EP WELLS DAILY OPERATIONS REPORT Report 14 05/04/2017

Similar documents
1, Total Depth (All) (ftkb) Original Hole - 20, ,929, Wind Temperature ( F) Road Condition

Daily Drilling Report Onshore

2/4/15 SAU 1220DH WOCS: Aaron Auld Rig: WSI wireline/ rigless

AMERICAN ENERGY - PERMIAN BASIN, LLC Daily Completion Report UNIVERSITY SR HS AEPB WELL NO. 115

Frac Talk Laura Schafer 4 March 2016

Oil & Gas. Simplified Frac Iron System

How to Simplify Your Frac Site. Presented by Firstname Surname, Job Title

Optimizing Perforating Charge Design

Optimizing Completion Technology for Eastern European Shales

PTTC/DOE/RPSEA Gas Shales Workshop Marcellus Shale Hydraulic Fracturing

JJ Joubert is a Data Architect and unofficially official PPDM advocate at Drilling Info. Currently he is working specifically with Completion data,

FracHOOK TM MULTILATERAL FRACTURING SYSTEM

SPE Copyright 1999, Society of Petroleum Engineers Inc.

Frac Manifold Systems. Increase operational efficiencies of simultaneous completion operations

STERN TUBE SEAL STERN KEEPER C-TYPE MANUAL

The Evolution of. Hydraulic Fracturing In the Bakken Petroleum System

10XE AND 15XE Electric High-Pressure Washer

Confessions of a Frac Engineer: Your Reservoir is Much More Productive than we Thought It s my Frac that is Failing. Outline

Trends extracted from 1,200 Gulf Coast blowouts during

Operating Instructions

Suspensions. Pinlock Easy to adjust. firm hold. Simply squeeze the buckle tabs to loosen the band and slide to tighten. Ratchet Feature an extra

JIP TO IMPROVE EAGLE FORD HYDRAULIC FRACTURING TECHNOLOGY

Operating Instructions

Big Sky Product Information Sheet. System 10 Acrylic Enamel Color System

10 Optidome. AMODEX, 3% Hydrogen Peroxide

FOOD GRADE EQUIPMENT LUBRICANTS

Flame Seal-TB General Information and Application Procedures

Shale Gas World. Warsaw, 25 th November July Joel Price, COO. Lewino-1G2 Results. Lewino-1G2 Frac

ALL ITEMS ON THIS PACKING LIST MUST BE CLEAN, SERVICEABLE AND IN WORKING ORDER IAW TM &P (CH 2) DATE 1 OCT BASIC LEADER COURSE

Adabot Operation Game

WRITTEN HAZARD COMMUNICATION PROGRAM

THUNDER BAY REGIONAL RESEARCH INSTITUTE STATEMENT of POLICY and PROCEDURE Manual: Joint Health & Safety SPP No. JH Section: Issued: May 6, 2011

Owner s Manual. Table of contents 2. Introuduction & Safty Standard 3. Important considerations 4. Identify Parts & Description 5.

Galleria area. North. West Richmond Ave. Houston, TX P. (713) F. (832) E.

PARTS LIST FOR WC-150-0ME3 WATER CANNON. Copyright 2000, Mi-T-M Corporation Issue Date:

The Scream: Interactive Screaming Painting

PARTS LIST FOR WC-100-0ME3 WATER CANNON. Copyright 2000, Mi-T-M Corporation Issue Date:

FINAL UTILITY REPORT WILLOW BEND SUBDIVISION Thornton, CO

Zanjoe Incorporation

Alarm.com Wi-Fi Doorbell Camera and Slim Line

TenarisXP Buttress Connection

Touch IoT with SAP Leonardo Wardrobe with a difference SAP SE or an SAP affiliate company. All rights reserved. Public

Xzilon3 Application Instructions

PPE Information Sheet Protective Clothing for the Body

Dangerous Things DIY RFID Implantation Guide Written by Amal Graafstra

FIRE MAX 3. Next generation protection and wearing comfort.

Technology to Defend Against Cold Stress

HORRY COUNTY FIRE RESCUE DEPARTMENT PROUD * PREPARED * PROFESSIONAL STANDARD OPERATING GUIDELINE SOG 406 UNIFORM POLICY

CANDY CONCENTRATES TECHNICAL DATA SHEET

The Pennsylvania State University. The Graduate School. Department of Energy and Mineral Engineering

HAZARD COMMUNICATION PROGRAM

Milk Jug Glow Skull. Created by John Park. Last updated on :28:36 PM UTC

High volume aerial applications on Redberry Juniper

Circuit Playground Express Head-Tilt Ears

Owner s Manual. Maintenance for Pipeless (Sanijet ) 12, 13. Maintenance for Standard Pedicure Spa (Whirlpool Pump) 15, 16

Crickit Powered Holiday Diorama

US Proppant Market & Forecast Report: 2015 to 2020

Product Data EX-408 Epoxy ZP Primer

Head Protection Standard

FR Disposable Clothing Guide

Alarm.com Wi-Fi Doorbell Camera and Slim Line - Installation Guide

Rubber Insulating Gloves Care/Storage/Inspection

University of Wisconsin-Madison Hazard Communication Standard Policy Dept. of Environment, Health & Safety Office of Chemical Safety

Chevron Material Safety Data Sheet

Best Way To Put Velcro Rollers In Your Hair

ROSHIELD 3188 Self-Crosslinking Acrylic Emulsion For Sanding Sealers and Clear Topcoats Over Wood

SAFETY MADE EASY. The Importance of Hand Protection in the Workplace. FT Work Safety Awareness

OMNI Coupling System. Cast Couplings Straight & Reducing Transitions IMPORTANT LINKS. Description: Cast Couplings

SURE-COAT TECHNICAL DATA SHEET

Wood Window Repair 101

Reindeer Mask with Animated Eyes

Workshop Manual, Seal handbook part

Adafruit Capacitive Touch Sensor Breakouts

FLAKES, LIGHTNING FX & PASTE PEARLS TECHNICAL DATA SHEET

Adafruit LED Sequins. Created by Becky Stern. Last updated on :00:06 PM EST

SUTTER COUNTY DEVELOPMENT SERVICES DEPARTMENT

MISCELLANEOUS ITEMS F001 HARD PLASTIC CAP RUBBER KNEE PADS T13A KNEE PADS T13A HARD PLASTIC CAP RUBBER FOAM KNEE PADS KNEE PADS

Welcome to the Catkiller Store!

CONTENTS SIZING MENS SIZES JUNIOR SIZES WOMENS SIZES SOCK SIZES XS S M L XL 2XL 3XL 4XL 5XL 6XL SB MB LB

Making a Bangle Bracelet using a Metal Core from Arizona Silhouette

1 A 2 A 3 B 3 A. Legend W White B Bronze S Silver (Gray) K Black T Beige M Mill. Figure No.

Advantages of PVC chemical resistance for pressure pipes

Service Request W-2 Changes. Technical Specification. Created on: 8/16/2017 Modified 01/23/2018. Prepared by Mary Meyer

Calipers. Created by Ladyada

AT Canon ip3000 CISS Instruction

TECHNICAL INFORMATION

POST-PROCESSING YOUR 3D PRINTS

AFS Environmental Health & Safety Conference Nashville, TN August 24, 2010

Performance Standard Why is it Important? Medical Grade Benchmark Robinson Healthcare Product

Lenis Needle-free Safety Syringe Device User Manual

INFECTION PREVENTION AND CONTROL PLAN

2018 Apparel Net Pricing Guide

For the Complainant: Susan M. Williams, Esq., Office of the Solicitor, U.S. Department of Labor, Dallas, Texas DECISION AND ORDER

Winter Dress Blue. Reviewed, DIR-T USCGAUX 21

CCS Administrative Procedure T Biosafety for Laboratory Settings

Wind Blowing Emoji Prop

Tradition, Innovation and Excellence

Code of Practice for Temporary Traffic Management (CoPTTM)

Hair Entanglement/Entrapment Testing. ASME-A Suction Covers. Human Subjects and Wigs

Big Sky Product Information Sheet. CRV21 Crystal Clear 2.1 VOC Universal Clearcoat

Transcription:

5/5/27 5:5:26 Report Version: 4..6R9 Report 4 5/4/27 Company Type WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H 32656 / 4233326. Event Summary Event Type Completion only Event Start Date 4/5/27 Days on Location 4. Objective Install Completion Original Spud Date /9/27 Est. Days 3. Contractor PERMIAN WELL SVC Work Unit PERMIAN COMPLETIONS Days To Release Rig Phone/FAX No. Status Supervisor W. Garver / E. Huls Measured Depth(ft) Engineer ALEJANDRO VILEGAS TVD(ft) Other Supervisor T. Hurdle 24 Hr Progress(ft) Depth Ref/Grd Elev/Water Depth(ft) DFE: 2,769.5 / 2,743.5 Hole size(in) THF Datum Daily (hr/%) 8.58/8.33 Days Ahd(-) Bhnd(+)(5/5) Actual cost to date/afe 82,63/5,366,66. Last Casing MD Next Casing MD Current MW / BH EMW(ppg) / Actual divided by AFE Daily Cost.5 8,958 LOT/FIT EMW(ppg) Lithology Formation/MD Top Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure(psi) Safety Comments: Total Employees - 95 Total Man Hours - 56 Total Driving Hours - 8 Drill Category Drill Type Detection (sec) Drills Complete (sec) Crew drilled Pass / Fail PIC Comments HSE Drills Muster Drill 9. Day Pass Drills/Tests Date Days Since Last HSE Drills Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 3 24 Hour Summary Nipple up replacement UMV and tested. Perf and Frac Stg 6 Update Since Report Time Operations Summary

5/5/27 5:5:26 Report Version: 4..6R9 2 UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H Report 4 5/4/27 24 Hour Forecast Continue Frac Ops

5/5/27 5:5:26 Report Version: 4..6R9 3 UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H Report 4 5/4/27 Time Summary Rig Rate : 2.75 FRAC NOA 2 Wait on Weather due to high winds 45-55mph 2:45 6:3 3.75.5 FRAC FRP Filled frac tree and iron with fresh water to purged air. Pressure test low 5 psi 5 min and high 95 psi - minutes. R/U the down joints to connect the frac trees to the manifold. Setup restraints. Held Pre-Tower Safety Meeting. 7:.42 Continue to rig up stand pipes. 7:25.8 ****Muster Drill conducted, time-9 sec. 7:3 8: 8:5 2:5.5.25 4.58.83 Align valves and prime up trucks. PT frac lines/zipper/all three trees. Test failed, hydraulic valve leaking on the zipper 58H section. Pause, discuss removing stand pipes,hydraulic valve, pinch points, good communication, DSP's, having a plan, tag lines and stop the job authority. Remove stand pipes, ND goathead/hydraulic valve. Replace leaking hydraulic with new hydraulic valvle. NU to 58H zipper manifold. RU stand pipes. Prime up trucks, set up to PT frac lines/zipper manifold. PT good. 3:4.8 Equalize pressure, align valves, set up to pump down 58H. 3:45 3:49.7.97 Open well, WHP-4 psi, Pump 3 bbls down 58H. SIW. Bleed off pressure. Walk lines and prep for frac and WL ops. Wait on other ops. 4:47 2.97 FRAC NOA *** STOP GE**** PT passed. Wait on other ops. 7:45 7:57.2.8 FRAC WLT FRAC WLT Pick up lubricator. Remove night cap. PU guns/plug. Stab lubricator. Fill lubricator. PT lubricator to k-8kpsi. Open well with psi. "Stage #6 Plug and Perf RIH with (4) ' Keane guns: 2.75"" OD HSC at 6SPF with 6* phased perforating guns and Downhole Technology Boss Hog composite frac plug. Tie into liner top @9. Bring on pumps at 5'. Pump down as follows: 3bpm @ 38psi @5 6bpm @ 42psi @7 9bpm @ 48psi @8 2bpm w/ 6psi @2 5bpm w/ 67psi @22 5bpm w/ 69psi @28 5.2bpm w/ 7327psi @938 2: 2:4.67 2.42 Set plug @ 2922ft Perforate as follows: 294' - 295' 286' - 286' 286' - 287' 277' - 2772' Stabilized pressure after perf: 4545psi Pump down volume: 32bbl" POOH FRAC WLF Bump up and SIW @ 425. Bled off pressure and break lubricator. Lowered Perf guns out of lubricator and confirmed all shots fired. Drop ball, N/U nightcap and close crown valve. L/D perf guns and P/U next set of guns for next run. Move WL BOP's to next well. Greased UMV & Wing - grease time min. FRAC FRT Stage 6 Summary University 9 PW Unit 56H Interval 2675-28 Open Pressure 3,98 psi Max Treating Pressure 9,359 psi Max Slurry Rate 53.6 bpm Average Treating Pressure 8,89 psi Average Slurry Rate 49.4 bpm Breakdown Pressure 7, psi

5/5/27 5:5:26 Report Version: 4..6R9 4 UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H Report 4 5/4/27 Time Summary Rig Rate Breakdown Rate 9.6 bpm Breakdown Volume 9,782 gal Avg HHP,764 hp Final ISIP 5,35 psi Frac Gradient.895 psi/ft Pad Volume 7,85 gal Main Body Volume 22,768 gal Flush Volume 33,56 gal 3/5 AZ Sand Pumped lbs Mesh Sand Pumped 47,22 lbs Proppant in Formation 47,22 lbs Avg Proppant Concentration 2.89 lb/gal Max Proppant Concentration 4.4 lb/gal Load to Recover 5,66 bbls Load to Recover w/o Acid 5,54 bbls 5% HCL Spearhead 5 gal Slickwater Fluid Pumped 4,662 bbls 2# Linear Fluid Pumped 8 bbls 2# Crosslink Fluid Pumped bbls Pump down volume 32 bbls pump down rate 5.2 bpm Max pump down pressure 7,327 psi Fluid Temp 72.?F Total Pump Time 2:3 hr:min Pumps Lost During Job Treatment Start Time 2:52 : : Treatment End Time 22:55 : : Diverter Slurry bbls All sand placed. Pumped 5 gals of 5% HCL, Pumped sand in Ramp from.5 PPA - 3. PPA, 3. PPA, 3.5.PPA and 4. PPA. 23:5.8 FRAC FRT SIW @ 485. Bleed off pressure. HO to WL 23:.83 FRAC OPO Other Ops Total 23.3 6. Update :.58 FRAC OPO Other Ops :35.42 FRAC WLT Pick up lubricator. Remove night cap. PU guns/plug. Stab lubricator. Fill lubricator. PT lubricator to k-8kpsi. Open well with psi. 2: 2.33 FRAC WLT "Stage #7 Plug and Perf RIH with (4) ' Keane guns: 2.75"" OD HSC at 6SPF with 6* phased perforating guns and Downhole Technology Boss Hog composite frac plug. Tie into liner top @,9'. Bring on pumps at,'. Pump down as follows: 3bpm @ 45psi @, 6bpm @ 46psi @, 9bpm @ 48psi @,2 2bpm w/ 5psi @,35 5bpm w/ 54psi @,45 Max Rate 5bpm w/ 6,99psi Set plug @ 2,749ft Perforate as follows: 2,727' - 2,728' 2,683' - 2,684' 2,638' - 2,639' 2,597' - 2,598' Stabilized pressure after perf: 4,66psi Pump down volume: 232bbl" POOH wait at 2' for Frac to finish.

5/5/27 5:5:26 Report Version: 4..6R9 5 UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H Report 4 5/4/27 6. Update 4:2.42 FRAC WLF Bump up and SIW @ 464. Bled off pressure and break lubricator. Lowered Perf guns out of lubricator and confirmed all shots fired. Drop ball, N/U nightcap and close crown valve. L/D perf guns and P/U next set of guns for next run. Move WL BOP's to next well. Greased Crown and Hyd - grease time min. 4:45 FRAC FRT Summary Start Date/Time Responsible Company Code Failure MD (ft) Ops Code Type* Equipment Type Net time (hr) Gross time (hr) Severity Status 5/4/27 : SHELL Wait On Weather NOA N 2.75 2.75 OPEN : High Winds Title: WOW Total 2.75 2.75