AMERICAN ENERGY - PERMIAN BASIN, LLC Daily Completion Report UNIVERSITY SR HS AEPB WELL NO. 115

Similar documents
1, Total Depth (All) (ftkb) Original Hole - 20, ,929, Wind Temperature ( F) Road Condition

2/4/15 SAU 1220DH WOCS: Aaron Auld Rig: WSI wireline/ rigless

EP WELLS DAILY OPERATIONS REPORT Report 14 05/04/2017

Daily Drilling Report Onshore

Frac Talk Laura Schafer 4 March 2016

How to Simplify Your Frac Site. Presented by Firstname Surname, Job Title

Oil & Gas. Simplified Frac Iron System

Optimizing Completion Technology for Eastern European Shales

JJ Joubert is a Data Architect and unofficially official PPDM advocate at Drilling Info. Currently he is working specifically with Completion data,

Frac Manifold Systems. Increase operational efficiencies of simultaneous completion operations

Optimizing Perforating Charge Design

PTTC/DOE/RPSEA Gas Shales Workshop Marcellus Shale Hydraulic Fracturing

FracHOOK TM MULTILATERAL FRACTURING SYSTEM

10XE AND 15XE Electric High-Pressure Washer

Operating Instructions

TenarisXP Buttress Connection

Operating Instructions

STERN TUBE SEAL STERN KEEPER C-TYPE MANUAL

GAR Labs is a large Skin Care & Hair Care Manufacturer

FOOD GRADE EQUIPMENT LUBRICANTS

Trends extracted from 1,200 Gulf Coast blowouts during

SPE Copyright 1999, Society of Petroleum Engineers Inc.

SM - HIGH PRESSURE ALL METAL FLOWMETER AND SWITCH

Zanjoe Incorporation

Flame Seal-TB General Information and Application Procedures

Workshop Manual, Seal handbook part

Shale Gas World. Warsaw, 25 th November July Joel Price, COO. Lewino-1G2 Results. Lewino-1G2 Frac

Owner s Manual. Table of contents 2. Introuduction & Safty Standard 3. Important considerations 4. Identify Parts & Description 5.

OMNI Coupling System. Cast Couplings Straight & Reducing Transitions IMPORTANT LINKS. Description: Cast Couplings

TECHNICAL INFORMATION Adhesive-Side Powder Development Catalog Nos. ASP150, ASP50D, ASP50L, TRA20

Reindeer Mask with Animated Eyes

FINAL UTILITY REPORT WILLOW BEND SUBDIVISION Thornton, CO

STRING LINES. If the frame is not fitted straight plumb and level the doors will not function correctly.

JIP TO IMPROVE EAGLE FORD HYDRAULIC FRACTURING TECHNOLOGY

Improvement of Grease Leakage Prevention for Ball Bearings Due to Geometrical Change of Ribbon Cages

Metal And Canvas Double Robe

The Pennsylvania State University. The Graduate School. Department of Energy and Mineral Engineering

Muskogee Public Schools Custodial Procedures for Carpet Care

FOR REFERENCE ONLY. TASK Hazards Who is at risk? Rick Level Mitigation Measures required: Working in unfamiliar environments for exhibition/event

HYDRAULIC COMPONENTS HYDROSTATIC TRANSMISSIONS GEARBOXES - ACCESSORIES HT 12 / A / 352 / 1212 / E

MEDICAL WASTE MANAGEMENT

Milk Jug Glow Skull. Created by John Park. Last updated on :28:36 PM UTC

Owner s Manual. Maintenance for Pipeless (Sanijet ) 12, 13. Maintenance for Standard Pedicure Spa (Whirlpool Pump) 15, 16

Hammer Time Mini Golf Hazard with Crickit

Comparative Proteomics Kit II: Western Blot Module Quick Guide

Positive-Turn Reverse Parts Manual

WINDOWS, DOORS AND FAÇADE ELEMENTS MADE OF ALUMINIUM. Operation, maintenance and care

Artesian Pedicure System

Procedures and Practices for Flexo News Inks

Big Sky Product Information Sheet. System 10 Acrylic Enamel Color System

Performance Standard Why is it Important? Medical Grade Benchmark Robinson Healthcare Product

PARTS LIST FOR WC-150-0ME3 WATER CANNON. Copyright 2000, Mi-T-M Corporation Issue Date:

PROFESSIONAL SPOTTING KIT

PARTS LIST FOR WC-100-0ME3 WATER CANNON. Copyright 2000, Mi-T-M Corporation Issue Date:

3D Printing Guide: MakerBot Replicator 2X

Application Guide. Manual Applicators 16 Floor Coating Foam Pad, 18 Paint Tray, NylFoam Stain Pad, Foam Brush, Wiping Rags, Sponges.

FIRE RESTORATION PRODUCTS

online for convenience

THUNDER BAY REGIONAL RESEARCH INSTITUTE STATEMENT of POLICY and PROCEDURE Manual: Joint Health & Safety SPP No. JH Section: Issued: May 6, 2011

DOWSIL 9040 Silicone Elastomer Blend

L E N O X OWNER S MANUAL. Please read user s Manual thoroughly before using pedicure spa. Product of J&A Copyright 2010 by J&A USA Inc.

Section 6 Marking & Identification

PEDICURE SPA USER MANUAL

The Evolution of. Hydraulic Fracturing In the Bakken Petroleum System

Urine Collection Kit. just between us. This kit contains: Before you begin! Access Key label here

sign hangers & sign holders

These are the same tools I use to get airbrushes. clean and pristine. Kirk Lybecker Iwata Technical Services

GPS Logging Dog Harness

Confessions of a Frac Engineer: Your Reservoir is Much More Productive than we Thought It s my Frac that is Failing. Outline

Xzilon3 Application Instructions

US Proppant Market & Forecast Report: 2015 to 2020

Crawling Animatronic Hand

So... You Want To Use The 3D Printers

University of Wisconsin-Madison Hazard Communication Standard Policy Dept. of Environment, Health & Safety Office of Chemical Safety

Prevailing Wage Rates

Making a Bangle Bracelet using a Metal Core from Arizona Silhouette

Crickit Powered Holiday Diorama

2 in 1Hydro peel machine

Bunny Ears with MakeCode

3D Printed LED Goggles

Mad Science Test Tube Rack

Wood Window Repair 101

B-SERIES CONVERSION INSTRUCTIONS

INFECTION PREVENTION AND CONTROL PLAN

Hayes Performance Systems 5800 W. Donges Bay Rd. Mequon, WI Tel: Web:

ACTIVE GEL HEALTHY IN PARTNERSHIP WITH

Biohazardous Waste. 1. Solid Biohazardous Waste (non-sharps) Storage

STOLLOWEEN. Fluffy

Tender Notice No. DGVCL/SP/10048/Ind. Safety Shoes, PVC Boot & Rain Coat. Item No. 1 : Specifications of Industrial Safety Shoes

Fume Hood ECON VAV Controls

10 Optidome. AMODEX, 3% Hydrogen Peroxide

Glowing Smokey Skull. Created by Ruiz Brothers. Last updated on :03:40 PM UTC

Gear case. Part Number OEM Number Description Product Photo. Standard: Ø28mmx11T Gear case assy. Standard: M5x25 + M6x25 Bracket assy

EMS Standard Operating Procedures Policy Title:

FLAKES, LIGHTNING FX & PASTE PEARLS TECHNICAL DATA SHEET

ATS-SOI-5731 Page: 1 of 5. Approval Block. Prepared by: Signature Date Margaret Crouse 18 JUN Reviewed by: Signature Date

SECTION UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS: CONDUIT SYSTEMS FOR USE IN CORROSIVE ENVIRONMENTS

Product Data 367 Acrynamel

Eye and Face Protection

Printed: 10 APR :37 AM. Page 1 of 11 38" STAR DOBBY DRESS 11 NOV :26 PM TB7JYW 10 APR :36 AM TB8AXB

Transcription:

AMERICAN ENERGY - PERMIAN BASIN, LLC AEPB WELL NO. 115 4/10/16 Number of s (ft) Primary Job - ORIGINAL 57 Ground Elevation (ft) RKB (ft) Secondary Job 10,000 4/8/16 27,948 CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, AEPB 0 NPT, 0 EHS ISSUES ; MIRU C&J SERV. RIG FOR CLEAN OUT AND TCP, RIH WITH 4 5/8 VERRAL SEALED BEARING BIT, 5-1/2" CASING SCRAPER,2-7/8" PH-6 STRING FLOAT, 2 7/8" 7,9# P110 TUBING, LOAD TUBING EVERY 50 JOINTS WITH FRESHWATER TREATED WITH BIOCIDE,STARTED FIGHTING FRICTION AT 11,776 FT (JOINT 381) AT 11.909 FT ( JOINT 385) PUMPED 10 BBL HIGH VISC SWEEP FOLLOWED WITH FR CIRCULATED TO SURFACE, CONTINUING TO TIH ; CURRENT DEPTH AT TIME OF REPORT IS 12,002 FT CONTINUE CLEAN OUT AND TCP WITH SERVICE RIG Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd Typ NPT 05:00 10: 5.50 5.50 INACTIVE WAITING ON SERV. RIG 10: 10:45 0.25 5.75 SAFETY MEETING PJSM 10:45 17:45 7.00 12.75 RIG UP/DOWN MIRU SERV. RIG AND ALL RELATED EQUIPMENT 17:45 19:00 1.25 14.00 RUN TUBING RIH WITH 4 5/8 VERRAL SEALED BEARING BIT, 5-1/2" CASING SCRAPER, X-OVER SUB 1 JOINT OF TUBING THAN A 2-7/8" STRING FLOAT, 2 7/8" 7,9# PH6 TUBING, LOAD TUBING EVERY 50 JOINTS WITH FRESHWATER TREATED WITH BIOCIDE 19:00 19:15 0.25 14.25 SAFETY MEETING PJSM WITH NIGHT SHIFT 19:15 03:15 8.00 22.25 RUN TUBING CONTINUE RIH 03:15 04: 1.25 23.50 CLEAN OUT AT 11,776 FT (381 JOINTS IN ) STARTED FIGHTING FRICTION, PUMPED 10 BBL HIGH VISC SWEEP, FOLLOWED BY FR PUMPING AT 4 BPM, RETURNED SWEEP TO SURFACE 04: 05:00 0.50 24.00 RUN TUBING CONTINUE TO RIH Time Inspected By Description 10: SAFETY MEETING JASON COLLINSWORTH PJSM 19:00 SAFETY MEETING JUSTIN STRINGER PJSM Workover Rig Contractor C & J Bit Information Size (in) 4 5/8 Rig Number Make Model Length (ft) 0.56 Perforation Intervals Bit ROCK BIT Serial Number Rig SERVICE Time Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 472,353 Depth In (ft Depth Out

AMERICAN ENERGY - PERMIAN BASIN, LLC AEPB WELL NO. 115 4/11/16 Number of s (ft) Primary Job - ORIGINAL 57 Ground Elevation (ft) RKB (ft) Secondary Job 10,000 4/8/16 26,598 CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, AEPB 0 NPT, 0 EHS ISSUES; CONTINUE TO TIH W/BHA AND WORKSTRING,DUE TO FRICTION AT 458 JTS., (14163') RU TO PUMP BOTTOMS UP W/ FR;AFTER BOTTOMS UP W/FR PIPE WAS STILL STICKY; PUMP A SLUG OF POP AT.25/10 FOR ANOTHER BOTTOMS UP;POP DID NOT WORK; RU SWIVEL; TIH WITH POWER SWIVEL AND BHA WORKSTRING ;DUE TO FRICTION AT JOINT 524 (16,222') CIRCULATE 10/10/10 BBL HIGH VISC SWEEP BOTTOMS UP, GETTING CEMENT TAILINGS IN THE RETURNS CONTINUE TO TIH WITH POWER SWIVEL AND BHA WORKSTRING.TIH W/SWIVEL BHA AND WORKSTRING, STILL GETTING LIGHT CEMENT IN RETURNS, STARTED GETTING HEAVY CEMENT IN RETURNS AT JOINT 5 (16,312 FT ) AT JOINT 538 (16,575 FT) ONLY AVERAGING 41.6 FT PER HOUR SEEING HEAVY CEMENT IN THE RETURNS, DECISON WAS MADE TO PUMP A SWEEP FOLLOWED WITH FRESH WATER AND BECCA LUBE AT.50 GAL/10BBLS AND POOH STANDING BACK IN THE DERRICK, ORDER NEW BHA,, LAYING DOWN POWER SWIVEL START PULLING STANDS AT TIME OF REPORT POOH STANDING BACK IN THE DERRICK, RUN NEW BHA TO MILL CEMENT Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd Typ NPT 05:00 06:15 1.25 1.25 TRIPPING TIH W/ BHA AND WORKSTRING 06:15 07:45 1.50 2.75 CLEAN OUT DUE TO FRICTION AT 458 JTS., (14163') RU TO PUMP BOTTOMS UP W/ FR 07:45 09:15 1.50 4.25 CLEAN OUT AFTER BOTTOMS UP W/FR PIPE WAS STILL STICKY; PUMP A SLUG OF POP AND.25/10 FOR ANOTHER BOTTOMS UP 09:15 10:15 1.00 5.25 RIG UP/DOWN POP DID NOT WORK; RU SWIVEL 10:15 18:00 7.75 13.00 TRIPPING TIH W/SWIVEL BHA AND WORKSTRING 18:00 19: 1.50 14.50 CLEAN OUT DUE TO FRICTION AT JOINT 524 (16,222') CIRCULATE 10/10/10 BBL HIGH VISC SWEEP BOTTOMS UP, GETTING CEMENT TAILINGS IN THE RETURNS. 19: 03:15 7.75 22.25 TRIPPING TIH W/SWIVEL BHA AND WORKSTRING, STILL GETTING LIGHT CEMENT IN RETURNS, STARTED GETTING HEAVY CEMENT IN RETURNS AT JOINT 5 (16,312 FT ) AT JOINT 538 (16,575 FT) ONLY AVERAGING 41.6 FT PER HOUR SEEING HEAVY CEMENT IN THE RETURNS, DECISON WAS MADE TO PUMP A SWEEP FOLLOWED WITH FRESH WATER AND BECCA LUBE AT.50 GAL/10BBLS AND POOH STANDING BACK IN THE DERRICK, ORDER NEW BHA 03:15 04:45 1.50 23.75 CLEAN OUT PUMP HIGH VISC SWEEP AND FRESH WATER WITH BECCA LUBE.50GAL/10BBL 04:45 05:00 0.25 24.00 GENERAL OPERATIONS LAY DOWN POWER SWIVEL TO START PULLING STANDS NPT Problem OTHER SubTyp OTHER Description TRICAN BPS FAILED TO OPEN 4/8/16 Failed Item Accountable Party TRICAN WELL SERVICE Time Inspected By Description 05:01 SAFETY MEETING JASON COLLINSWORTH PJSM 17:00 SAFETY MEETING JUSTIN STRINGER PJSM Workover Rig Contractor C & J Bit Information Size (in) 4 5/8 Rig Number Make Model Length (ft) 0.56 Perforation Intervals Bit ROCK BIT Serial Number Rig SERVICE Time Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 498,540 Dur Depth In (ft Depth Out

AMERICAN ENERGY - PERMIAN BASIN, LLC AEPB WELL NO. 115 4/12/16 Number of s (ft) Primary Job - ORIGINAL 57 Ground Elevation (ft) RKB (ft) Secondary Job 10,000 4/8/16 28,875 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, AEPB; COMP SUPER, WES WILSON, NEW TECH; COMP SUP, DAN CURTIS, NEW TECH 0 NPT, 0 EHS ISSUES; FINISH PULLING OUT WITH BIT AND SCRAPPER, RIG UP NEW BHA TO DRILL CEMENT. MU 4 5/8 DRAG BIT, MOTOR, AGITATOR, AV SUB, JARS, BPV, FLOAT SUB, 1 JT, FLOAT SUB, 1 JT, RN NIPPLE. RUNNING IN WITH BHA ; WASH WITH SWIVEL FROM JT 537 (16644) TO JT 551 (17079), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 2800 PSI; RETURNS LIGHT CEMENT; CHEMS PIPE ON PIPE.25 /10, PUMP 10 BBL.25/10 SLUG OF BECCA LUBE EVERY 4 JTS TO HELP WITH FRICTION; CIRCULATE 10 BBL 80 VIS SWEEP TO SURFACE LIGHT CEMENT IN RETURNS; CONTINUE WASHING WITH SWIVEL JT 551 (17079) TO JT 556 (17254), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS TRACE OF CEMENT; CHEMS PIPE ON PIPE.25 /10, PUMP 10 BBL SLUG OF BECCA LUBE EVERY 4 JTS; FIGHTING FRICTION SEVERAL STALLS ON SWIVEL; NOT SEEING ANY DIFF PRESSURE SHOWING INDICATIONS OF CEMENT. DRILL OUT CEMENT Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd Typ NPT 05:00 07:00 2.00 2.00 TRIPPING TOH STANDING BACK 07:00 07:15 0.25 2.25 SAFETY MEETING DISCUSSED TODAY'S ACTIVITIES, PINCHPOINTS, TRIP HAZARDS, EMERGENCY PROCEDURES, RANCH RULES, SPEED LIMIT, HOUSE KEEPING. 07:15 12:45 5.50 7.75 TRIPPING FINISH OUT OF WITH BHA. SCRAPPER AND 4 5/8 JZ BIT IN GOOD SHAPE. CLOSE BOP'S. PREPARE TO INSTALL NEW BHA MOTOR TO DRILL CEMENT. 12:45 13:45 1.00 8.75 RIG UP/DOWN RIG UP TOP NOTCH BHA: ITEM LENGTH DRAG BIT 4.625' MOTOR 13.81' AGITATOR 4.' AV SUB 0.56' JARS 4.60' BPV 1.40' X-OVER 0.64' FLOAT SUB 1.85' FLOAT SUB 1.82' RN NIPPLE 1.00' TOTAL LENGTH =.28 FEET TEST MOTOR AND ALL COMPONENTS, GOOD TEST (3.5 BPM AT 1,800 PSI) 13:45 14: 0.75 9.50 TRIPPING START TRIPPING IN WITH BHA 14: 15:00 0.50 1 GENERAL OPERATIONS STOP ON JT 100, LOAD TUBING WITH FRESH WATER TREATED WITH BIOCIDE. PUMP BBLS. 15:00 18:00 3.00 13.00 TRIPPING CONTINUE TRIPPING IN WITH BHA, JT 537 (16644) 18:00 18:45 0.75 13.75 RIG UP/DOWN PU POWER SWIVEL AND TIE BACK FAST LINE. 18:45 19:00 0.25 14.00 SAFETY MEETING TALKED ABOUT TODAY'S ACTIVITIES, GOOD HOUSE KEEPING, PINCH POINTS AND PROPER PPE 19:00 01:00 6.00 2 CLEAN OUT WASH WITH SWIVEL FROM JT 537 (16644) TO JT 551 (17079), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 2800 PSI; RETURNS LIGHT CEMENT; CHEMS PIPE ON PIPE.25 /10, PUMP 10 BBL.25/10 SLUG OF BECCA LUBE EVERY 4 JTS TO HELP WITH FRICTION. 01:00 02:00 1.00 CLEAN OUT TO SURFACE FOLLOWED BY 5 BBL SLUG OF BECCA LUBE 02:00 05:00 3.00 24.00 CLEAN OUT WASH WITH SWIVEL JT 551 (17079) TO JT 556 (17254), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS TRACE OF CEMENT; CHEMS PIPE ON PIPE.25 /10, PUMP 10 BBL SLUG OF BECCA LUBE EVERY 4 JTS. NPT Problem OTHER SubTyp OTHER Description TRICAN BPS FAILED TO OPEN 4/8/16 Failed Item Accountable Party TRICAN WELL SERVICE Time Inspected By Description 05:01 SAFETY MEETING JASON COLLINSWORTH / DAN CURTIS PJSM 17:00 SAFETY MEETING JUSTIN STRINGER/ WES WILSON PJSM Workover Rig Contractor C & J Bit Information Size (in) 4 5/8 Rig Number 778 Make Model Length (ft) 0. Bit MILL Serial Number NN Rig SERVICE 532,067 Dur Depth In (ft Depth Out Drillout Parameters te Drilling Time (hr) Start Depth (ftkb) End Depth (ftkb) SPP (psi) P Surf Annulus (psi) WOB (1000lbf) RPM (rpm) Drilling Torque PU Str Wt (1000lbf) SO Str Wt (1000lbf) Current BHA Components BHA Item Description 1 DRILL PIPE Perforation Intervals Make Model OD (in) 2 7/8 Joints Length (ft) Top Thread Fishing Neck OD (in) FN Len (ft) 556 17,254.00 Time Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com

AMERICAN ENERGY - PERMIAN BASIN, LLC AEPB WELL NO. 115 4/13/16 Number of s (ft) Primary Job - ORIGINAL 57 Ground Elevation (ft) RKB (ft) Secondary Job 10,000 4/8/16 34,469 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, AEPB; COMP SUPER, WES WILSON, NEW TECH; COMP SUP, DAN CURTIS, NEW TECH 0 NPT, 0 EHS ISSUES; CONTINUE WASHING TO BOTTOM, FROM JT 557 (17266) TAG I-SEAT WITH JT 572 (17757), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS CEMENT, PUMP 10/10/10 80 VIS SWEEP; MIRU OTEX PUMP TRUCK, PRESSURE TEST LINES TO 4500 PSI, PUMP 500 GAL OF 15% HCL AND DISPLACE WITH 95 BBL OF WATER, SPOTTED AT 17757', RDMO OTEX PUMP TRUCK; TOH WITH SWIVEL 3 JTS PULLED OFF 85 KLBS BOTTOM, LD SWIVEL; TOH LAYING DOWN 40 JTS AND STANDING BACK IN DERRICK 578,377 DRILL OUT CEMENT Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd Typ NPT 05:00 07:00 2.00 2.00 CLEAN OUT WASH WITH SWIVEL FROM JT 557 (17266), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS TRACE OF CEMENT; CHEMS PIPE ON PIPE.25 /10, PUMP 10 BBL SLUG OF BECCA LUBE EVERY 4 JTS. 07:00 07:15 0.25 2.25 SAFETY MEETING DISCUSSED TODAY'S ACTIVITIES, PINCHPOINTS, TRIP HAZARDS, EMERGENCY PROCEDURES, RANCH RULES, SPEED LIMIT, HOUSE KEEPING. 07:15 12:00 4.75 7.00 CLEAN OUT CONTINUE WASHING TO BOTTOM. ON JT 559 (17328' ), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS TRACE OF CEMENT; PUMP 10 BBL SLUG OF BECCA LUBE EVERY 4 JTS. 12:00 13: 1.50 8.50 GENERAL OPERATIONS SENT 5 BBL 100 VISC GEL SWEEP. CEMENT SHAVINGS IN RETURNS. RATE 4.5 BPM, CIRC PRESSURE 3500 PSI. DIFFERENTIAL ON BIT WAS 0-500 PSI. DRILLING @ 45' PER HOUR. 13: 14: 1.00 9.50 INACTIVE SHUT DOWN FOR WEATHER AND LIGHTNING. 14: 16: 2.00 11.50 CLEAN OUT CONTINUE WASHING TO BOTTOM. ON JT 563 (17452' ), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS TRACE OF CEMENT; PUMP.75/10 BECCA LUBE 16: 18:45 2.25 13.75 CLEAN OUT CONTINUE WASHING TO BOTTOM. ON JT 568 (17606' ), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS CEMENT. CHEMICALS,.75/10 BECCA LUBE 18:45 19:00 0.25 14.00 SAFETY MEETING TALKED ABOUT TODAY'S ACTIVITIES, WORKING IN WET CONDITIONS, SLIPS, TRIPS AND FALLS. 19:00 19:15 0.25 14.25 CLEAN OUT CONTINUE WASHING TO BOTTOM TAG ISEAT WITH JT 572 (17757), RATE 4.5 BPM IN/OUT, CIRC PRESSURE 00 PSI; RETURNS CEMENT. CHEMICALS, PUMP 10/10/10 80 VIS SWEEP. 19:15 :45 1.50 15.75 CLEAN OUT CIRCULATE 10/10/10 80 VIS SWEEP TO SURFACE, 150 BBL SPACER 10 BBL SLUG OF BECCA LUBE. :45 23:15 2.50 18.25 RIG UP/DOWN MIRU OTEX PUMP TRUCK, PRESSURE TEST LINES TO 4500 PSI, PUMP 500 GAL OF 15% HCL AND DISPLACE WITH 95 BBL OF WATER, SPOTTED AT 17757', RDMO OTEX PUMP TRUCK. 23:15 23:45 0.50 18.75 TRIPPING TOH WITH SWIVEL 3 JTS PULLED OFF 85 KLBS BOTTOM, LD SWIVEL 23:45 05:00 5.25 24.00 TRIPPING TOH LAYING DOWN 40 JTS AND STANDING BACK IN DERRICK NPT Problem OTHER SubTyp OTHER Description TRICAN BPS FAILED TO OPEN 4/8/16 Failed Item Accountable Party TRICAN WELL SERVICE Time Inspected By Description 07:00 SAFETY MEETING DAN CURTIS PJSM 19:00 SAFETY MEETING WES WILSON PJSM Workover Rig Contractor C & J Bit Information Size (in) 4 5/8 Rig Number 778 Make Model Length (ft) 0. Bit MILL Serial Number NN Rig SERVICE Dur Depth In (ft Depth Out Drillout Parameters te Drilling Time (hr) Start Depth (ftkb) End Depth (ftkb) SPP (psi) P Surf Annulus (psi) WOB (1000lbf) RPM (rpm) Drilling Torque PU Str Wt (1000lbf) SO Str Wt (1000lbf) Current BHA Components BHA Item Description 1 DRILL PIPE Perforation Intervals Make Model OD (in) 2 7/8 Joints Length (ft) Top Thread Fishing Neck OD (in) FN Len (ft) 572 17,757.00 Time Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com

AMERICAN ENERGY - PERMIAN BASIN, LLC AEPB WELL NO. 115 4/14/16 Number of s (ft) Primary Job - ORIGINAL 57 Ground Elevation (ft) RKB (ft) Secondary Job 10,000 4/8/16 44,311 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, AEPB; COMP SUPER, WES WILSON, NEW TECH; COMP SUP, DAN CURTIS, NEW TECH 0 NPT, 0 EHS ISSUES; FINISHED OUT OF WITH TOP NOTCH BHA. RIG UP O-TEX PUMPS AND IRON. TEST IRON TO 9000 PSI, GOOD TEST. START RATE AT 3 BPM, IT TOOK 24 BBLS TO CATCH PRESSURE. CONTINUED WALKING PRESSURE UP TO 9000 PSI, HELD FOR 5 MIN. BLED WELL TO 0 PSI THROUGH CHOKE MANIFOLD. ATTEMPT SAME, PRESSURED OUT AGAIN WITH NO LEAK OFF. ATTEMPT 3RD TIME WITH SAME RESULT. RIG DOWN O-TEX AND BEGIN TO MAKE UP TCP GUNS;TIH TO 17,733 TO BOTTOM PERF. TIE IN TO BACK SIDE BROUGHT PRESSURE UP TO 3700 PSI SAW FIRST SHOT FIRE AND PRESSURE DROPPED TO 00 PSI SAW ALL SHOTS FIRE, PERFS 17,627, 17,653, 17,680, 17,707, 17,733, BLED WELL DOWN TO 0 PSI; POOH LAYING DOWN SINGLES, PREPARING TO LAY DOWN GUNS AT REPOT TIME. STRING FLOAT 2.46 5-3' GUNS 15.19 5-8' SUBS 4 3- X OVERS.10 77.75' RAN 3 JOINTS ( 10000' ) 2 7/8 PH06 PIPE DRILL COLLAR.25 DRILL COLLAR 31.15 DRILL COLLAR 29.19 DRILL COLLAR.23 DRILL COLLAR.25 151.07' PERFORATE WITH TCP Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd Typ NPT 05:00 05:45 0.75 0.75 TRIPPING CONTINUE TOH STANDING BACK 266 STANDS 05:45 07:00 1.25 2.00 TRIPPING LD TOP NOTCH BHA. 07:00 07:15 0.25 2.25 SAFETY MEETING DISCUSSED TODAY'S ACTIVITIES. PRESSURE TESTING, PUMPING, PPE, EMERGENCY PROCEDURES, PINCHPOINTS, TRIP HAZARDS, SPEED LIMITS, HOUSE KEEPING. 07:15 07:45 0.50 2.75 PUMP TEST PRESSURE SURFACE CASING TO 500 PSI. SHUT IN SURFACE CASING. PRESSURE TEST O-TEX LINES TO 9000 PSI, AND CHART ALL EVENTS. GOOD TEST. 07:45 10:15 2.50 5.25 GENERAL OPERATIONS PRESSURE UP ON 5 1/2 CASING TO OPEN BPS. PRESSURE TO 9000 PSI, HOLD FOR 5 MIN, NO LEAK OFF. 2ND ATTEMPT WITH SAME RESULT. ATTEMPT 3RD TIME TO 9000 PSI AND HOLD FOR 5 MIN. NO LEAK OFF. 10:15 11:45 1.50 6.75 RIG UP/DOWN RIG DOWN O-TEX AND RELATED EQUIPMENT 11:45 13:45 2.00 8.75 RIG UP/DOWN RIG UP NINE AND INSTALL TCP GUNS TO PERF STAGE 2. FROM 17,627, 17,653, 17,680, 17,707, 17,733 13:45 15:15 1.50 10.25 TRIPPING START IN WITH TCP GUNS: STRING FLOAT 2.46 5-3' GUNS 15.19 5-8" SUBS 4 3- X OVERS.10 77.75' DRILL COLLAR.25 DRILL COLLAR 31.15 DRILL COLLAR 29.19 DRILL COLLAR.23 DRILL COLLAR.25 151.07' 626,517 15:15 15:45 0.50 10.75 TRIPPING INSTALL 5 DRILL COLLARS ON JOINT 3 15:45 18:00 2.25 13.00 TRIPPING TIH TO 17,733 TO BOTTOM PERF. 18:00 18: 0.50 13.50 PERFORATING TIE IN TO BACK SIDE BROUGHT PRESSURE UP TO 3700 PSI SAW FIRT SHOT FIRE AND PRESSURE DROPED TO 00 PSI SAW ALL SHOTS FIRE, PERFS 17,627, 17,653, 17,680, 17,707, 17,733, BLED WELL DOWN TO 0 PSI. 18: 18:45 0.25 13.75 SAFETY MEETING TALKED ABOUT TODAY'S ACTIVITIES, PRESSURE ON LINES, WELL CONTROL AND PINCH POINTS. 18:45 05:00 10.25 24.00 TRIPPING POOH LAYINNG DOWN SINGLES. NPT Problem OTHER SubTyp OTHER Description TRICAN BPS FAILED TO OPEN 4/8/16 Failed Item Accountable Party TRICAN WELL SERVICE Time Inspected By Description 07:00 SAFETY MEETING DAN CURTIS PJSM 19:00 SAFETY MEETING WES WILSON PJSM Workover Rig Contractor C & J Perforation Intervals Rig Number 778 Rig SERVICE Time Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 19:00 <zonename>, 17,627.0 17,628.3 3 1/8 19:00 <zonename>, 17,653.0 17,654.3 3 1/8 19:00 <zonename>, 17,680.0 17,681.3 3 1/8 19:00 <zonename>, 17,707.0 17,708.3 3 1/8 19:00 <zonename>, 17,733.0 17,734.3 3 1/8 Dur

AMERICAN ENERGY - PERMIAN BASIN, LLC AEPB WELL NO. 115 4/15/16 Number of s (ft) Primary Job - ORIGINAL 57 Ground Elevation (ft) RKB (ft) Secondary Job 10,000 4/8/16 32,482 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, AEPB; COMP SUPER, WES WILSON, NEW TECH; COMP SUP, DAN CURTIS, NEW TECH 0 NPT, 0 EHS ISSUES. LAYOUT GUNS. PERFORM INJECTION TEST. PUMPED IN 4 BBLS @ 7.75 BPM 40 PSI. ISIP, 5 MIN 00, 10 MIN 29, 15 MIN 2800. FG 0.85. RIG DOWN ALL SERVICE COMPANIES, SECURE WELL, ALL VALVES CLOSED, REMOVE FLOWCROSS, INSTALL NIGHT CAP, TORQUE FLANGE TO SPECS. CLEAN LOCATION. WELL READY FOR FRAC. WELL READY FOR FRAC Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd Typ NPT 05:00 06:00 1.00 1.00 RIG UP/DOWN LADY DOWN TCP GUNS ALL SHOT FIRED 06:00 07:00 1.00 2.00 GENERAL OPERATIONS PREFORM INJECTION TEST. PUMPED 4 BBLS IN AT 7.75 BPM @ 40 PSI. ISIP, 5 MIN 00, 10 MIN 29, 15 MIN 2800 FG 0.85 07:00 07:15 0.25 2.25 SAFETY MEETING DISCUSSED TODAY'S ACTIVITIES, PINCHPOINTS, TRIP HAZARDS, RIG DOWN, LAND GUIDES FOR BACKING, FORKLIFT SAFETY, MANLIFT SAFETY. PPE, HOUSE KEEPING. 07:15 12:00 4.75 7.00 RIG UP/DOWN RIG DOWN MOVE OFF ALL SERVICE COMPAINES. WELL SHUT IN AND SECURE. 2600 SICP AT REPORT TIME. WELL READY FOR FRAC. 12:00 05:00 17.00 24.00 INACTIVE WELL SHUT IN. WAITING ON FRAC NPT Typ SubTyp Des Failed Item Accountable Party Dur (hr) OTHER OTHER TRICAN BPS FAILED TO OPEN 4/8/16 16:15 4/14/16 12:00 TRICAN WELL SERVICE 139.7 5 Workover Rig Contractor C & J Time Inspected By Description Rig Number 778 Bit Information Size (in) Make Model Length (ft) Bit Serial Number Depth In (ft Depth Out Rig SERVICE Drillout Parameters te Drilling Time (hr) Start Depth (ftkb) End Depth (ftkb) SPP (psi) P Surf Annulus (psi) WOB (1000lbf) RPM (rpm) Drilling Torque PU Str Wt (1000lbf) SO Str Wt (1000lbf) Perforation Intervals Time Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 658,999

5/8/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 14,0 4/8/16 711,786 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 0 NPT, 0 EHS ISSUES; MOVE IN RIG UP AND TEST FRAC STACKS AND FLOWBACK SPOTTED FRAC AND FLOWBACK TANKS; SET UP FRAC OFFICE AND SUNBELT RENTAL EQUIPMENT. WAITING ON FRAC CREW Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 05:00 24.00 24.00 RIG UP/DOWN MOVE IN RIG UP AND TEST FRAC STACKS AND FLOWBACK SPOTTED FRAC AND FLOWBACK TANKS; SET UP FRAC OFFICE AND SUNBELT RENTAL EQUIPMENT. Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER PJSM 17:00 SAFETY MEETING CLAYTON BRUNTZ/JANSON COLLINSWEORTH PJSM Workover Rig Contractor Rig # Rig RR Date C & J 778 SERVICE 4/8/16 5/14/16 Stimulations Summary Proppant Total (lb)

5/9/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 8,913 4/8/16 7,533 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 0 NPT, 0 EHS ISSUES; WAITING ON FRAC CREW WAITING ON FRAC CREW Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 05:00 24.00 24.00 INACTIVE WAITING FOR FRAC CREW Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER SITE HANDOVER 17:00 SAFETY MEETING CLAYTON BRUNTZ/JANSON COLLINSWEORTH SITE HANDOVER Workover Rig Contractor Rig # Rig RR Date C & J 778 SERVICE 4/8/16 5/14/16 Stimulations Summary Proppant Total (lb)

5/10/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 8,328 4/8/16 7,279 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 0 NPT, 0 EHS ISSUES; SPOT WIRELINE TRUCK AND AUXILLARY EQUIPMENT, FUNCTION TEST BOPS AND TOOL TRAP, SPOT SAND KINGS AND PRE-FILL SAND. WELL SHUT IN AND SECURE WAITING ON FRAC CREW MIRU FRAC EQUIPMENT Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 10:00 5.00 5.00 INACTIVE WAITING ON FRAC CREW 10:00 13:00 3.00 8.00 RIG UP/DOWN MIRU WIRELINE EQUIPMENT AND AUXILLARY SERVICES 13:00 19:00 6.00 14.00 INACTIVE WAITING ON FRAC CREW 19:00 00:00 5.00 19.00 RIG UP/DOWN SPOT SAND KINGS AND PRE-FILL SAND 00:00 05:00 5.00 24.00 INACTIVE WAITING ON FRAC CREW Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER SITE HANDOVER 17:00 SAFETY MEETING CLAYTON BRUNTZ/JANSON COLLINSWEORTH SITE HANDOVER Workover Rig Contractor Rig # Rig RR Date C & J 778 SERVICE 4/8/16 5/14/16 Stimulations Summary Proppant Total (lb)

5/11/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 9,318 4/8/16 740,541 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 0 NPT, 0 EHS ISSUES; MIRU FRAC EQUIPMENT, LOAD ACID AND START PRE FRAC QA/QC START FRAC Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 10:00 5.00 5.00 INACTIVE WAITING ON FRAC CREW TO ARRIVE 10:00 05:00 19.00 24.00 RIG UP/DOWN MIRU FRAC PUMPS AND START RIGGING UP IRON, MIX ACID, COMPLETE PRE JOB QA/QC Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER PJSM 17:00 SAFETY MEETING CLAYTON BRUNTZ/JANSON COLLINSWEORTH PJSM Stimulations Summary Proppant Total (lb)

5/12/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 192,075 4/8/16 932,616 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 7.25 NPT, 0 EHS ISSUES FRAC STAGE 2-5 OF 55, PLUG AND PERFORATE STAGE 3-6 OF 55; 4 STAGES FRAC'D ON THE PAD; 5.75 HRS NPT ON FOR NOT STARTING ON TIME, HAVING TO MOVE THE DENSO. AND FIXING A LEAK; 1.5 HRS NPT ON DYNASTY FOR CHANGING OUT GREASE TUBES; FRAC'ING STAGE 6 OF 55 AT REPORT TIME. FRAC MULTIPLE STAGES Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 09: 4.50 4.50 DOWNTIME WAITING ON TO FINISH RIGGING UP IRON, RESTRAINTS AND SPOT DATA VAN AND RIG UP ALL THE CABLES, ALSO WAITING ON TO RETREIVE PRELOAD SAND TICKETS FROM NIGHT SHIFT SUPERVISOR THAT TOOK THEM TO THEIR MANCAMP IN BARNHART TO CONFIRM SAND AMOUNT AND BIN ALLOCATION PRIOR TO STARTING STAGE 1 OF 44 09: 12:15 2.75 7.25 FRAC. JOB FRAC STAGE 2 OF 55 12:15 15:15 3.00 10.25 PERFORATING PLUG AND PERF STAGE 3 OF 55; LOGGING POOH 15:15 17:15 2.00 12.25 FRAC. JOB FRAC STAGE 3 OF 55 17:15 19:00 1.75 14.00 PERFORATING PLUG AND PERF STAGE 4 OF 55 19:00 :15 1.25 15.25 DOWNTIME MOVING INLINE DENSO. AND FIXING LEAK :15 22:15 2.00 17.25 FRAC. JOB FRAC STAGE 4 OF 55 22:15 00:15 2.00 19.25 PERFORATING PLUG AND PERF STAGE 5 OF 55 00:15 02:00 1.75 FRAC. JOB FRAC STAGE 5 OF 55 02:00 03: 1.50 22.50 DOWNTIME WIRELINE PRESSURE CONTROL WON'T HOLD GREASE SEAL, CHANGE OUT FLOW TUBES. 03: 04:45 1.25 23.75 PERFORATING PLUG AND PERF STAGE 6 OF 55 04:45 05:00 0.25 24.00 FRAC. JOB FRAC STAGE 6 OF 55 NPT Subtype Des Failed Item Accountable Party SURFACE EQUIPMENT FRAC FINISH RIGGING UP IRON AND RESTRAINTS, 5/11/16 05:00 5/11/16 09: FRACTURING INITIAL QA/QC TECHNOLOGIES SURFACE EQUIPMENT SURFACE EQUIPMENT FRAC AUXILIARY EQUP PRESSURE CONTROL MOVING DENSO AND FIXING LEAK 5/11/16 19:00 5/11/16 :15 FRACTURING TECHNOLOGIES CHANGE OUT FLOW TUBES 5/12/16 02:00 5/12/16 03: DYNASTY WIRELINE SERVICES 1.50 Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER PJSM 17:00 SAFETY MEETING CLAYTON BRUNTZ/JANSON COLLINSWEORTH PJSM Plug Details Des Top (ftkb) Btm (ftkb) OD (in) ID (in) Run Date Pull Date Com FRAC PLUG 17,612.0 17,613.5 4 3/8 1.27 5/11/16 STAGE 3 PLUG (340 FPM @ 14 BPM) FRAC PLUG 17,478.0 17,479.5 4 3/8 1.27 5/11/16 STAGE 4 PLUG (6 FPM @ BPM) FRAC PLUG 17,310.0 17,311.5 4 3/8 1.27 5/11/16 STAGE 5 PLUG (6 FPM @ BPM) FRAC PLUG 17,168.0 17,169.5 4 3/8 1.27 5/12/16 STAGE 6 PLUG (610 FPM @ BPM) Perforation Intervals Time Linked Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 04:15 17,023.0 17,024.3 6.0 3 1/8 STAGE 6 04:15 17,054.0 17,055.3 6.0 3 1/8 STAGE 6 04:15 17,086.0 17,087.3 6.0 3 1/8 STAGE 6 04:15 17,114.0 17,115.3 6.0 3 1/8 STAGE 6 04:15 17,148.0 17,149.3 6.0 3 1/8 STAGE 6 23: 17,180.0 17,181.3 6.0 3 1/8 STAGE 5 23: 17,211.0 17,212.3 6.0 3 1/8 STAGE 5 23: 17,240.0 17,241.3 6.0 3 1/8 STAGE 5 23: 17,274.0 17,275.3 6.0 3 1/8 STAGE 5 23: 17,0.0 17,1.3 6.0 3 1/8 STAGE 5 18:00 17,336.0 17,337.3 6.0 3 1/8 STAGE 4 18:00 17,365.0 17,366.3 6.0 3 1/8 STAGE 4 18:00 17,399.0 17,400.3 6.0 3 1/8 STAGE 4 18:00 17,4.0 17,431.3 6.0 3 1/8 STAGE 4 18:00 17,462.0 17,463.3 6.0 3 1/8 STAGE 4 13:45 17,493.0 17,494.3 6.0 3 1/8 STAGE 3 13:45 17,5.0 17,521.3 6.0 3 1/8 STAGE 3 13:45 17,546.0 17,547.3 6.0 3 1/8 STAGE 3 13:45 17,573.0 17,574.3 6.0 3 1/8 STAGE 3 13:45 17,600.0 17,601.3 6.0 3 1/8 STAGE 3 Stimulations Summary HYDRAULIC FRAC Stimulation Details STAGE 2 - on 5/11/16 5/11/16 1,825.0 3,3.0 8,101.0,982.00 P Post SI ( 5 min SI (psi) 2801 7,027.0 5/11/16 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 7,989.0,982.00 5 Treat Rate Max (gpm) Treat Rate Avg (gpm) 9,613.00 Proppant Total (lb) 0.0 Dur (Net) (hr) 4.50 1.25 Proppant D Prop Place 81 78 3,000 327,905 Add Add Subtype Add Purpose Design Amount Amount Units Com Friction Reducer WFR-54LA 60.0 GAL/T Surfactant ROCK ON 33.0 GAL/T Surfactant.0 GAL/T Friction Reducer WFR-54LA 277.6 GAL/T Surfactant 153.0 GAL/T Surfactant ROCK ON 440.0 GAL/T Tracer OST 2410 4.0 KG Acid 7 1/2% HCL 7 1/2% HCL 2,000.0 GAL Acid Inhibitor/retarder INHIBITOR WAI-251LC 6.0 GAL

5/12/16 Add Add Subtype Add Purpose Design Amount Amount Units Com Friction Reducer WFR-54LA 14.4 GAL/T Surfactant.0 GAL/T Surfactant ROCK ON 40.0 GAL/T Friction Reducer WFR-54LA 102.0 GAL/T Surfactant 50.0 GAL/T Surfactant ROCK ON 100.0 GAL/T STAGE 3 - on 5/11/16 5/11/16 2,358.0 3,417.0 8,108.0,982.00 P Post SI ( 5 min SI (psi) 35 7,215.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 5,900.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 6,914.00 Proppant D Prop Place 76 75 3,000 328,049 Add Add Subtype Add Purpose Design Amount Amount Units Com Friction Reducer WFR-54LA 46.0 GAL/T Surfactant 45.0 GAL/T Surfactant ROCK ON 86.0 GAL/T Friction Reducer WFR-54LA 166.0 GAL/T Surfactant ROCK ON 3.0 GAL/T Surfactant 15.0 GAL/T Tracer OST 2410 4.0 KG Acid 7 1/2% HCL 7 1/2% HCL 2,000.0 GAL Acid Inhibitor/retarder INHIBITOR WAI-251LC 6.0 GAL Friction Reducer WFR-54LA 16.0 GAL/T Surfactant ROCK ON 26.0 GAL/T Surfactant 15.0 GAL/T Friction Reducer WFR-54LA 44.0 GAL/T Surfactant 43.0 GAL/T Surfactant ROCK ON 82.0 GAL/T STAGE 4 - on 5/11/16 5/11/16 2,427.0 3,590.0 8,177.0,982.00 P Post SI ( 5 min SI (psi) 2960 7,465.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 5,696.0 19 19 Treat Rate Max (gpm) Treat Rate Avg (gpm) 7,846.00 Proppant D Prop Place 80 76 3,000 336,332 Add Add Subtype Add Purpose Design Amount Amount Units Com Friction Reducer WFR-54LA 53.0 GAL/T Surfactant 40.0 GAL/T Surfactant ROCK ON 90.0 GAL/T Friction Reducer WFR-54LA 219.0 GAL/T Surfactant ROCK ON 419.0 GAL/T Surfactant 3.0 GAL/T Tracer OST 10 4.0 KG Acid 7 1/2% HCL 7 1/2% HCL 2,000.0 GAL Acid Inhibitor/retarder INHIBITOR WAI-251LC 6.0 GAL Friction Reducer WFR-54LA 22.0 GAL/T Surfactant 9.0 GAL/T Surfactant ROCK ON 28.0 GAL/T Friction Reducer WFR-54LA.0 GAL/T Surfactant ROCK ON 44.0 GAL/T Surfactant STAGE 5 - on 5/12/16 5/12/16 2,661.0 3,644.0 7,903.0,982.00 P Post SI ( 5 min SI (psi) 3154 7,364.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 5,214.0 17.0 GAL/T Treat Rate Max (gpm) Treat Rate Avg (gpm) 6,609.00 Proppant D Prop Place 81 80 3,000 328,227 Add Add Subtype Add Purpose Design Amount Amount Units Com Friction Reducer WFR-54LA 40.0 GAL/T Surfactant ROCK ON 89.0 GAL/T Surfactant 51.0 GAL/T Friction Reducer WFR-54LA 107.0 GAL/T Gels Friction Reducers WGA-15L 295.0 KG Surfactant 170.0 GAL/T Surfactant ROCK ON 327.0 GAL/T Tracer OST 10 4.0 KG Acid 7 1/2% HCL 7 1/2% HCL 2,000.0 GAL Acid Inhibitor/retarder INHIBITOR WAI-251LC 6.0 GAL Friction Reducer WFR-54LA 10.0 GAL/T Surfactant ROCK ON 31.0 GAL/T Surfactant 19.0 GAL/T Friction Reducer WFR-54LA 26.0 GAL/T Surfactant ROCK ON 45.0 GAL/T Surfactant 29.0 GAL/T

5/13/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 258,550 4/8/16 1,185,592 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 1.5 HRS NPT, 0 EHS ISSUES FRAC STAGE 6-11 OF 55, PLUG AND PERFORATE STAGE 7-12 OF 55; 6 STAGES FRAC'D ON THE PAD; NPT TO PURELINE FOR REPAIRS AND DYNASTY WIRELINE TO SWAP O-RINGS IN LUBRICATOR. FRAC'ING STAGE 12 OF 55 AT REPORT TIME. FRAC MULTIPLE STAGES Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 07:15 2.25 2.25 FRAC. JOB FRAC STAGE 6 OF 55 07:15 09:00 1.75 4.00 PERFORATING PLUG AND PERF STAGE 7 OF 55 09:00 11:15 2.25 6.25 FRAC. JOB FRAC STAGE 7 OF 55 11:15 12: 1.25 7.50 PERFORATING PLUG AND PERF STAGE 8 OF 55 12: 13:15 0.75 8.25 GENERAL OPERATIONS GREASE FRAC STACK 13:15 15: 2.25 10.50 FRAC. JOB FRAC STAGE 8 OF 55 15: 17:00 1.50 12.00 PERFORATING PLUG AND PERF STAGE 9 OF 55 17:00 18:45 1.75 13.75 FRAC. JOB FRAC STAGE 9 OF 55 18:45 : 1.75 15.50 PERFORATING PLUG AND PERF STAGE 10 OF 55 : 21: 1.00 16.50 FRAC. JOB FRAC STAGE 10 OF 55 21: 22:00 0.50 17.00 DOWNTIME PURELINE EQUIPMENT FAILURE, FLUSHED WELL AND SHUTDOWN FOR REPAIRS 22:00 23:00 1.00 18.00 FRAC. JOB FRAC STAGE 10 OF 55 23:00 00:00 1.00 19.00 DOWNTIME LUBRICATOR LEAK, SWAPPED OUT O-RING 00:00 01:15 1.25.25 PERFORATING PLUG AND PERF STAGE 11 OF 55 01:15 03:00 1.75 22.00 FRAC. JOB FRAC STAGE 11 OF 55 03:00 04: 1.50 23.50 PERFORATING PLUG AND PERF STAGE 12 OF 55 04: 05:00 0.50 24.00 FRAC. JOB FRAC STAGE 12 OF 55 NPT Subtype Des Failed Item Accountable Party MATERIALS CHEMICALS PURELINE EQUIPMENT FAILURE 5/12/16 21: 5/12/16 22:00 PURELINE TREATMENT SYSTEMS, LLC SURFACE EQUIPMENT WIRELINE LUBRICATOR LEAK DURING PRESSURE TEST, SWAPPED OUT O-RING Dur (Net) (hr) 0.50 5/12/16 23:00 5/13/16 00:00 DYNASTY WIRELINE SERVICES 1.00 Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER PJSM 17:00 SAFETY MEETING CLAYTON BRUNTZ/JANSON COLLINSWEORTH PJSM Plug Details Des Top (ftkb) Btm (ftkb) OD (in) ID (in) Run Date Pull Date Com FRAC PLUG 17,008.0 17,009.5 4 3/8 1.27 5/12/16 STAGE 7 PLUG (610 FPM @ BPM) FRAC PLUG 16,807.0 16,808.5 4 3/8 1.27 5/12/16 STAGE 8 PLUG (595 FPM @ BPM) FRAC PLUG 16,607.0 16,608.5 4 3/8 1.27 5/12/16 STAGE 9 PLUG (610 FPM @ BPM) FRAC PLUG 16,405.0 16,406.5 4 3/8 1.27 5/12/16 STAGE 10 PLUG (610 FPM @ BPM) FRAC PLUG 16,190.0 16,191.5 4 3/8 1.27 5/13/16 STAGE 11 PLUG (6 FPM @ BPM) FRAC PLUG 16,003.0 16,004.5 4 3/8 1.27 5/13/16 STAGE 12 PLUG (660 FPM @ BPM) Perforation Intervals Time Linked Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 03:45 15,817.0 15,818.3 6.0 3 1/8 STAGE 12 03:45 15,857.0 15,858.3 6.0 3 1/8 STAGE 12 03:45 15,897.0 15,898.3 6.0 3 1/8 STAGE 12 03:45 15,938.0 15,939.3 6.0 3 1/8 STAGE 12 03:45 15,978.0 15,979.3 6.0 3 1/8 STAGE 12 00:45 16,018.0 16,019.3 6.0 3 1/8 STAGE 11 00:45 16,058.0 16,059.3 6.0 3 1/8 STAGE 11 00:45 16,098.0 16,099.3 6.0 3 1/8 STAGE 11 00:45 16,139.0 16,140.3 6.0 3 1/8 STAGE 11 00:45 16,179.0 16,180.3 6.0 3 1/8 STAGE 11 19:15 16,219.0 16,2.3 6.0 3 1/8 STAGE 10 19:15 16,260.0 16,261.3 6.0 3 1/8 STAGE 10 19:15 16,4.0 16,5.3 6.0 3 1/8 STAGE 10 19:15 16,338.0 16,339.3 6.0 3 1/8 STAGE 10 19:15 16,380.0 16,381.3 6.0 3 1/8 STAGE 10 16:15 16,4.0 16,421.3 6.0 3 1/8 STAGE 9 16:15 16,460.0 16,461.3 6.0 3 1/8 STAGE 9 16:15 16,500.0 16,501.3 6.0 3 1/8 STAGE 9 16:15 16,541.0 16,542.3 6.0 3 1/8 STAGE 9 16:15 16,581.0 16,582.3 6.0 3 1/8 STAGE 9 12:15 16,621.0 16,622.3 6.0 3 1/8 STAGE 8 12:15 16,661.0 16,662.3 6.0 3 1/8 STAGE 8 12:15 16,701.0 16,702.3 6.0 3 1/8 STAGE 8 12:15 16,742.0 16,743.3 6.0 3 1/8 STAGE 8 12:15 16,782.0 16,783.3 6.0 3 1/8 STAGE 8 08:00 16,822.0 16,823.3 6.0 3 1/8 STAGE 7 08:00 16,866.0 16,867.3 6.0 3 1/8 STAGE 7 08:00 16,900.0 16,901.3 6.0 3 1/8 STAGE 7 08:00 16,943.0 16,944.3 6.0 3 1/8 STAGE 7 08:00 16,983.0 16,984.3 6.0 3 1/8 STAGE 7 Stimulations Summary HYDRAULIC FRAC 5/11/16 75,345.00 Proppant Total (lb) 0.0

5/13/16 Stimulation Details STAGE 6 - on 5/12/16 5/12/16 2,618.0 3,734.0 8,137.0 75,345.00 P Post SI ( 5 min SI (psi) 2906 7,289.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 6,214.0 10 Treat Rate Max (gpm) Treat Rate Avg (gpm) 7,245.00 FRAC STAGE 6 OF 55 OST 4110 CUT STAGE 110,000 LBS 40/70 SHORT TO AVOID SCREENOUT, COULD NOT RUN GEL DUE TO NOT HAVING ANY BREAKER ON LOCATION FOR THE GEL Proppant D Prop Place 82 79 3,000 227,937 7,515.00 Add Add Subtype Add Purpose Design Amount Amount Units Com Acid 7 1/2% HCL 7 1/2% HCL 2,000.0 GAL Friction Reducer WFR-54LA 274.0 GAL/T Surfactant ROCK ON 615.0 GAL/T Surfactant ASCEND ADDITIVE 357.0 GAL/T Tracer OST 4110 4.0 KG STAGE 7 - on 5/12/16 5/12/16 2,495.0 3,727.0 7,7.0 75,345.00 P Post SI ( 5 min SI (psi) 3284 6,552.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,659.0 19 10 Treat Rate Max (gpm) Treat Rate Avg (gpm) 7,584.00 FRAC STAGE 7 OF 55 OST 4110 CUT STAGE 9,152 LBS 40/70 SHORT TO AVOID SCREENOUT, COULD NOT RUN GEL DUE TO NOT HAVING ANY BREAKER ON LOCATION FOR THE GEL Proppant D Prop Place 84 80 3,000 3,848 7,614.00 Add Add Subtype Add Purpose Design Amount Amount Units Com Friction Reducer WFR-54LA 341.0 GAL/T Surfactant ASCEND ADDITIVE 266.0 GAL/T Surfactant ROCK ON 586.0 GAL/T Tracer OST 4110 4.0 KG STAGE 8 - on 5/12/16 5/12/16 2,463.0 3,467.0 7,453.0 75,345.00 P Post SI ( 5 min SI (psi) 3180 6,738.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,670.0 10 Treat Rate Max (gpm) Treat Rate Avg (gpm) 8,954.00 FRAC STAGE 8 OF 55 OST 4110 Proppant D Prop Place 83 6,738 3,000 328,225 9,055.00 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers INSTANT WBK-133 INSTANT BREAKER.0 Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM 65.0 Gels Friction Reducers WGA-15L 432.0 Friction Reducer WFR-54LA 240.0 GAL/T Surfactant ASCEND ADDITIVE 360.0 GAL/T Surfactant ROCK ON 744.0 GAL/T Tracer OST 4110 4.0 KG STAGE 9 - on 5/12/16 5/12/16 2,463.0 3,381.0 7,190.0 75,345.00 P Post SI ( 5 min SI (psi) 2819 6,243.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,472.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 6,663.00 FRAC STAGE 9 OF 55 OST 4110 Proppant D Prop Place 81 80 3,000 327,856 7,0 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM 40.0 Breakers INSTANT WBK-133 INSTANT BREAKER 10.0 Gels Friction Reducers WGA-15L 152.0 Friction Reducer WFR-54LA 246.0 GAL/T Surfactant ROCK ON 312.0 GAL/T Surfactant ASCEND ADDITIVE 240.0 GAL/T Tracer OST 4110 4.0 KG STAGE 10 - on 5/12/16 5/12/16 2,398.0 3,240.0 7,399.0 75,345.00 P Post SI ( 5 min SI (psi) 2823 6,136.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,281.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 7,535.00 FRAC STAGE 10 OF 55 OST 4110 Proppant D Prop Place 81 80 3,000 329,8 7,897.00

5/13/16 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM.0 Breakers INSTANT WBK-133 INSTANT BREAKER 10.0 Gels Friction Reducers WGA-15L 103.0 Friction Reducer WFR-54LA 254.0 GAL/T Surfactant ASCEND ADDITIVE 246.0 GAL/T Surfactant ROCK ON 568.0 GAL/T Tracer OST 4110 4.0 KG STAGE 11 - on 5/13/16 5/13/16 2,434.0 3,438.0 6,974.0 75,345.00 P Post SI ( 5 min SI (psi) 2943 6,131.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,123.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 6,382.00 FRAC STAGE 11 OF 55 OST 4110 Proppant D Prop Place 81 81 3,000 327,109 6,726.00 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM.0 Breakers INSTANT WBK-133 INSTANT BREAKER 10.0 Gels Friction Reducers WGA-15L 103.0 Friction Reducer WFR-54LA 237.0 GAL/T Surfactant ROCK ON 517.0 GAL/T Surfactant ASCEND ADDITIVE 3.0 GAL/T Tracer OST 4110 4.0 KG

5/14/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 336,829 4/8/16 1,522,4 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 0 HRS NPT, 0 EHS ISSUES FRAC STAGE 12-19 OF 55, PLUG AND PERFORATE STAGE 13-19 OF 55; 8 STAGES FRAC'D ON THE PAD; PERF STAGE AT TOR FRAC MULTIPLE STAGES Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 06:15 1.25 1.25 FRAC. JOB FRAC STAGE 12 OF 55 06:15 07:45 1.50 2.75 PERFORATING PLUG AND PERF STAGE 13 OF 55 07:45 09: 1.75 4.50 FRAC. JOB FRAC STAGE 13 OF 55 09: 11:00 1.50 6.00 PERFORATING PLUG AND PERF STAGE 14 OF 55 11:00 12:00 1.00 7.00 GENERAL OPERATIONS GREASE FRAC STACK 12:00 13:15 1.25 8.25 FRAC. JOB FRAC STAGE 14 OF 55 13:15 15:00 1.75 1 PERFORATING PLUG AND PERF STAGE 15 OF 55 15:00 16: 1.50 11.50 FRAC. JOB FRAC STAGE 15 OF 55 16: 17:45 1.25 12.75 PERFORATING PLUG AND PERF STAGE 16 OF 55 17:45 19: 1.75 14.50 FRAC. JOB FRAC STAGE 16 OF 55 19: :45 1.25 15.75 PERFORATING PLUG AND PERF STAGE 17 OF 55 :45 22: 1.75 17.50 FRAC. JOB FRAC STAGE 17 OF 55 22: 23:45 1.25 18.75 PERFORATING PLUG AND PERF STAGE 18 OF 55 23:45 01: 1.75.50 FRAC. JOB FRAC STAGE 18 OF 55 01: 02: 1.00 21.50 PERFORATING PLUG AND PERF STAGE 19 OF 55 02: 04:00 1.50 23.00 FRAC. JOB FRAC STAGE 19 OF 55 04:00 05:00 1.00 24.00 PERFORATING PLUG AND PERF STAGE OF 55 Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER PJSM 17:00 SAFETY MEETING CLAYTON BRUNTZ/JASON COLLINSWORTH PJSM Plug Details Des Top (ftkb) Btm (ftkb) OD (in) ID (in) Run Date Pull Date Com FRAC PLUG 15,802.0 15,803.5 4 3/8 1.27 5/13/16 STAGE 13 PLUG (6 FPM @ BPM) FRAC PLUG 15,600.0 15,601.5 4 3/8 1.27 5/13/16 STAGE 14 PLUG (6 FPM @ BPM) FRAC PLUG 15,400.0 15,401.5 4 3/8 1.27 5/13/16 STAGE 15 PLUG (6 FPM @ BPM) FRAC PLUG 15,210.0 15,211.5 4 3/8 1.27 5/13/16 STAGE 16 PLUG (640 FPM @ BPM) FRAC PLUG 15,035.0 15,036.5 4 3/8 1.27 5/13/16 STAGE 17 PLUG (6 FPM @ BPM) FRAC PLUG 14,855.0 14,856.5 4 3/8 1.27 5/13/16 STAGE 18 PLUG (640 FPM @ BPM) FRAC PLUG 14,660.0 14,661.5 4 3/8 1.27 5/14/16 STAGE 19 PLUG (640 FPM @ BPM) Perforation Intervals Time Linked Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 02:00 14,503.0 14,504.3 6.0 3 1/8 STAGE 19 02:00 14,540.0 14,541.3 6.0 3 1/8 STAGE 19 02:00 14,576.0 14,577.3 6.0 3 1/8 STAGE 19 02:00 14,613.0 14,614.3 6.0 3 1/8 STAGE 19 02:00 14,649.0 14,650.3 6.0 3 1/8 STAGE 19 23:00 14,686.0 14,687.3 6.0 3 1/8 STAGE 18 23:00 14,722.0 14,723.3 6.0 3 1/8 STAGE 18 23:00 14,758.0 14,759.3 6.0 3 1/8 STAGE 18 23:00 14,795.0 14,796.3 6.0 3 1/8 STAGE 18 23:00 14,831.0 14,832.0 6.0 3 1/8 STAGE 18 :00 14,868.0 14,869.3 6.0 3 1/8 STAGE 17 :00 14,904.0 14,905.3 6.0 3 1/8 STAGE 17 :00 14,941.0 14,942.3 6.0 3 1/8 STAGE 17 :00 14,973.0 14,974.3 6.0 3 1/8 STAGE 17 :00 15,014.0 15,015.3 6.0 3 1/8 STAGE 17 17:15 15,050.0 15,051.3 6.0 3 1/8 STAGE 16 17:15 15,087.0 15,088.3 6.0 3 1/8 STAGE 16 17:15 15,123.0 15,124.3 6.0 3 1/8 STAGE 16 17:15 15,160.0 15,161.3 6.0 3 1/8 STAGE 16 17:15 15,198.0 15,199.3 6.0 3 1/8 STAGE 16 14:15 15,2.0 15,231.3 6.0 3 1/8 STAGE 15 14:15 15,269.0 15,270.3 6.0 3 1/8 STAGE 15 14:15 15,6.0 15,7.3 6.0 3 1/8 STAGE 15 14:15 15,342.0 15,343.3 6.0 3 1/8 STAGE 15 14:15 15,379.0 15,380.3 6.0 3 1/8 STAGE 15 10: 15,415.0 15,416.3 6.0 3 1/8 STAGE 14 10: 15,455.0 15,456.3 6.0 3 1/8 STAGE 14 10: 15,495.0 15,496.3 6.0 3 1/8 STAGE 14 10: 15,535.0 15,536.3 6.0 3 1/8 STAGE 14 10: 15,576.0 15,577.3 6.0 3 1/8 STAGE 14 07:00 15,616.0 15,617.3 6.0 3 1/8 STAGE 13 07:00 15,656.0 15,657.3 6.0 3 1/8 STAGE 13 07:00 15,696.0 15,697.3 6.0 3 1/8 STAGE 13 07:00 15,740.0 15,741.3 6.0 3 1/8 STAGE 13 07:00 15,773.0 15,774.3 6.0 3 1/8 STAGE 13 Stimulations Summary HYDRAULIC FRAC Stimulation Details STAGE 12 - on 5/13/16 5/13/16 2,614.0 3,345.0 7,003.0 123,787.00 P Post SI ( 5 min SI (psi) 10 5,985.0 5/11/16 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,231.0 123,787.00 10 Treat Rate Max (gpm) Treat Rate Avg (gpm) 6,298.00 FRAC STAGE 12 OF 55 OST 4110 Proppant Total (lb) 0.0 Proppant D Prop Place 81 80 3,000 328,314 6,388.00 Add Add Subtype Add Purpose Design Amount Amount Units Com

5/14/16 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM 34.0 LBS Breakers INSTANT WBK-133 INSTANT BREAKER.0 LBS Gels Friction Reducers WGA-15L 224.0 GAL Friction Reducer WFR-54LA 211.0 GAL Surfactant ROCK ON 533.0 GAL Surfactant ASCEND ADDITIVE 224.0 GAL Tracer OST 4110 4.0 KG STAGE 13 - on 5/13/16 5/13/16 2,434.0 3,251.0 7,708.0 123,787.00 P Post SI ( 5 min SI (psi) 2980 6,338.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,576.0 10 Treat Rate Max (gpm) Treat Rate Avg (gpm) 5,514.00 FRAC STAGE 13 OF 55 OST 4110 Proppant D Prop Place 87 86 3,000 327,780 6,018.00 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers INSTANT WBK-133 INSTANT BREAKER.0 LBS Gels Friction Reducers WGA-15L 8.0 GAL Friction Reducer WFR-54LA 173.0 GAL Surfactant ASCEND ADDITIVE 218.0 GAL Surfactant ROCK ON 431.0 GAL Tracer OST 4110 4.0 KG STAGE 14 - on 5/13/16 5/13/16 2,470.0 3,885.0 8,058.0 123,787.00 P Post SI ( 5 min SI (psi) 6,059.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,421.0 25 10 Treat Rate Max (gpm) Treat Rate Avg (gpm) 5,678.00 FRAC STAGE 14 OF 55 OST 3500 Proppant D Prop Place 88 84 3,000 326,593 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM 18.0 LBS Breakers INSTANT WBK-133 INSTANT BREAKER.0 LBS Gels Friction Reducers WGA-15L 148.0 GAL Friction Reducer WFR-54LA 179.0 GAL Surfactant ASCEND ADDITIVE 4.0 GAL Surfactant ROCK ON 450.0 GAL Tracer OST 3500 4.0 KG STAGE 15 - on 5/13/16 5/13/16 2,445.0 3,449.0 6,905.0 123,787.00 P Post SI ( 5 min SI (psi) 68 6,367.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,472.0 26 26 Treat Rate Max (gpm) Treat Rate Avg (gpm) 7,19 FRAC STAGE 15 OF 55 OST 3500 Proppant D Prop Place 87 82 3,000 329,814 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers INSTANT WBK-133 INSTANT BREAKER.0 LBS Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM 35.0 LBS Gels Friction Reducers WGA-15L 242.0 GAL Friction Reducer WFR-54LA 158.0 GAL Surfactant ROCK ON 365.0 GAL Surfactant ASCEND ADDITIVE 246.0 GAL Tracer OST 3500 4.0 KG STAGE 16 - on 5/13/16 5/13/16 2,549.0 3,222.0 6,787.0 123,787.00 P Post SI ( 5 min SI (psi) 2834 6,175.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,429.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 6,222.00 FRAC STAGE 16 OF 55 OST 3500 Proppant D Prop Place 81 80 3,000 326,272 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM.0 LBS Gels Friction Reducers WGA-15L 124.0 GAL Friction Reducer WFR-54LA 169.0 GAL Surfactant ROCK ON 498.0 GAL

5/14/16 Add Add Subtype Add Purpose Design Amount Amount Units Com Surfactant ASCEND ADDITIVE 0.0 GAL Tracer OST 3500 4.0 KG STAGE 17 - on 5/13/16 5/13/16 2,542.0 3,402.0 7,093.0 123,787.00 P Post SI ( 5 min SI (psi) 2841 6,190.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,533.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 6,37 FRAC STAGE 17 OF 55 OST 3500 Proppant D Prop Place 81 80 3,000 327,840 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM.0 LBS Gels Friction Reducers WGA-15L 127.0 GAL Friction Reducer WFR-54LA 159.0 GAL Surfactant ASCEND ADDITIVE 2.0 GAL Surfactant ROCK ON 500.0 GAL Tracer OST 3500 4.0 KG STAGE 18 - on 5/13/16 5/13/16 2,495.0 3,377.0 6,927.0 123,787.00 P Post SI ( 5 min SI (psi) 2895 6,169.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 4,558.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 5,794.00 FRAC STAGE 18 OF 55 OST 3500 Proppant D Prop Place 81 80 3,000 325,652 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM.0 LBS Gels Friction Reducers WGA-15L 129.0 GAL Friction Reducer WFR-54LA 136.0 GAL Surfactant ASCEND ADDITIVE 182.0 GAL Surfactant ROCK ON 452.0 GAL Tracer OST 3500 4.0 KG STAGE 19 - on 5/14/16 5/14/16 2,582.0 3,579.0 7,403.0 123,787.00 P Post SI ( 5 min SI (psi) 57 6,793.0 10 min SI (psi) 15 min SI (psi) P Breakdown (psi) 5,196.0 Treat Rate Max (gpm) Treat Rate Avg (gpm) 5,376.00 FRAC STAGE 19 OF 55 OST 3500 Proppant D Prop Place 91 91 3,000 327,409 Add Add Subtype Add Purpose Design Amount Amount Units Com Breakers ENCAPSULATED WBK-134 GEL BREAKER LONG TERM.0 LBS Gels Friction Reducers WGA-15L 180.0 GAL Friction Reducer WFR-54LA 155.0 GAL Surfactant ASCEND ADDITIVE 177.0 GAL Surfactant ROCK ON 439.0 GAL Tracer OST 3500 4.0 KG

5/15/16 Number of s (ft) 57 Primary Job - ORIGINAL 10,000 Ground Elevation (ft) RKB (ft) Secondary Job 298,4 4/8/16 1,848,570 CONSLTNT, JOE SMITH, CRSCNT; OPS ENG, DOUG HOWETH, PRES; CONSLTNT, JASON COLLINSWORTH, CRSCNT; COMP SUP, JUSTIN STRINGER, NEW TECH; COMP SUPER, CODY O'KEEFE, NEW TECH; COMP SUP, CLAYTON BRUNTZ, NEW TECH 2.5 HRS NPT, 0 EHS ISSUES; FRAC STAGES - 26 OF 55, PLUG AND PERFORATE STAGES 21-27 OF 55; 7 STAGES FRAC'D ON THE PAD; NPT TO TO REPLACE BAD SEAL ON CHECK VALVE AND TO SWAP CHEM TRAILER, NPT TO DYNASTY WIRELINE TO SWAP O-RINGS IN LUBRICATOR. FRAC'ING STAGE 27 AT REPORT TIME. FRAC MULTIPLE STAGES Start Time End Time Dur (hr) Cum Dur (hr) Activity Inactive? s Unschd NPT 05:00 05:15 0.25 0.25 PERFORATING PLUG AND PERF STAGE OF 55 05:15 06:00 0.75 1.00 GENERAL OPERATIONS GREASE FRAC STACK 06:00 07:15 1.25 2.25 FRAC. JOB FRAC STAGE OF 55 07:15 08: 1.25 3.50 PERFORATING PLUG AND PERF STAGE 21 OF 55 08: 09:00 0.50 4.00 DOWNTIME WAIT ON TO FIX LEAK ON IRON 09:00 10:15 1.25 5.25 FRAC. JOB FRAC STAGE 21 OF 55 10:15 11:00 0.75 6.00 FLOWBACK WELL FLOWBACK WELL AFTER SCREENOUT STAGE 21 FRAC, RETURNED BALL TO SURFACE, ESTIMATE,000 LBS 40/70 RETURNED TO SURFACE WITH 390 BBLS OF FLUID 11:00 11:15 0.25 6.25 FRAC. JOB FLUSH FRAC STAGE 21 11:15 12:45 1.50 7.75 PERFORATING PLUG AND PERF STAGE 22 OF 55 12:45 14:00 1.25 9.00 FRAC. JOB FRAC STAGE 22 OF 55 14:00 15:15 1.25 10.25 PERFORATING PLUG AND PERF STAGE 23 OF 55 15:15 16: 1.25 11.50 FRAC. JOB FRAC STAGE 23 OF 55 16: 18:15 1.75 13.25 PERFORATING PLUG AND PERF STAGE 24 OF 55 18:15 19: 1.25 14.50 FRAC. JOB FRAC STAGE 24 OF 55 19: : 1.00 15.50 PERFORATING PLUG AND PERF STAGE 25 OF 55 : 21:45 1.25 16.75 DOWNTIME SWAPPING CHEM. UNITS 21:45 23:00 1.25 18.00 FRAC. JOB FRAC STAGE 25 OF 55 (CUT PROPPANT EARLY DUE TO PRESSURE) 23:00 00:15 1.25 19.25 PERFORATING PLUG AND PERF STAGE 26 OF 55 00:15 01:00 0.75 2 GENERAL OPERATIONS GREASE WELLHEAD 01:00 02:00 1.00 FRAC. JOB FRAC STAGE 26 OF 55 02:00 02:45 0.75 21.75 DOWNTIME LEAK IN LUBRICATOR, SWAP O-RINGS 02:45 04:00 1.25 23.00 PERFORATING PLUG AND PERF STAGE 27 OF 55 04:00 05:00 1.00 24.00 FRAC. JOB FRAC STAGE 27 OF 55 NPT Subtype Des Failed Item Accountable Party SURFACE EQUIPMENT FRAC IRON LEAKING SEAL ON CHECK VALVE 5/14/16 08: 5/14/16 09:00 FRACTURING TECHNOLOGIES MATERIALS CHEMICALS SWAPPING CHEM. UNITS 5/14/16 : 5/14/16 21:45 FRACTURING TECHNOLOGIES SURFACE EQUIPMENT WIRELINE LUBRICATOR LEAK DURING PRESSURE TEST, SWAPPED OUT O-RINGS Dur (Net) (hr) 0.50 5/15/16 02:00 5/15/16 02:45 DYNASTY WIRELINE SERVICES 0.75 Time Inspected By Description 05:00 SAFETY MEETING CODY O'KEEFE/JUSTIN STRINGER PJSM 17:00 SAFETY MEETING CLAYTON BRUNTZ/JASON COLLINSWORTH PJSM Plug Details Des Top (ftkb) Btm (ftkb) OD (in) ID (in) Run Date Pull Date Com FRAC PLUG 14,488.0 14,489.5 4 3/8 1.27 5/14/16 STAGE PLUG (6 FPM @ BPM) FRAC PLUG 14,8.0 14,9.5 4 3/8 1.27 5/14/16 STAGE 21 PLUG (6 FPM @ BPM) FRAC PLUG 14,123.0 14,124.5 4 3/8 1.27 5/14/16 STAGE 22 PLUG (6 FPM @ BPM) FRAC PLUG 13,941.0 13,942.5 4 3/8 1.27 5/14/16 STAGE 23 PLUG (6 FPM @ BPM) FRAC PLUG 13,759.0 13,760.5 4 3/8 1.27 5/14/16 STAGE 24 PLUG (6 FPM @ BPM) FRAC PLUG 13,580.0 13,581.5 4 3/8 1.27 5/14/16 STAGE 25 PLUG (610 FPM @ BPM) FRAC PLUG 13,380.0 13,381.5 4 3/8 1.27 5/14/16 STAGE 26 PLUG (610 FPM @ BPM) FRAC PLUG 13,210.0 13,211.5 4 3/8 1.27 5/15/16 STAGE 27 PLUG (6 FPM @ BPM) Perforation Intervals Time Linked Top (ftkb) Btm (ftkb) Shot Dens (shots/ft) Gun Size (in) Com 03:15 13,053.0 13,054.3 6.0 3 1/8 STAGE 27 03:15 13,088.0 13,089.3 6.0 3 1/8 STAGE 27 03:15 13,124.0 13,125.3 6.0 3 1/8 STAGE 27 03:15 13,160.0 13,161.3 6.0 3 1/8 STAGE 27 03:15 13,195.0 13,196.3 6.0 3 1/8 STAGE 27 23:45 13,236.0 13,237.3 6.0 3 1/8 STAGE 26 23:45 13,267.0 13,268.3 6.0 3 1/8 STAGE 26 23:45 13,2.0 13,3.3 6.0 3 1/8 STAGE 26 23:45 13,338.0 13,339.3 6.0 3 1/8 STAGE 26 23:45 13,370.0 13,371.3 6.0 3 1/8 STAGE 26 :00 13,409.0 13,410.3 6.0 3 1/8 STAGE 25 :00 13,442.0 13,443.3 6.0 3 1/8 STAGE 25 :00 13,482.0 13,483.3 6.0 3 1/8 STAGE 25 :00 13,518.0 13,519.3 6.0 3 1/8 STAGE 25 :00 13,555.0 13,556.3 6.0 3 1/8 STAGE 25 17: 13,591.0 13,592.3 6.0 3 1/8 STAGE 24 17: 13,628.0 13,629.3 6.0 3 1/8 STAGE 24 17: 13,664.0 13,665.3 6.0 3 1/8 STAGE 24 17: 13,698.0 13,699.3 6.0 3 1/8 STAGE 24 17: 13,737.0 13,738.3 6.0 3 1/8 STAGE 24 15:00 13,774.0 13,775.3 6.0 3 1/8 STAGE 23 15:00 13,810.0 13,811.3 6.0 3 1/8 STAGE 23 15:00 13,847.0 13,848.3 6.0 3 1/8 STAGE 23 15:00 13,883.0 13,884.3 6.0 3 1/8 STAGE 23 15:00 13,924.0 13,925.3 6.0 3 1/8 STAGE 23 12:15 13,956.0 13,957.3 6.0 3 1/8 STAGE 22 12:15 13,993.0 13,994.3 6.0 3 1/8 STAGE 22 12:15 14,029.0 14,0.3 6.0 3 1/8 STAGE 22 12:15 14,066.0 14,067.3 6.0 3 1/8 STAGE 22 12:15 14,102.0 14,103.3 6.0 3 1/8 STAGE 22 07:45 14,138.0 14,139.3 6.0 3 1/8 STAGE 21 07:45 14,172.0 14,173.3 6.0 3 1/8 STAGE 21 1.25