPED 409 BBLS. STANDBY FOR "JH" FRAC 16:45 17:45 1.00 P STG10 18 OTHR GREASE MASTER VALVE, FRAC STACK, & ZIPPER MANIFOLD. 17:45 18:00 0.25 P STG10 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL 18:00 20:00 2.00 P STG10 35 STIM FRAC STAGE #10 SLICKWATER 200- SICP. PUMPED 130,160 LBS 100 MESH @.5-2.0 PPA ; 160,320 LBS 4070 @.75-2.5 PPA. ATP 5493. ATR 88.5. MTP 6928. MTR 95. ISIP 2259. FG.80. TCF 5104. 20:15 22:00 1.75 P STG11 21 PERF WL STAGE # 11. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,379', PU & PERF STAGE # 11 ON THE FLY AT 12,215' - 12,363' OA PERFS, POH ALL SHOTS FIRED. PUMPED 429 BBLS. STANDBY FOR "LH" FRAC 22:00 01:30 3.50 P STG11 73 WOOWO STANDBY FOR SIM-OPS "JH" FRAC & "LH" WIRELINE. 01:30 02:45 1.25 P STG11 35 STIM FRAC STAGE #11 SLICKWATER 200- SICP 1551. PUMPED 129,180 LBS 100 MESH @.5-2.0 PPA ; 160,120 LBS 4070 @.75-2.5 PPA. ATP 5649. ATR 89.1. MTP 6779. MTR 98.4. ISIP 2264. FG.805. TCF 4990. 02:45 04:30 1.75 P STG12 21 PERF WL STAGE # 12. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,197', PU & PERF STAGE # 12 ON THE FLY AT 12,029' - 12,181' OA PERFS, POH ALL SHOTS FIRED. PUMPED 418 BBLS. STANDBY FOR "LH" FRAC 04:30 05:30 1.00 P STG12 73 WOOWO STANDBY FOR SIM-OPS "JH" FRAC & "LH" WIRELINE. 05:30 06:00 0.50 P STG12 28 SFTYMTG HOLD HSE MEETING WITH DAY CREW Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 262015 8:02:52AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 008 Report Date: 02052015 DOE: 8 DOL: 8 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No 16079852387 217,512 0 217,512 Cum Cost($) 0 706,875 0 706,875 Long: 101 10' 37.22000 W POB: 124 Manhours: 496.00 Current Activity: STANDBY FOR SIM-OPS "LH" STAGE 7 WIRELINE & "JH" STAGE 7 FRAC 24 Hr Summary: FRAC STGS 8-11 WIRELINE STGS 9-12. 24 Hr Forecast: FRAC STGS 12-15 WIRELINE STGS 13-16. 06:00 09:15 3.25 P STG08 35 STIM FRAC STAGE #8 SLICKWATER 200- SICP 1610. PUMPED 129,780 LBS 100 MESH @.5-2.0 PPA ; 160,240 LBS 4070 @.75-2.5 PPA. ATP 5207. ATR 87.3. MTP 5862. MTR 93.7. ISIP 2083. FG.77. TCF 5423. 09:15 11:00 1.75 P STG09 21 PERF WL STAGE # 9. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,743', PU & PERF STAGE # 9 ON THE FLY AT 12,576' - 12,731' OA PERFS, POH ALL SHOTS FIRED. PUMPED 418 BBLS. STANDBY FOR SIM-OPS "JH" FRAC 11:00 15:00 4.00 P STG09 35 STIM FRAC STAGE #9 SLICKWATER 200- SICP 1561. PUMPED 130,320 LBS 100 MESH @.5-2.0 PPA ; 160,500 LBS 4070 @.75-2.5 PPA. ATP 5253. ATR 89.3. MTP 6357. MTR 95.2. ISIP 2401. FG.82. TCF 5518. STANDBY FOR SIM-OPS "LH" FRAC 15:00 16:45 1.75 P STG10 21 PERF WL STAGE # 10. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,561', PU & PERF STAGE # 10 ON THE FLY AT 12,393' - 12,545' OA PERFS, POH ALL SHOTS FIRED. PUMPED 409 BBLS. STANDBY FOR "JH" FRAC 16:45 17:45 1.00 P STG10 18 OTHR GREASE MASTER VALVE, FRAC STACK, & ZIPPER MANIFOLD. 17:45 18:00 0.25 P STG10 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL 18:00 20:00 2.00 P STG10 35 STIM FRAC STAGE #10 SLICKWATER 200- SICP. PUMPED 130,160 LBS 100 MESH @.5-2.0 PPA ; 160,320 LBS 4070 @.75-2.5 PPA. ATP 5493. ATR 88.5. MTP 6928. MTR 95. ISIP 2259. FG.80. TCF 5104. 20:15 22:00 1.75 P STG11 21 PERF WL STAGE # 11. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,379', PU & PERF STAGE # 11 ON THE FLY AT 12,215' - 12,363' OA PERFS, POH ALL SHOTS FIRED. PUMPED 429 BBLS. STANDBY FOR "LH" FRAC 22:00 01:30 3.50 P STG11 73 WOOWO STANDBY FOR SIM-OPS "JH" FRAC & "LH" WIRELINE. 01:30 02:45 1.25 P STG11 35 STIM FRAC STAGE #11 SLICKWATER 200- SICP 1551. PUMPED 129,180 LBS 100 MESH @.5-2.0 PPA ; 160,120 LBS 4070 @.75-2.5 PPA. ATP 5649. ATR 89.1. MTP 6779. MTR 98.4. ISIP 2264. FG.805. TCF 4990. 02:45 04:30 1.75 P STG12 21 PERF WL STAGE # 12. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,197', PU & PERF STAGE # 12 ON THE FLY AT 12,029' - 12,181' OA PERFS, POH ALL SHOTS FIRED. PUMPED 418 BBLS. STANDBY FOR "LH" FRAC 04:30 05:30 1.00 P STG12 73 WOOWO STANDBY FOR SIM-OPS "JH" FRAC & "LH" WIRELINE. 05:30 06:00 0.50 P STG12 28 SFTYMTG HOLD HSE MEETING WITH DAY CREW Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 272015 8:06:24AM

Well NameWellbore No.: UNIVERSITY EAST 4109KH00 Report Number: 008 Report Date: 02052015 DOE: 8 DOL: 8 AFE Days: 10.00 Supervisors: AGUILAR WEEMS ONTIVEROS COPELAND Last BOP T.: EngineerManager: ELLIS, PRESTON LLOYD, BARRY Safety & Environmental Incident: No 16079852387 217,926 0 217,926 Cum Cost($) 0 708,157 0 708,157 Long: 101 10' 37.22000 W POB: 124 Manhours: 496.00 Current Activity: STANDBY FOR SIM-OPS "LH" STAGE 7 WIRELINE & "JH" STAGE 7 FRAC 24 Hr Summary: FRAC STGS 8-11 WIRELINE STGS 9-12. 24 Hr Forecast: FRAC STGS 12-15 WIRELINE STGS 13-16. 06:00 09:15 3.25 P STG08 35 STIM FRAC STAGE #8 SLICKWATER 200- SICP 1610. PUMPED 129,780 LBS 100 MESH @.5-2.0 PPA ; 160,240 LBS 4070 @.75-2.5 PPA. ATP 5207. ATR 87.3. MTP 5862. MTR 93.7. ISIP 2083. FG.77. TCF 5423. 09:15 11:00 1.75 P STG09 21 PERF WL STAGE # 9. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,743', PU & PERF STAGE # 9 ON THE FLY AT 12,576' - 12,731' OA PERFS, POH ALL SHOTS FIRED. PUMPED 418 BBLS. STANDBY FOR SIM-OPS "JH" FRAC 11:00 15:00 4.00 P STG09 35 STIM FRAC STAGE #9 SLICKWATER 200- SICP 1561. PUMPED 130,320 LBS 100 MESH @.5-2.0 PPA ; 160,500 LBS 4070 @.75-2.5 PPA. ATP 5253. ATR 89.3. MTP 6357. MTR 95.2. ISIP 2401. FG.82. TCF 5518. STANDBY FOR SIM-OPS "LH" FRAC 15:00 16:45 1.75 P STG10 21 PERF WL STAGE # 10. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,561', PU & PERF STAGE # 10 ON THE FLY AT 12,393' - 12,545' OA PERFS, POH ALL SHOTS FIRED. PUMPED 409 BBLS. STANDBY FOR "JH" FRAC 16:45 17:45 1.00 P STG10 18 OTHR GREASE MASTER VALVE, FRAC STACK, & ZIPPER MANIFOLD. 17:45 18:00 0.25 P STG10 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL 18:00 20:00 2.00 P STG10 35 STIM FRAC STAGE #10 SLICKWATER 200- SICP. PUMPED 130,160 LBS 100 MESH @.5-2.0 PPA ; 160,320 LBS 4070 @.75-2.5 PPA. ATP 5493. ATR 88.5. MTP 6928. MTR 95. ISIP 2259. FG.80. TCF 5104. 20:15 22:00 1.75 P STG11 21 PERF WL STAGE # 11. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,379', PU & PERF STAGE # 11 ON THE FLY AT 12,215' - 12,363' OA PERFS, POH ALL SHOTS FIRED. PUMPED 429 BBLS. STANDBY FOR "LH" FRAC 22:00 01:30 3.50 P STG11 73 WOOWO STANDBY FOR SIM-OPS "JH" FRAC & "LH" WIRELINE. 01:30 02:45 1.25 P STG11 35 STIM FRAC STAGE #11 SLICKWATER 200- SICP 1551. PUMPED 129,180 LBS 100 MESH @.5-2.0 PPA ; 160,120 LBS 4070 @.75-2.5 PPA. ATP 5649. ATR 89.1. MTP 6779. MTR 98.4. ISIP 2264. FG.805. TCF 4990. 02:45 04:30 1.75 P STG12 21 PERF WL STAGE # 12. RU WL ON WELL. TEST WLPCE TO 7000 PSI. RIH W 5.5" SUPERIOR CFP & 8-1' X 3.125" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W MARKER JT AT 5,435'. PUMP DOWN & SET PLUG @ 12,197', PU & PERF STAGE # 12 ON THE FLY AT 12,029' - 12,181' OA PERFS, POH ALL SHOTS FIRED. PUMPED 418 BBLS. STANDBY FOR "LH" FRAC 04:30 05:30 1.00 P STG12 73 WOOWO STANDBY FOR SIM-OPS "JH" FRAC & "LH" WIRELINE. 05:30 06:00 0.50 P STG12 28 SFTYMTG HOLD HSE MEETING WITH DAY CREW Comments: Size(in) MD(ft)TVD(ft) LOT(ppg) 993.00 993.00 13.375 65.00 65.00 Date Stage Top Bottom SPF(ft) FGBHP(ft) Separation Method Comments Printed: 252015 8:19:10AM